1 CHEP 2000, 10.02.2000Roberto Barbera Grid activities at the ALICE Experiment TNC2002, 03-06.06.2002 On behalf of the ALICE GRID Working Group: G. Andronico.

Slides:



Advertisements
Similar presentations
L ondon e-S cience C entre Application Scheduling in a Grid Environment Nine month progress talk Laurie Young.
Advertisements

Advanced Piloting Cruise Plot.
1 CHEP 2000, Roberto Barbera The ALICE Inner Tracking System Off-line Software CHEP 2000, (
CHEP 2000, Roberto Barbera NA3, NA4, and NA5 activities Milano, Università di Catania and INFN Catania - Italy ALICE Collaboration.
CHEP 2000, Roberto Barbera Roberto Barbera (*) GENIUS: a Web Portal for the GRID Meeting Grid.it, Bologna, (*) work in collaboration.
DataTAG WP4 Meeting CNAF Jan 14, 2003 Interfacing AliEn and EDG 1/13 Stefano Bagnasco, INFN Torino Interfacing AliEn to EDG Stefano Bagnasco, INFN Torino.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Addition Facts
DataGrid is a project funded by the European Union CHEP 2003 – March 2003 – HEP Assessment of EDG – n° 1 HEP Applications Evaluation of the EDG Testbed.
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
1 ALICE Grid Status David Evans The University of Birmingham GridPP 14 th Collaboration Meeting Birmingham 6-7 Sept 2005.
GridPP July 2003Stefan StonjekSlide 1 SAM middleware components Stefan Stonjek University of Oxford 7 th GridPP Meeting 02 nd July 2003 Oxford.
1 ALICE Grid Status David Evans The University of Birmingham GridPP 16 th Collaboration Meeting QMUL June 2006.
B A B AR and the GRID Roger Barlow for Fergus Wilson GridPP 13 5 th July 2005, Durham.
31/03/00 CMS(UK)Glenn Patrick What is the CMS(UK) Data Model? Assume that CMS software is available at every UK institute connected by some infrastructure.
LHCb Bologna Workshop Glenn Patrick1 Backbone Analysis Grid A Skeleton for LHCb? LHCb Grid Meeting Bologna, 14th June 2001 Glenn Patrick (RAL)
LHCb(UK) Meeting Glenn Patrick1 LHCb Grid Activities in UK LHCb(UK) Meeting Cambridge, 10th January 2001 Glenn Patrick (RAL)
ZMQS ZMQS
Istituto Nazionale di Fisica Nucleare Italy LAL - Orsay April Site Report – R.Gomezel Site Report Roberto Gomezel INFN - Trieste.
15. Oktober Oktober Oktober 2012.
LHCb Computing Activities in UK Current activities UK GRID activities RICH s/w activities.
Chapter 5 Test Review Sections 5-1 through 5-4.
1 CHEP 2000, Roberto Barbera Recent grid activities at INFN Catania (*) HEPiX/HEPNT 2002, Catania, (*) work in collaboration with.
Addition 1’s to 20.
25 seconds left…...
INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001.
Week 1.
CHEP 2000, Roberto Barbera The AliEn GENIUS interface ALICE Offline Week, CERN, Università di Catania and INFN Catania - Italy ALICE.
We will resume in: 25 Minutes.
1 CHEP 2000, Roberto Barbera Roberto Barbera (*) GENIUS: a Web Portal for DataGRID ACAT 2002, Moscow, (*) work in collaboration.
CpSc 3220 Designing a Database
Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
Grids e HEP. Concorde (15 Km) Balloon (30 Km) CD stack with 1 year LHC data! (~ 20 Km) Mt. Blanc (4.8 Km) Bytes 10 3 Terabytes 1 Petabyte.
1 CHEP 2000, Roberto Barbera Tests of data management services in EDG 1.2 ALICE Off-line Week,
1 CHEP 2000, Roberto Barbera Roberto Barbera (*) Grid monitoring with NAGIOS WP3-INFN Meeting, Naples, (*) Work in collaboration with.
Exploiting the Grid to Simulate and Design the LHCb Experiment K Harrison 1, N Brook 2, G Patrick 3, E van Herwijnen 4, on behalf of the LHCb Grid Group.
The EDG Testbed Deployment Details The European DataGrid Project
EGEE is a project funded by the European Union under contract IST ALICE network stress tests Roberto Barbera NA4 Generic Applications Coordinator.
Test Of Distributed Data Quality Monitoring Of CMS Tracker Dataset H->ZZ->2e2mu with PileUp - 10,000 events ( ~ 50,000 hits for events) The monitoring.
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
November 7, 2001Dutch Datagrid SARA 1 DØ Monte Carlo Challenge A HEP Application.
1 The DataGrid WorkPackage 8 F.Carminati 28 June 2001.
Jean-Yves Nief CC-IN2P3, Lyon HEPiX-HEPNT, Fermilab October 22nd – 25th, 2002.
8th November 2002Tim Adye1 BaBar Grid Tim Adye Particle Physics Department Rutherford Appleton Laboratory PP Grid Team Coseners House 8 th November 2002.
Finnish DataGrid meeting, CSC, Otaniemi, V. Karimäki (HIP) DataGrid meeting, CSC V. Karimäki (HIP) V. Karimäki (HIP) Otaniemi, 28 August, 2000.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
International Workshop on HEP Data Grid Nov 9, 2002, KNU Data Storage, Network, Handling, and Clustering in CDF Korea group Intae Yu*, Junghyun Kim, Ilsung.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
Roberto Barbera Prague, ALICE Multi-site Data Transfer Tests on a Wide Area Network Giuseppe Lo Re Roberto Barbera Work in collaboration with:
AliEn AliEn at OSC The ALICE distributed computing environment by Bjørn S. Nilsen The Ohio State University.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 WP8 - Demonstration ALICE – Evolving.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
ARDA P.Cerello – INFN Torino ARDA Workshop June
ALICE RRB-T ALICE Computing – an update F.Carminati 23 October 2001.
Status of AliEn2 Services ALICE offline week Latchezar Betev Geneva, June 01, 2005.
Roberto Barbera Prague, Dipartimento di Fisica dell’Università di Catania and INFN Catania - Italy ALICE Collaboration Update on the network.
INFNGRID Technical Board, Feb
Moving the LHCb Monte Carlo production system to the GRID
INFN-GRID Workshop Bari, October, 26, 2004
Alice Week Offline Day F.Carminati June 17, 2002.
ALICE Physics Data Challenge 3
ALICE – Evolving towards the use of EDG/LCG - the Data Challenge 2004
LHC DATA ANALYSIS INFN (LNL – PADOVA)
Alice Week Offline Day F.Carminati March 18, 2002 ALICE Week India.
ALICE-Grid Activities in Bologna
Alice Software Demonstration
Gridifying the LHCb Monte Carlo production system
Presentation transcript:

1 CHEP 2000, Roberto Barbera Grid activities at the ALICE Experiment TNC2002, On behalf of the ALICE GRID Working Group: G. Andronico (CT), T. Anticic (IRB), R. Barbera (CT), I.J.Bloodworth (Birmingham), M. Botje (NIKHEF), P. Buncic (CERN), F. Carminati (CERN), P. Cerello (TO), G. Chabratova (DUBNA), J. Cleymans (South Africa), J. G. Contreras (MERIDA), D. Di Bari (BA), D. De Girolamo (BA), J. Gosset (SACLAY), A. Grigoryan (Yerevan), M.L. Luvisetto (BO), P. Malzacher (GSI), M. Masera (CERN/TO), A. Masoni (CA), K. Mkoyan (Yerevan), D. Mura (CA), L. Nellen (UNAM), B. Nilsen (OSU), S.K. Pal (Calcutta), F. Pierella(BO), F. Rademakers (CERN), Y. Schutz (SUBATECH), E. Scomparin (TO), M. Sitta (TO), R. Turrisi (PD), D. Vicinanza (SA)

2 Roberto Barbera Outline Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration The ALICE Experiment Grid activities at ALICE: the past: tests with Globus the present: AliEn, PROOF and DataGrid tests the future: grid interoperability with AliEn Summary and conclusions TNC2002,

3 ~9 km LHC SPS CERN Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration The Large Hadron Collider TNC2002,

4 Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002, The 4 LHC Experiments

5 Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002, The ALICE Detector

6 TNC2002, Roberto Barbera The Quark Gluon Plasma Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration LHC (5.5 A TeV) The Big Bang The Little Bang

7 Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration 1/100 of a LHC ! Simulation and reconstruction of a full (central) Pb+Pb collision at LHC (about primary tracks!) takes about 24 hours of a top-PC and produces an output bigger than 2 GB. TNC2002,

8 Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration 2+ times the Eiffel Tower 600+ m ALICE data per year 2-3 Petabytes ! ˜ CD-ROM TNC2002,

9 Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration Yerevan CERN Saclay Lyon Dubna Capetown, ZA Birmingham Cagliari NIKHEF GSI Catania Bologna Torino Padova IRB Kolkata, India OSU/OSC LBL/NERSC Merida Bari Nantes ALICE computing sites today TNC2002, ~O(10 8 ) events/year ~O(10 3 ) batch and interactive users in 2006

10 Roberto Barbera Mb/s Tier 4 Tier2 Center 2.5/10 Gb/s Tier2 Center Tier 2 Computing model Monarc Project Institute Physics data cache 155/622 Mb/s Tier 3 UK Regional Center France Regional Center Italy Regional Center Germany Regional Center 622/2500 Mb/s Tier 1 Tier 0 ~1.25 GB/s Online System Online Farm CERN Computer Center Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,

11 Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration Im the impatient ALICE user checking the availability of events Anywhere Tape Pool (CASTOR/ HPSS) Im the local site manager Disk Pool Run DB Linux farm + MRTG monitor Production site Im the PPR production manager Managers site Roberto Barbera Lay-out 2000/01 Mirror DB WWW/Carrot Cron WWW/ Carrot AliEn Reposit. Install/Update Globus EnginFrame MySQL PHP Bypass bbFTP TNC2002,

12 TNC2002, Web interface to login on The Grid Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration Utilities Web interface for job submission ! CPU LoadDisk space Network availability Book keeping system Only at Lyon LDAP server for ALICE (only in Italy)

13 Roberto Barbera AliEn: the ALICE grid prototype Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,

14 Roberto Barbera AliEn architecture Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,

15 Roberto Barbera AliEn authentication Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,

16 Roberto Barbera First production with AliEn Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,

17 Local Remote Selection Parameters Procedure PROOF CPU TagD B RD B Proc.C DB 1 DB 4 DB 5 DB 6 DB 3 DB 2 Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration Unsecure or SRP (SLAC) authentication today TNC2002, Roberto Barbera PROOF: Parallel ROOt Facility

18 Roberto Barbera Experiences with DataGrid Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,

19 Roberto Barbera Experiences with DataGrid Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,

20 Roberto Barbera Experiences with DataGrid Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,

21 Roberto Barbera Experiences with DataGrid Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002, The first event on the EDG testbed Dec, 11, 2001

22 Roberto Barbera Automatic check of the Testbed Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,

23 Roberto Barbera The future: AliEn as a meta-grid Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002, AliEn User Interface AliEn stackiVDGL stackEDG stack

Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002, Application: AliRoot Data Persistency: Root Job parallelisation: Root/PROOF Job submission/control/monitoring: AliEn Data Catalogue: AliEn AliRoot AliEn API/PROOF AliEn Services (shell, web) ROOT IVDGLEDG/EDT By P.Cerello Interfacing the Grid(s) - I

Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002, AliEn Job EDG RB EDG CE EDG WN AliEn Data Catalogue EDG SE Condor-G Alice Farm Alice User I-LFN I-PFN O-PFN O-LFN,O-PFN MetaData Catalogue By P.Cerello Interfacing the Grid(s) - II

Roberto Barbera Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002, EDG WN AliEn Data Catalogue EDG SE1 I-LFN(s) O-PFN3 I-PFN(s) I-PFN3 MetaData Catalogue I-LFN(s) EDG SE3 EDG SE2 EDG CE2 EDG CE3 I-PFN2 I-PFN1 O-PFN2 O-PFN1 PROOF By P.Cerello Interfacing the Grid(s) - III

27 Roberto Barbera Summary and conclusions Due to its huge needs in terms of distributed computing power and mass storage grids are for ALICE not just an interesting computer science technology but a real conditio sine qua non. Grid activities at ALICE are successfully developing since almost two years already. Since the beginning the ALICE attitude has been very positive and propositive. If you want to see ALICE jobs running on the grid come to the DataGrid stand in the demonstrations area. Dipartimento di Fisica dellUniversità di Catania and INFN Catania - Italy ALICE Collaboration TNC2002,