PP/57/01 ACTIVITY PLANNING: THE ISSUE The need for more transparent activity planning, particularly in the area of mobile and platform rigs and well services.

Slides:



Advertisements
Similar presentations
Mariner – a project in the making 20 December
Advertisements

Company Profile 1.
Monitoring for structural assessment Koenraad Van Balen, Luc Schueremans Inauguration UNESCO Chair on Preventive Conservation, Maintenance and Monitoring.
Insert the title of your presentation here Presented by Name Here Job Title - Date Social networking sites as a means to encourage sustainable mobility.
DROPS Forum - BP Trends in North Sea Drilling Sean Young Wells HSE Advisor Marcliffe Hotel April 2011.
Determining Compliance with 30 CFR 56/ MSHA Inspector Training.
Mine Operator Requirements under 30 CFR 56/
Marine Asset Tracker Ship Security Alert System
“Changing Industry Demands Redesign the OSV’s” 1 This paper was first presented at the “ 4 th International Conference on Technology and Operation of Offshore.
ASIA GEOSPATIAL FORUM 2011 Sustaining Geospatial Data Integrity for Safe Exploration & Production (E&P) Operation By: Razali B Ahmad, Saiful Nizam B Mustafa,
Results Announcement March 23, 2004 China Oilfield Services Limited.
Waking the sleeping giant 1 Johan A Johansen, VP Operations, Statoil Aberdeen.
Helix Energy Solutions Group, Inc. (HLX) NYSE Recommendation: BUY Price (10/3/14): $21.55.
Aberdeen-Stavanger Gateway. DOF Subsea 2 Welcome Giovanni Corbetta, Managing Director DOF Subsea, part of the DOF Group.
WELCOME OSM – it’s all about people! always on. OSM CEO Geir Sekkesæter At OSM we focus on Quality and Competence in each of our business segments, as.
Unit 4: Primary Resources Energy from the Oceans.
OCEN 201 Introduction to Ocean & Coastal Engineering Offshore Structures Jun Zhang
Industry Competency Training
Lec#14.  Disable person needs equipment with the degree of impairment and desired degree of independence in area of personal care, mobility, leisure,
1 STAMP, INC. (Safety Training Accreditation Management Process)
QUALITY ENERGY SERVICES Liftboat & Marine Services Your Well Productivity is Our Priority Global Lift 2.
Lesson 8 Offshore Drilling
Norwegian Drilling Academy AS. NORTRAIN history 1976 – established North Sea Drilltrainer AS, the first Norwegian drilling school 1999 – bought Transocean.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
MCS Business Profile Yr Copyright (C) MCS 2013, All rights reserved. 2 MCS Business Focus MCS Business Profile MCS has a business.
Design of Drilling Contracts – Economic Incentives and Contractor’s Focus on HSE Presented by Anders Toft SPE International Conference on Health, Safety.
Current and Emerging Trends in the Gulf of Mexico Andrew Slaughter, Vice-President, Energy Insight 2013 UK Trade and Investment Breakfast at Offshore Technology.
The ERC® Broker’s Market Analysis and Strategy Report
1 Overview Charlie Williams – Shell API Summer Standardization Conference 28 June
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
MCS Business Profile Yr Copyright (C) MCS 2013, All rights reserved. 2 MCS Business Focus MCS Business Profile MCS has a business.
CustomWare Asia Pacific Pty Ltd All Rights Reserved Integration Quality Assurance – WmUnit.
Drilling & Rig Services 1 LAND RIGS -Insert text OFFSHORE RIGS -Insert text SPECIALTY RIGS -Insert text DRILLING EQUIPMENT MANUFACTURING -Insert text DIRECTIONAL.
WORK BOAT RENTALS 1307 Tool Dr. New Iberia, La PH: Fax:
1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.
Cloud Computing Project By:Jessica, Fadiah, and Bill.
Collaboration | commercialisation | diversification | internationalisation Subsea UK Planned Events Shaping the Events for 06 and 07 Patrick O’Brien Director.
PHASE 7 FACILITIES ENGINEERING
WOLD WIDE HYDRAULIC SERVICE AND COMMISSIONING. YOUR SOLUTION PROVIDER Global expert in hydraulics and lubrication solutions. We have specialist competences.
Mod 0273: Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements – National Grid NTS Response.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Protective Coatings Specified for the Upstream and Downstream of the Oil and Gas Industry Presented by: Kristin Leonard, Bechtel.
Investor Presentation Oslo / London February
YOUR RELIABLE PARTNER BINTANG SUBSEA.
Title of Powerpoint Subhead Name of Presenter Title of Presenter, Company Date of Event Location of Event ©2015 American Bureau of Shipping. All rights.
Offshore Research AS 1 Offshore Markets Offshore Research AS 2 Business concept Data from several reliable sources are processed, interpreted.
1 Presentation to the Alaska Senate Resources Committee
1 Getting the most from your housing & repairs software systems G 28th November 2013.
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
1 AADE Operator’s Forum ConocoPhillips Alaska, Inc Outlook Randall Kanady Staff Drilling Engineer CPA Drilling and Wells.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
Foundation Repair in Kansas City
A Predictive Maintenance Strategy based on Real-Time Systems
(Simultaneous operations)
THE RELEVANCE OF SURVEY APPLICATION IN OFFSHORE CONSTRUCTION
Bloomin Brands Inc. Service Channel Training
CORPORATE PROFILE.
Usually occur every 3 to 5 years.
Raychem RPG Limited LIVE Pipeline Building for Increased Revenue EBS
Summary of JIP Objective:
nordic plan: insuring the special needs of MOUs and their construction
Technip USA – Prophix story
Click to buy Frequency of Inspection/Test Low risk: Offices, Shops, Hotels, Nursing Homes Type Class I Class II insp. test insp. test Stationary 24.
HFPP High Friction Pigable Plug Pipeline Isolations
Flexible & Efficient – Run of Site
European Spallation Source ERIC Procurement
Multiply Your Impact – Audience Targeting
© 2016 Global Market Insights. All Rights Reserved Subsea equipment Market trends research and projections for 2019 – 2025.
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

PP/57/01 ACTIVITY PLANNING: THE ISSUE The need for more transparent activity planning, particularly in the area of mobile and platform rigs and well services was stressed. It was suggested that a 12 to 18 month rolling plan, conducted by a third party such as Petrodata or Bassoe, providing data by operator, would assist. It was believed such data were available to each operator and companies should be encouraged to be responsive to contractors needs. Specifically: For efficient deployment of resources activity plans should be: Easier to access Segment specific Operator specific More accurate / frequently updated

PP/57/01 Activity Plans: Segmentation Seismic Mobile Offshore Drilling Units (semis, jack up activity of any kind) Well Intervention vessels Platform Drilling and Workover Operations (with rotary rig) Platform Workover Operations (non rotary work, CTD etc) Surveys Offshore Construction Subsea (pipelines, manifolds etc) Offshore Construction Jackets, Topsides. Major Platform modification Platform Production Operations (Operators, maintenance etc) Platform Maintenance shutdown Inspection Repair and Maintenance vessels

PP/57/01 Activity Plans: Visibility 12 month, ideally 18 month, rolling plan Min Quarterly, max monthly updates

PP/57/01 Activity Plans: The Prize Availability of Resources Efficient deployment Lower costs

PP/57/01 Activity Plans: Issues Access via individual companies or third parties? Activity plans per Operator could be a problem?