1 Global Tropospheric Winds Sounder (GTWS) Reference Designs Ken Miller, Mitretek Systems January 24, 2002 15-Jan-02.

Slides:



Advertisements
Similar presentations
Airborne Doppler Wind Lidars for Climate and Weather Forecasting G. D. Emmitt Simpson Weather Associates Charlottesville, VA.
Advertisements

ESTO Advanced Component Technology 11/17/03 Laser Sounder for Remotely Measuring Atmospheric CO 2 Concentrations GSFC CO 2 Science and Sounder.
CALIPSO and LITE data for space-based DWL design and Data utility studies: Research plans G. D. Emmitt Simpson Weather Associates D. Winker and Y. Hu (LaRC)
1 Doppler Wind Lidar Technology Roadmap Ken Miller, Mitretek Systems Coauthors –see Reference 2 January 27, 2004.
Performance characteristics and design trades for an ISS Hybrid Doppler Wind Lidar G. D. Emmitt and S. Wood Simpson Weather Associates Charlottesville,
The ICESat-2 Mission: Laser altimetry of ice, clouds and land elevation T. Markus, T. Neumann NASA Goddard Space Flight Center W. Abdalati Earth Science.
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Engineering Team (ET) 2 nd NASA PACE SDT Meeting 14 March 2012.
EVM-2 Notice of Partnership Questions and Answers January 23, 2015.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Space Engineering 2 © Dr. X Wu, 2012
Indian Ocean METOC Imager (IOMI) Operational Concept Demonstrates Military Operational Utility and Enables Improved Global Weather Prediction Data to Naval.
G O D D A R D S P A C E F L I G H T C E N T E R Goddard Lidar Observatory for Winds (GLOW) Wind Profiling from the Howard University Beltsville Research.
Final Version John Martin May 13-17, 2002 Opening Comments Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
B. Gentry/GSFCSLWG 06/29/05 Scaling Ground-Based Molecular Direct Detection Doppler Lidar Measurements to Space Using Wind Profile Measurements from GLOW.
An In-depth Look at ICESat and GLAS By: Vishana Ramdeen.
Global Wind Demonstration Project John Pereira NESDIS Office of Systems Development Jim Yoe NESDIS Office of Research and Applications January 24, 2002.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Pointing Determination for a Coherent Wind Lidar Mission
B. Gentry/GSFCGTWS 2/26/01 Doppler Wind Lidar Measurement Principles Bruce Gentry NASA / Goddard Space Flight Center based on a presentation made to the.
Preparing for a Wind Lidar Venture Class Mission Discussion at Lidar Working Group Meeting Bar Harbor, ME August 24 – 26, 2010 Dr. Wayman Baker 1.
January 24, 2002 Key West, FL Lidar Winds Working Group Meeting GTWS SDT-Yoe & Atlas Science Definition Team Activities and the GTWS Draft Data Requirements.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
Guidance and Navigation
Update on Hybrid Detection DWL Study* G. D. Emmitt WG on Space-based Lidar Winds Oxnard, CA 7-9 February, 2001 *funded by the IPO.
Update on NASA’s Sensor Web Experiments Using Simulated Doppler Wind Lidar Data S. Wood, D. Emmitt, S. Greco Simpson Weather Associates, Inc. Working Group.
Spaceborne 3D Imaging Lidar John J. Degnan Geoscience Technology Office, Code Code 900 Instrument and Mission Initiative Review March 13, 2002.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
COST 723 Training School - Cargese October 2005 OBS 3 Radiative transfer for thermal radiation. Instruments Bruno Carli.
Kavaya - 1 Components of the Space-Based Lidar Winds Roadmap Michael Kavaya, Farzin Amzajerdian, Grady Koch, Jirong Yu, Upendra Singh NASA/LaRC Working.
NPOESS DWL Mass and Power Estimation Ken Miller, Dave Emmitt, Bruce Gentry, Raj Khanna Key West WG Meeting January 20, 2006.
NASA ESTO ATIP Laser Sounder for Remotely Measuring Atmospheric CO 2 Concentrations 12/12/01 NASA Goddard - Laser Remote Sensing Branch 1 James B. Abshire,
Status of the P3DWL investigations on NOAA aircraft Emmitt (SWA) Atlas(AOML/NOAA) Eleuterio (ONR/USNavy) DWL WG Meeting 24 – 26 August 2010 Bar Harbor,
Wind Lidar Working Group, 29 June 2005 Welches, OR Doppler Lidar Scanning Telescope Technology Geary Schwemmer Meeting of the Working Group on Space-based.
HOLOGRAPHIC SCANNING LIDAR TELESCOPES Geary K. Schwemmer Laboratory For Atmospheres NASA Goddard Space Flight Center
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
© 2008 Noblis, Inc. Planning for DWL Airborne Demonstration - Discussion Ken Miller Lidar Working Group Monterey CA February 7, 2008.
Competition Sensitive Gabe Karpati June 28, 2001 SuperNova / Acceleration Probe (SNAP) System Overview.
1 Summary of Global Tropospheric Wind Sounder (GTWS) Technology Roadmap Ken Miller, Mitretek Systems June 23, 2003.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
Orbital Analysis for Inter-Calibration Dave Mac Donnell Brooke Anderson Bruce Wielicki Don Garber NASA Langley Research Center Solar Workshop January 30,
1 Architecture Alternatives for the DWL Space Demonstration Ken Miller Mitretek Systems June 28, 2006.
Ball Aerospace & Technologies Corporation -
GWOLF and VALIDAR Comparisons M. Kavaya & G. Koch NASA/LaRC D. Emmitt & S. Wood SWA Lidar Working Group Meeting Sedona, AZ January 2004.
Science Mission Directorate Meeting of the Working Group on Space-Based Lidar Winds: View from NASA Headquarters Ramesh Kakar Weather Focus Area Leader.
Ocean Color Research Team Meeting May 1, 2008 NPOESS Preparatory Project (NPP) Status Jim Gleason NPP Project Scientist.
Planned Simulations for New Nature Run G. D. Emmitt, S. Greco, S. A. Wood and C. O’Handley Simpson Weather Associates OSEE meeting November 16, 2006.
Kavaya-1 Coherent Doppler Lidar Roadmap to Both the NRC Decadal Survey “Science Demonstration” and “Operational” Missions Michael J. Kavaya Jirong Yu Upendra.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Status of Preparation of Manuscript for DWL BAMS Article Discussion at Lidar Working Group Meeting Miami February 8 - 9, 2011 Dr. Wayman Baker 1.
NPOESS P 3 I Space Demonstration of 3D wind observations using Doppler Wind Lidar (DWL) DWL Mission Definition Team April 18, April 05.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Instrument Synthesis.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Wayfarer Ryan Stelzer Dr. David Gaylor April 16 th, 2016 Arizona Space Grant Symposium.
DWL Operations within a Sensor Web Modeling and Data Assimilation System:Recent Results M. Seabloom, S. Talabac, G. McConaughy, J. Ardizzone, G. Brin,
Clouds, shear and the simulation of hybrid wind lidar
Maxim Pathfinder Prework 16 August 1999
Technical Resource Allocations
Status of Hybrid DWL Study
Overview of the GSFC Integrated Design Center (IDC)
Validation of airborne 1
GLAS Cloud Statistics and Their Implications for a Hybrid Mission
NPOESS P3I & Follow-on Threshold Operational Mission
Presentation transcript:

1 Global Tropospheric Winds Sounder (GTWS) Reference Designs Ken Miller, Mitretek Systems January 24, Jan-02

2 Agenda GTWS Mission Objective Purpose Draft Wind Data Product Requirements Rapid Design Reference Instruments Reference Missions Direct Mission Conclusions Acknowledgments

3 Purpose Mission Objective is to acquire global wind velocity profiles per NASA/NOAA requirements Purpose of Briefing is to discuss Government Reference Designs for Direct and Coherent Instruments Direct Mission Coherent Mission design scheduled Feb 2002

4 Purpose of Reference Designs To establish instrument and mission architectures for reference purposes Identify tall poles (technology readiness and risk) Provide information to support a basis for government cost estimate Provide sanity check information for assessing future concepts It is not assumed that future implementations will physically match study results

5 Draft Wind Data Product Requirements Threshold and Desired requirements prepared by the GTWS Science Definition Team (SDT) Reconciled between NASA and NOAA users Threshold requirements were minimum for useful impact on models Posted for comment Oct 16, Document See Yoe/Atlas presentation

6 Rapid Design Environments at NASA GSFC ISAL Instrument Synthesis and Analysis Laboratory Rapid instrument design and concepts for remote sensing 2 week GTWS studies IMDC Integrated Mission Development Center Rapid mission engineering analyses and services Concepts, trades, technology and risk assessment 1 week GTWS studies

7 Rapid Design Areas ISALIMDC Systems Electro-mechanical Mechanical/Structural Thermal Optical Laser Electrical Integration & Test Detectors Costing Systems Mission Design Attitude Control System Propulsion Mechanical Thermal Power Command & DH Communications Flight Dynamics Flight Software Reliability Integration and Test Spacecraft bus Launch Vehicle Ground Systems Data Processing Mission Operations End of Life Disposal Costing

8 Reference Instruments Direct and Coherent lidars Meet threshold data requirements, including 0 to 20 km altitude Target Sample Volume (TSV) Maximum volume for averaging laser shots 2 perspectives per TSV Reference atmosphere including cloud coverage and shear 2 year mission life Exceptions Single laser designs may not meet lifetime requirement Single satellite did not meet temporal resolution requirement

9 Reference Instruments (cont’d) Do not provide Implementation recommendations or preferences Exhaustive technology trades Basis to compare direct and coherent approaches General limitations Based on first-cut point designs, not optimized Numerous assumptions need verification Low TRL components May not meet all requirements Requirements refined during design period Some details are competition sensitive

10 Reference Instruments- Design GTWS Team guidance on point designs Direct– Bruce Gentry (NASA GSFC), Sept 2001 Coherent– Michael Kavaya (NASA LaRC), Dec 2001 Parameters 400 km circular orbit, 97 o inclination, sun synchronous, dawn/dusk 100% duty cycle Nadir angle 45 o Scan discrete azimuth angles Point (~ 1 s) and Stare (~ 5 s) 4 cross-track soundings, 4 positions fore, 4 aft

11 Measurement Concept 7.7 km/s 400 km 585 km 414 km 290 km 45° 7.2 km/s Horizontal TSV Vertical resolution range gates 45 o nadir angle Scan through 8 azimuth angles Fore and aft perspectives in TSV Move scan position ~ 1 sec No. shots averaged ~ 5 sec * prf Aft perspective

12 Reference Instruments - Concepts Telescope with Sunshade Radiator (Solar Array not shown) Rotating Deck Coherent Direct Belt Drive Solar Array (Radiator not shown) Component Housing Component Boxes

13 IMDC Direct - October 2001 Coherent - February 2002 Large, heavy spacecraft with high power requirements 400 km orbit is challenging Altitude tradeoff between lidar SNR and orbit maintenance Solar array & radiator in orbital plane to reduce drag Battery power during eclipse (max 25 min/day) Delta L, long fairing option Current technology spacecraft Conventional hydrazine propulsion Direct Mission Highlights

14 Direct Mission Highlights (concluded) TDRSS Demand Access Downlink Controlled disposal at end-of-life COTS-based Mission Operations Center, 8x5 operations Data System Internal computer 70 Gbits storage for 3 days

15 Direct Mission Launch Configuration

16 Direct Mission - Deployed Configuration Concept TDRS Antenna SC Bus Solar Array Instrument Radiator Belt Drive Rotating Mechanism

17 Direct Mission Technology Readiness Level (TRL) Low instrument TRL: development, test, and demonstration are needed Spacecraft Overall TRL: 6 Definitions TRL 6: System/subsystem model or prototype demonstration in a relevant environment (ground or space) TRL 7: System prototype demonstration in a space environment TRL 8: Actual system completed and "flight qualified" through flight test demonstration (ground or space)

18 Conclusions Mass, size, and power are very large Need to increase instrument TRL Assumed lasers are well beyond current on-orbit laser power, efficiency, and lifetime Desirable laser improvements Increase optical output to reduce telescope size and mass Increase efficiency to reduce power and heat Increase life expectancy Increase DWL experience across range of atmospheric conditions Reduce risk: Scanner Momentum compensation Lag angle compensation Other areas

19 Conclusions (cont’d) Still a lot to learn and assess - including Fundamental differences between data products from direct and coherent lidars Global cloud and aerosol distributions Data product impacts from Clouds Aerosol distribution Wind shear Solar backscatter Spacecraft pointing and jitter

20 NASA Farzin Amzajerdian, Coherent Lidar Engineer, Robert Atlas, Science Definition Team Lead, James Barnes, GTWS Program Executive, Jennifer Bracken, ISAL Team Lead, Dave Emmitt, Senior Scientist, Bruce Gentry, Direct Lidar Principal Investigator, Gabe Karpati, IMDC Systems Engineer, Michael Kavaya, Coherent Lidar Principal Investigator, John Martin, IMDC Team Lead, Ken Miller, Systems Engineer, Mike Roberto, ISAL Systems Engineer, GTWS Team IMDC Teams ISAL Team NOAA John Pereira, Program Manager, James Yoe, Science Definition Team Lead, Acknowledgments