FRONT VIEW OF THE PORTAL WEST BUILDING.

Slides:



Advertisements
Similar presentations
I Can Draw A Map By Jena Carroll.
Advertisements

Education 2012 Presented by Marina Ward. Online Catalogue: Searching the Catalogue PIN Reading History How to find journal articles (2 nd Term)
Crescent Academy International
South Dakota State Capitol South Dakota State Capitol Built between 1905 and 1910 Created by: Jill Kotalik.
West Wall Compressor Requirements West Wall Mezzanine Move compressors to the West Wall to distance from magnetic field Find compressor position on West.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Campus signage – Internal
West Barn, Lewis & Clark County Fairgrounds HABs Photos Presented by Pam Attardo Historic Preservation Officer.
Urban Art Bar. scrawl 2002 Objective To introduce modern day urban art to Scotland through a major part of it’s culture… Drink To become a part of the.
BUILDING SECURITY AT 777 N CAPITOL STREET. Security Problems  Building designed for ease of access in 1989  Direct access from garage  Three diverse.
3a. Pursue funding for the program plan to effect a transformation that is almost complete…Information Commons.
November 7 th. 1. Which of the following is true about store layout? a. POS displays are usually not very effective b. You should move staples around.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Adobe Digital Studio Renderings (as of October 2014) RM Cooper Library Spring 2015.
Elevations.
Chapter 14 Legal Descriptions and Site Plan Requirements.
ABOUT RANGE MEDIA Range Media is an independent outdoor advertising company operating in South Africa. We specialize in billboard, wall display and other.
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
C Casaccio Architects LLC 2011 Thomas Memorial Library Authentic Indigenous Intimate Timeless Whimsical A Vision for “A Lighthouse of Knowledge”
Building Plans.
ArtBash Columbus Building Columbus Drive. Outside/1st Floor Note: All works in first floor display cases should be.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
Some of the best books of  &mid= A23D2FC75CD A23D2FC75CD7.
By: Sheldon Miller.  Find a computer in the library and login.
Co-Housing Design Project in Point St. Charles Krys Wodzicki # Design Project I Professor P. Sijpkes April 18th, 2000.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
ELITE PROGRAM What does it mean for you?. Preserving the Value In order to protect Elite Dealers from predatory Internet Transactions Elite Dealers will.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
Welcome to …. BOUTIQUE ON UNIQUE LOCATION Located on Sukhumvit Soi 15, main road. 3 minutes to BTS and MRT. Close to Terminal 21 (newest stylish shopping.
Computer Visualization Final Project The Rusakov Club Sheridan College Architectural Technology Course: Architectural Computer Visualization 1 By Jonathan.
Elevations McMillan Villas May 30th 2015.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
1130 Connecticut Ave. Washington, DC * 218,750 SF Bldg *25% Vacancy * Built 1986 * Rent = ~$46/SF * Office Building * Valuation =~$91M.
All About Maps Beth Clause. How Firefighters Use Maps.
North Augusta High School Design Development Presentation.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
Start on Europe. Walk to Africa. What direction did you walk? Start on Antarctica. Walk to Australia. What direction did you walk? Start on Asia. Walk.
November 9, 2010 From Third Ward to Treville: Catalyst for the 22nd Century City A Sustainable A SustainableVision for for OUR Future A Sustainable A SustainableVision.
Sectionalism Map Assignment
Find that place..  Find that content  Longitude, East is to the right, West is to the left of the Prime Meridian or 0 degrees  Latitude, North is going.
Communities All over the world, people live in communities.
DC Office of Cable Television, Film, Music & Entertainment Angie Gates, Director Proposed Transition Marquee Branding.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Cupid Shuffle.  Everyone find a line on the floor and face the stage.  Now put your arms stretched out to your sides, you should not be able to touch.
MOSCONE EXPANSION PROJECT OCTOBER 21, 2013 Civic Design Review – Phase I.
Elevation- an artistic drawing of the set from the audience’s point of view.
LOGO Организация кредитования в Республике Беларусь Костенко А.К., к.э.н., доцент.
涉外合同中的法律适用问题 --- 以上海地区为例 Group 2 吕雅丽 王燕玉 刘彧 孙煜 韦卫玲 李天奇 LOGO.
Click here for the LIVE WEBCAM
Signage Upgrade Project 2016
Hotel Dvorec Sela.
Columbus State Community College
Make Your Expo Marketing Dollars Deliver Extra Dividends
Time Interval(Δt) Time (t) is a concept that describes when an event occurs. Initial time (ti) is when the event began. Final time (tf) is when the event.
Instructor: C. Koutsougeras
INTD 405 Modern Practices in Interior Design PLANS
Thatch House (Plan) Fig.4.
Time Interval(Δt) Time (t) is a concept that describes when an event occurs. Initial time (ti) is when the event began. Final time (tf) is when the event.
STORE MANAGER RESPONSIBILITIES.
Mathematics Unit 45: Twisted Building

Why would the South differ from the North in the 1800’s?
Omnilore at Beach Cities Health District
North Augusta High School – Phase 2A and 2B
Chapter 1 Basics of Geometry.
When Berlin was a walled city
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
Presentation transcript:

FRONT VIEW OF THE PORTAL WEST BUILDING

T I INAUGURATION OF THE PORTAL WEST BUILDING NOVEMBER 23, 2007

Inauguration program of the Portal West Building November 23, 2007

Dumaguete City Mayor Perdices speaking at the Portal West Building inauguration

A view of the lobby with the building credits and the SUACONA logo

Artist’s conception of the South lobby wall with the Tree of Life containing 350 leaves and 5 rocks. A counterpart Tree of Life will be built on the North lobby wall for a total of 700 leaves and 10 rocks.

Portal West building lobby North wall where the second Tree of Life will be installed

Mock-up computer interactive display and building directory located at the lobby

Elevator shaft wall where recognition plaques for generous contributions will be placed Elevator shaft wall where plaques recognizing generous contributors will be located

First floor view of the National Book Store, Portal West’s first tenant and the very first national book store chain in Dumaguete.

Mezzanine section of the National Book Store

One of the stores in the mezzanine lobby of the Portal West Building

Other stores in the mezzanine lobby of the Portal West building

Second floor lobby of the Portal West building showing one of the stores – an Internet Cafe

The Urban Walk Boutique located at the second floor

The “Pink-A-Holic” Store on the second floor of Portal West