Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102,000.00 (Ph. 1) Source of Funds:Fund.

Slides:



Advertisements
Similar presentations
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
Advertisements

By: Masud-ul-Hasan Experiment 8 How will be the shift registers used here?
366,84 m2 114,09 m2 220,84 m262,34 m2 Renaissance Premium have 2 underground parking floors which let 66 cars to park safely. 1 st Floor Bank Cafe Renaissance.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
Emaar Residences (launching soon- Q4 2014). Plot IDLand-UseNLAGIFANSATCA No. of Units ResidentialRetail E5 Residential / Commercial Tower 10,17851,89144,10868,
Phase Difference = Phase Difference = 0.05.
Cleveland Heights – Neighborhood Meeting January 7, 2015.
Barton St Peter’s Advent Calendar.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
The…. A Fractured Fairy Tale by:. The Original Story.
1 Academic Writing Formats MLA Modern Language Association - English & Humanities APA American Psychological Association - Social Sciences.
2008 CRCT Domain Summary Beecher Hills Elementary School Numbers Represent the Average % Correct in Each Domain SRT-1.
Property Particular Project Name: Saigon Centre phase II Chuang’s Properties Vietnam Limited Room 704, 7 th Floor, Capital Building, 6 Thai Van Lung, District.
North Augusta High School Design Development Presentation.
Guitar Chords. G First finger 2nd fret, 5 th string. Second finger 3 rd fret, 6 th string. Third finger 3 rd fret, 1 st string.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
TECHNICAL DATA TOTAL AREA 422,87 sqm GROUND FLOOR 204,17 sqm FIRST FLOOR 218,70 sqm.
© The Concept Factory © Science Link | 2© Science Link 2013  Three calls during Results:  66 applications, companies from 8 countries.
In the first pass, the first two numbers are compared. The shuttle sort compares the numbers in pairs from left to right exchanging when necessary.
MGH 2.0 Marin General Hospital Finance Committee Meeting November 19, 2015.
Black Belt LTLT LTLT Scientific Procurement Black Belt Finance HR Site Head LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT Executive Office.
Property Particular Project Name: Lim Tower Chuang’s Properties Vietnam Limited Room 704, 7 th Floor, Capital Building, 6 Thai Van Lung, District 1, HCMC.
OWNER Emmalyn A. Sacdalan S E A R I D G E acdalan mmalyn lmera ealty nvestment evelopment in reen nvironvent Owner.
THE LOCATION Building Stack Basement Parking units Ground Floor -Corporate & Residential Lobby -4 Commercial Units 2 nd Floor- 3 rd Floor-Commercial.
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
Advanced Planning Brief to Industry (APBI) Robert L. Capers Jr., Director AE & Construction Policy Office of Construction & Facilities Management (CFM)
All Saints Library Manchester Metropolitan University Library Sir Kenneth Green Library.
High School Presentation to LAUSD's Career Technology Education Advisory Council.
Presentation Title.
Presentation Title.
Arithmetic and Geometric Means
Inspire Elementary School
Presentation Title Name Affiliation Date.
A Fractured Fairy Tale by:
Board of Trustees Meeting
Shuttle Sort Example 1st pass Comparisons: 1
Mona Lisa Project Using Image Blender to change this famous portrait in four different ways Created by:
The Derivative as a Function
Grade one First term Second term Learning unit Learning unit
Phone Number BINGO!!!.
TITLE - TITLE - TITLE Subtitle – Subtitle - Subtitle
Australia & Oceania ABC
SPECIAL VALUATION 835 n POST STREET spokane-continental bakery building Commercial.
Progression of Text Levels Expected in Grades 1 - 5
Group 1 Group 1 Group 1 Group 1 word word word word word word word word word word word word word word word word word word word word word word word.
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
GROUND FLOOR LAYOUT TYPICAL FLOOR LAYOUT UNIT LAYOUT Regular Suite sqm.

4 Years Milestone plan – (Company Name)
Kinder Math Bee Addition Practice.
Landmark Medical Center
Phase III Capital Program Remaining Projects
N 2013 Sales Map AVAILABLE LOTS Lot Classification Price Description
1st language words & bits 2nd language words & bits
Statistical overview of approved INTERREG IIIC operations - All zones - July 2005.
A Fractured Fairy Tale by:
How to find the nth rule for a linear sequence
North Augusta High School – Phase 2A and 2B
Toilets In ČRG.
Before and After Practice
October 2014 Star Data Prior to the C.A.F.E. Reading Initiative these were the results attained.
Square of a Trinomial By: Mr.Jay Mar Bolajo.
Shuttle Sort Example 1st pass Comparisons: 1
Presentation Title Your information.
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
The New Leavelle McCampbell Middle School
MONTHS OF THE YEAR Les docs d’Estelle Les docs d’Estelle
Presentation transcript:

Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund 101DBP 1st Floor Area: sq.m. Floor Area: 1, sq.m. (1 st & 2 nd floors only) Cost per sq.m.: Php18, nd Floor Area: sq.m. Total Building Cost: Php38,802, Phase 1: 26,102, Phase 2: 12,700, rd Floor Area: sq.m.

PERSPECTIVE VIEW

SITE DEVELOPMENT PLAN

Ground Floor Plan ( sq.m.)

Second Floor Plan ( sq.m.)

Third Floor Plan ( sq.m.)