Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

Slides:



Advertisements
Similar presentations
PAPER HOUSES Create a 3D House or Cabin.
Advertisements

The Story of Gorstycroft Its September 2004, and we need to buy a new house! Lets have a look at a few brochures…
By: Stephanie Marquette Kishwaukee College To begin designing my own house, I started researching some floor plans online. After looking at some.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
© Domus-M Introduction to Cad4B software 24/11/ i nnovation breakthroughs DOMUS-M Introduction to Cad4B software.
Smoke Alarm Placement Example #1 Single story house Laundry Garage Living Dining Kitchen Bedroom Bathroom.
© 1999 National Burglar & Fire Alarm Association 15-1 Chapter 15 Performing a Site Survey –Meeting the Consumers Needs. –Designing the system. Alarms:
Custom Estate in Thousand Oaks Concept Vision Construction Documents.
Before and After Photos. Dining Room Before Dining Room After Dining Room in Progress.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Visitability Standards Dan McNabb, Deputy Building Official Planning and Development Review Department.
Before and After Photos. Dining Room Before Dining Room After Dining Room in Progress.
Create Harmony and Balance in Your Home and Office
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Understanding House Plans
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Practice House 1. Make a rectangular foundation 2. Put an interior wall in the middle. 3. Add an exterior door, interior door and at least one window on.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Planning and Sketching a Floor Plan. Bubble Diagrams Quick Sketches.
Many thanks to Henry and Kristen. We are glad to have you as friends and happy to be your contractors.
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
Building Plans.
Floor Plans. Changing Housing Needs  Social trends shape needs  Economic conditions, lifestyle, physical needs and technology affect changes  Large.
By Ahmed Munshey.  Front Page  Other Information  Contents  Objective  House Design  Basic Human Needs  Lowering Ecological Footprints  Materials.
The following slides are photos of the current construction progress on the Marvin & Joyce Whitfield Life Campus.
1 July 13, 2011 Some morning photos Tank Valve Box.
Styles of Houses UNT in partnership with TEA. Copyright ©. All rights reserved. Architectural Design.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
A sustainable house By Ashleigh Towler. Down stairs garage Living room Bedroom 1 Laundry Kitchen/ dining room Bath entry.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
BY: Momen Khalid Saif yaish Salima Abdula abdul wahid.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
City of n Tigard Respect and Care | Do the Right Thing | Get it Done Presented to Tigard City Council April 26, 2011 Small Capital Construction Projects.
COZYEON Residence Main facilities gallery. Corridor of each floor.
SIZE - Top SERVER ROOM Designed by – openbox |
PAST STATE  The high intensity of the solar radiation through the roof increases the warming-up in the hall over 30 °C = 86 °F  The high internal temperature.
IN THE HOUSE /WATCH?V=AAH5-SA-32Y /WATCH?V=AAH5-SA-32Y Notes 9/21/15.
Vocabulario. living room bedroom kitchen dining room.
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
POSITION SENSOR. PHOTO ELECTRIC SENSOR THROUGH BEAM METHOD. RETRO-REFLECTIVE METHOD.
Upper Class Homes in Ancient Rome
Activity Zones.
20065 Bartel St. WAS PRICED AT $274,500
WHY YURT?.
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Competency: Draw Floor Plans
Capital Improvements Presentation
Architectural Design Styles of Houses.
Sneed Property th Ave E, Puyallup Exterior of House
City of Santa Cruz Accessory Dwelling Unit Development Program
Logans Bridge Cottage.
My home.
1 Semester Project Design A Multi Story Office Building
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
My home, my castle. 1.What is your name? 2.Where are you from?
Using Sketchup for Home Contracting
1 / 13 hallway. 1 / 13 hallway 2 / 13 living room.
Visioconference n°6 CM1&2.
Visioconference n°6 CE2-CM1.
At ridge height for family room
Installation of New Officers
WES Renovation Update Photo Gallery
Instructions and Specifications
My house.
Architecture Week Two.
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
Presentation transcript:

Construction Photo’s of FANDIC July, 2010

The Front of FANDIC Building 1st floorThe two floors

The Garage View from outside looking inView from inside looking out

Physiotherapy Salon 3 rooms were made into one

Access to the Second Floor The brown door is the office Steps to the first floor

Second Floor Education Ssalon Putting on the roof

The Kitchen

The Dining Room

Additional Photos Electrical instalations The bricklayer is the father of Juan Nicolas of Fandic, Luis Ignacio Celis.

View from the second floor Columns

Support Beams They were installed to avoid putting 2 columns in the middle The cost was 1 Million pesos