1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
J. Branlard ALCPG11 – March 2011 – Eugene OR, USA Results from 9mA studies on achieving flat gradients with beam loading P K |Q L studies at FLASH.
1 STF-LLRF system and its study plan Shin MICHIZONO (KEK) LCWS12 STF-LLRF Outline I.STF system configuration S1-Global (~2011 Feb.) Quantum Beam (QB) (2012.
Lorentz force detuning measurements on the CEA cavity
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
1 9 mA study at FLASH on Sep., 2012 Shin MICHIZONO (KEK) LCWS12(Sep.24) Shin MICHIZONO Outline I.Achievement before Sep.2012 II.Study items for ILC III.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
1 LCWS10 in Beijing DRFS Development (S. Fukuda) 27/03/2010 DRFS Development KEK S. Fukuda Introduction : DRFS R&D Plan Talks concerning with DRFS in LCWS10.
Control configulation for S1G module operation H. Hayano version 1.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
Chris Adolphsen 10/03/09 MLI and HLRF Summary. Vladimir Kashikhin.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
1 LLRF Pre-readiness review (26th May, 2009) 27/10/2015 LLRF performance and its limitation based on KEK's experiments Shin Michizono (KEK) KEK’s LLRF.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
LCWS08 (Nov.18, 2008) 18/11/ Proposal of Distributed RF-source Scheme (DRFS) Shigeki Fukuda (KEK) Introduction Consideration of the cost Possible.
1 FNAL SCRF meeting 31/10/2015 Comments from LLRF Shin Michizono (KEK) Brian Chase (FNAL) Stefan Simrock (DESY) LLRF performance under large dead time.
Vladimir Kashikhin. FLASH Cavity Gradient Stability Comparison of beam-off measurements of pulse-to-pulse cavity gradient jitter during the flattop.
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
1 Simulation for power overhead and cavity field estimation Shin Michizono (KEK) Performance (rf power and max. cavity MV/m 24 cav. operation.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
S. FUKUDA LCPAC RF-Systems for STF S. Fukuda Accelerator Laboratory Content Introduction Status of STF and Plan forFY2006 LLRF Summary.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
GDE meeting Beijing (Mar.27, 2010) 1 DRFS LLRF system configuration Shin MICHIZONO KEK LLRF lack layout for DRFS DRFS cavity grouping HLRF requirements.
Detail plan of S1-Global H. Hayano (KEK),
1 LLRF requirements/issues for DRFS Shin MICHIZONO (KEK) BAW1 (Sep.8, 2010)
Performance of the cERL LLRF System Takako Miura (KEK) LLRF'15, Shanghai, Nov 4, 2015 (T. Miura) 1 Compact ERL (Energy Recovery LINAC)
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
John Carwardine TDR Writing: FLASH 9mA Experiment.
SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June,
Recent Result for the STF-2 Cryomodule Operation
ESS LLRF and Beam Interaction
S1G Experiment Schedule Plan
LLRF Research and Development at STF-KEK
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
dependence on QL can not longer be seen
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S1-G Webex meeting Global Design Effort
LLRF Functionality Stefan Simrock How to edit the title slide
CW Operation of XFEL Modules
CEPC RF Power Sources System
LLRF Comments on the RF cluster and Distributed RF schemes
Cavity Degradation Experience at S1-Global
ERL Director’s Review Main Linac
Presentation transcript:

1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

LOLB-2 (June, 2011) 2

3

4

S1 Global LLRF for 8 cav. operation All the cavities are driven by 5 MW klystron. 5 LOLB-2 (June, 2011) Digital LLRF system using an FPGA board on cPCI bit-ADCs are installed.

6 loaded-Q interlock Calculate the loaded Q from the decay of the rf signal The interlock works well and contributes to the lower heat load to the cryogenics. RF off Done LOLB-2 (June, 2011)

7 Real time detuning monitor The real time detuning monitor is quite helpful to adjust the Piezo tuners. LOLB-2 (June, 2011) detuned

8 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

Stabilities at 26 MV/m operation %rms ( in amplitude),16.5mdeg.rms(in ~ 1590us By T. Matsumoto 9 LOLB-2 (June, 2011)

RF stabilities during 2H operation 10 LOLB-2 (June, 2011) Vector sum amplitude and phase are kept constant during 2H operation. Gradient Amplitude stability Phase stability

11 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

LOLB-2 (June, 2011) 12

Dynamic detuning compensation with piezo 13 LOLB-2 (June, 2011) Piezo works well to compensate the dynamic detuning

Detuning change during 2H operation 14 LOLB-2 (June, 2011) DESY: 33Hz, FNAL:12~38Hz, KEK: 5~10Hz quench Rather stiff at A-1~4. (~1/4 compared with C-1~4) FNAL DESY KEK

Ql change during operation 15 LOLB-2 (June, 2011) Ql changes are also observed at KEK. This is still open question. (difficult to explain by only coupler lod) FNAL DESY KEK

16 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

Cavity equation 17 The cavity should satisfy the differential equation. In addition directivity (~20dB) of rf monitor-coupler should be concerned. -> The directivity can be corrected using this formula. LOLB-2 (June, 2011)

Quench phenomena 18 LOLB-2 (June, 2011) Loaded Qs are calculated from cavity differential equation. Only the end of rf pulse shows the quench. Rather stiff at A-1~4. (~1/4 compared with C-1~4)

Quench phenomena (2) 19 LOLB-2 (June, 2011) Detuning change at C-4 affects the VS leading to C-1 Quench

20 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

LOLB-2 (June, 2011) 21

LOLB-2 (June, 2011) 22

LOLB-2 (June, 2011) 23

LOLB-2 (June, 2011) 24 Schematic of the DRFS at S1-global DRFS #1 DRFS #2 MA modulator

LOLB-2 (June, 2011) 25 DRFS klystron and WG system with module Feb.8 :

LOLB-2 (June, 2011) 26 DRFS klystron and WG system Feb.8 : Phase shifter

Some photos 27 DRFS #1 DRFS #2 Modulator on the ground LOLB-2 (June, 2011)

Some photos (2) 28 DRFS #1 Phase shifter MA modulator LOLB-2 (June, 2011)

HLRF and LLRF 29 LOLB-2 (June, 2011) Magic-T and WG system LLRF rack is located just downstream of cryomodule -> radiation dose will be measured.

S1 Global 3 rd stage (DRFS) ( 1 ) Digital system is located in the tunnel Fast interlock (and Arc detectors, VSWR meter) are located on the ground. cPCIs are used for the monitor and also they are the backup digital system. 30 LOLB-2 (June, 2011)

31 Field regulation with uTCA LOLB-2 (June, 2011) cERL like uTCA FPGA system was installed. An FPGA board have 4 16-bit ADCs and bit DACs. Two cavity-pickups, klystron output, reflection are observed. The system was located in the tunnel.

RF distribution at DRFS One klystron drives two cavities. Circulator-less system. Same (amplitude and phase) reflection signals go to the dummy load.(blue line) Un-balanced reflection signals move to the klystron. (red line) -> careful operation is required to protect the klystron. Phase-shifters are introduced to evaluate the system. (not to be used at ilc-DRFS) 32 LOLB-2 (June, 2011)

Circulator-less system Elimination of circulators are proposed at DRFS. The study to eliminate the circulators were partly carried out at STF-1. However, there was a big circulator between cavities and a klystron. This is the first time to eliminate all the circulators. Cavity input Normalized by klystron output Cavity input exists even after RF off With circulators Without circulators | Vf | Vf amplitude ratio (%) 33 LOLB-2 (June, 2011) Results at STF-1

34 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

Cavity equation 35 The cavity should satisfy the differential equation. In addition directivity (~20dB) of rf monitor-coupler should be concerned. -> The directivity can be corrected using this formula. LOLB-2 (June, 2011)

Diagnostics (Ql evaluation) 36 The simple Ql estimation from decay curve does not work when the rf input exist after rf switched off. The calculated Ql values agree well between filling and decay. Although simple Ql calculation is useful for interlock, this is not sufficient for diagnostics. LOLB-2 (June, 2011) Ql at filling Cav1 Cav2 Ql at decay Ql from decay

37 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

Typical operation of VS control Under the low reflection condition, VSWR is ~ LOLB-2 (June, 2011) Pf Pb to kly.

Detuning and Ql under typical operation Loaded Qs calculated simple time decay are not correct. 39 LOLB-2 (June, 2011) Cav. C-1 Cav. C-2 Red:Ql by decay Blue: Ql by cavity eq.

Un-matched operation with VS control (different detuning) Reflection to the klystron is ~25kW (max VSWR=3) Vector sum is still regulated. (0.04%rms, 0.06deg.rms) 40 LOLB-2 (June, 2011) Pf Pb to kly.  f1>  f2

Un-matched operation (detuning and Ql) Although Qls by decay show low-value, Qls based on cavity equation show reasonable values. 41 LOLB-2 (June, 2011) Cav. C-1 Cav. C-2 Red:Ql by decay Blue: Ql by cavity eq.

Un-matched operation with VS control (different waveguide-length) 42 LOLB-2 (June, 2011) Reflection to the klystron is ~20kW (max VSWR=2.8) Vector sum is still regulated. (0.015%rms,0.07deg.rms) Pf Pb to kly.  f1~  f2

Un-matched operation (detuning and Ql) Ql by decay: ~4e6 Ql by cavity equation: ~2.5e6 43 LOLB-2 (June, 2011) Cav. C-1 Cav. C-2

44 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

Adaptive detuning correction via EPICS DC piezo bias is controlled every ~2 min. for detuning correction. The detuning after filling were kept constant 45 LOLB-2 (June, 2011) Even these simple (and slow) detuning correction looks promising to compensate the long-time detuning fluctuation (microphonics). Piezo output to change from 0Hz to -50Hz Detuning correction

LOLB-2 (June, 2011) 46 RF waveform and detuning

47 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

LOLB-2 (June, 2011) 48 RF 4% Minimum 3% rf overhead is necessary. If we allow 50Hz detuning, 7% overhead is required. 10% overhead necessary. 11% Average power Variation inside pulse

Long term stability (microphonics) 49 LOLB-2 (June, 2011) A-2 A-3 No piezo control Microphonics are about 3~5Hz rms. Since KEK cavities are stiff enough, the effect of adaptive piezo control is not clear. Adaptive control

50 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation (S1 global) Total eight cavities are installed. Rather short time operation (for total 3 months, Mon. to Fri. from 1PM to 7PM.) No beam operation With circulators at individual input coupler Dynamic detuning control with piezo Vector sum operation Quench analysis II. DRFS operation (aiming for ilc) One klystron drives two cavities. Total 2 klystrons are used. No beam operation Without circulators Dynamic detuning control with piezo Slow detuning control with piezo III. Future plan Related topics -Performance -Diagnostics -Piezo control(8cav. &DRFS) -Quench phenomena (8cav. &DRFS) -Rf overhead (8 cav. &DRFS) - Circulator-less (DRFS)

LOLB-2 (June, 2011) 51 Future plan at STF Quantum beam project: with beam from Jan STF-2 project: with beam from April 2013.

LOLB-2 (June, 2011) 52 Future plan

RF gun cavity and input coupler were fabricated by FNAL. (DESY- FNAL-KEK collaboration) FNAL delivered gun cavity and input coupler in November RF process up to 1.7MW in More high power process (3.5MW) and beam extraction in DESY-FNAL design RF gun, FNAL fabrication. input coupler Photocathode insertion Photocathode RF gun for beam supply to Cryomodules Photocathode RF-gun in STF gun cavity cavity photocathode chamber input coupler Solenoid magnet 53 LOLB-2 (June, 2011)

Two 9-cell cavities : 15.2MV/m operation Capture Module Cavities: MHI-012, MHI-013 Similar Structure to ILC Cryomodule, except the length 54 LOLB-2 (June, 2011)

55 Thank you for your attention