FHWA Peer Exchange – January 27, 2009 A Green Infrastructure Approach.

Slides:



Advertisements
Similar presentations
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Advertisements

Forest Legacy Assessment of Need Identifying Future Forest Legacy Areas Governors Commission for Protecting the Chesapeake Bay through Sustainable Forestry.
Promoting Watershed-Based Stormwater Management for Linear Projects through the Green Highways Partnership Patrick Jeffers, U.S. Environmental Protection.
The Green Arc Vision “Bringing the Big Outdoors closer to everyone – by creating, linking and managing extensive and valued landscapes for people and.
| 1 The Municipal Farm Sustainable Reuse Plan Project funded through a Brownfields Area-Wide Planning Pilot Grant from the United States Environmental.
December 3, 2014| Nadine Navarro Manager, Smart Commute, Metrolinx NEW DIRECTIONS FOR SMART COMMUTE, METROLINX.
Mid-Atlantic Green Highways Initiative Building Bridges through Collaborative Partnerships.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level The Economy and Conservation Agendas:
Bay Bank The Chesapeake’s Ecosystem Service Marketplace.
DRAFT SUSTAINABLE COMMUNITIES CLIMATE ADAPTATION GUIDEBOOK Kate Marshall, SRA International, Inc. (703) ,
Capitol Hill Oceans Week Wetlands Restoration Panel June 8, 2005 JOHN H. DUNNIGAN Ecosystem Goal Lead Capitol Hill Oceans Week June 8, 2005.
Florida’s Future Transportation Corridors Florida’s Future Transportation Corridors Presented to: Florida Redevelopment Association Presented by: Bob Romig.
Green Infrastructure Planning for working landscapes, natural resources and other open spaces.
Jan 22-24, 2007 Transportation Research Board U.S. Army Corps of Engineers Wilmington District North Carolina’s Interagency Agreements to Streamline Project.
Office of Science & Technology Policy Executive Office of the President The National Climate Assessment Version 3.0 Kathy Jacobs Assistant Director for.
FOREST AND RANGELANDS ASSESSMENT STEERING COMMITTEE Meeting and Webinar November 7, 2013 Green Infrastructure, Open Spaces, Sustainable Recreation, and.
Okanagan Basin Conservation Programs (SOSCP and OCCP) 80+ organizations (government and non-government) working together to achieve shared conservation.
Community-based Education K-12 students serving as a resource for meeting community needs.
I n t e g r a t I n g C S S Practitioner Module 3 Module 3: CSS and Livability In Area Wide Planning.
Indian Valley Meadow Restoration acre meadow located atop the Sierra Crest in Alpine County, CA. Headwaters of the Mokelumne River. Source for agricultural,
Problem Definition Exercise. U.S. Fish & Wildlife Service General Summary Responses from ½ of those surveyed (n=14/31) Broad and narrow in scope Narrow.
Burl Carraway. Purpose of Redesign Shape and influence use of forest land on a scale and in a way that optimizes public benefits from trees and forests.
8th Mid-Atlantic Regional Planning Roundtable Arlington, VA March 30, 2012 PlanMaryland Maryland Department of Planning.
Funded by the Government of Alberta Ecosystem Services and Conservation Offsets April 24 th, 2012.
Region III Activities to Implement National Vision to Improve Water Quality Monitoring National Water Quality Monitoring Council August 20, 2003.
City of Brisbane Open Space & Ecology Committee April 27, 2006 Baylands EIR Scoping.
The Power of Water A Regional Perspective on Water Resource Challenges and Opportunities Lester S. Dixon Director of Programs, South Atlantic Division.
National Workshop on Large Landscape Conservation Thursday, October 23, 2014 Will Allen Director of Strategic Conservation Planning Framing An Agenda for.
Smart Growth Implementation Assistance Montgomery County, MD Fact Sheet More about Smart Growth at Preliminary Project.
WASTE WOOD UTILIZATION WORKSHOP Forest Sustainability Program for Baltimore County, MD June 28, 2006 Donald C. Outen, AICP Natural Resource Manager
Ohio Balanced Growth Program October 30, 2012 Sandra Kosek-Sills PhD Ohio Lake Erie Commission.
Planning and Environment Linkages: Overview and Examples TRB Workshop on Environmental Analysis January 13, 2008 Michael Culp and Rob Ritter FHWA Office.
Ohio Balanced Growth Program Program Overview Sandra Kosek-Sills PhD Ohio Lake Erie Commission.
Wetland Monitoring What Do We Need? Integration of Wetland Monitoring and Wetland Management Wetlands and Waterways Program Maryland Dept. of the Environment.
Statewide Strategies for Coordinating Regional Transportation and Land Use Planning Katie Benouar, Senior Transportation Planner Office of Regional and.
LANDSCAPE SCALE PLANNING: INNOVATIVE TOOLS USED BY MD SHA AND TX DOTLANDSCAPE SCALE PLANNING: INNOVATIVE TOOLS USED BY MD SHA AND TX DOT AASHTO TIG Project.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Presentation by Jon Laria, Chair to the Maryland Association of Counties Winter Conference January 6, 2011.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
Planning and Sustainability Paul Farmer American Planning Association M6: Protecting the Urban Environment and Historical and Cultural Heritage.
A Pivotal Moment for Leaders Across the Gulf Coast States and Connected Communities Throughout the Country.
CALIFORNIA'S STATE WILDLIFE ACTION PLAN 2015 UPDATE A Conservation Legacy for Californians Armand Gonzales, Project Lead.
Metropolitan Planning Organization for Blair County (Altoona MSA) Regional Long Range Transportation Plan Draft Agency Coordination Meeting (ACM)
Secondary & Cumulative Effects Analysis Training Program Module 2: How to Establish the SCEA Geographical Boundary.
Green Infrastructure Network Design & Optimization The Conservation Fund Will Allen, Director of Strategic Conservation
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
FHWA’s Current Activities Related to Climate Change Southeastern Natural Resource Leadership Group Regional Climate Change Meeting Charleston, SC May 27,
San Diego Regional Comprehensive Plan Presentation to Senate Transportation and Housing Committee February 8, 2005.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Renewable Energy in California: Implementing the Governors Renewable Energy Executive Order California Energy Commission Department of Fish and Game Fish.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Session Chair:David Ward, Loudoun Watershed Watch Panelists:Gem Bingol, Piedmont Environmental Council Joe Ivers, PhD, Virginia Waters and Wetlands, Inc.
SUSTAINING ENVIRONMENTAL CAPITAL (SEC) INITIATIVE Providing resources for applying ecosystem services in public land & water management.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Forest Legacy Assessment of Need Draft Proposed Forest Legacy Areas Governor’s Commission for Protecting the Chesapeake Bay through Sustainable Forestry.
1 Office of Travel & Tourism Industries, International Trade Administration, U.S. Department of Commerce Organization of American States XXI Inter-American.
An Introduction to the concepts and the connections URBAN FORESTRY & GREEN INFRASTRUCTURE Bill Hubbard Southern Regional Extension Forester.
National Association of Conservation Districts Annual Meeting, Orlando, FL February 2, 2010 The Next Generation of The Next Generation of Conservation.
COMPREHENSIVE PLAN UPDATE MEETING 3 – NATURAL & CULTURAL RESOURCE ELEMENTS 1/09/2014.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Introduction to the Regional Conservation Partnership Program (RCPP) June 10, 2016 Carol Rivera– Program Manager An Equal Opportunity Provider and Employer.
* Background Image Courtesy of Kansas State Alumni Association *
Draft Transportation Element September 6, 2017
Washington County Parks and Open Spaces
Landscape Approach to Resource Management
* Background Image Courtesy of Kansas State Alumni Association *
Presentation transcript:

FHWA Peer Exchange – January 27, 2009 A Green Infrastructure Approach

 Craig Shirk, AICP Gannett Fleming, Inc.  Kris Hoellen, Director of Conservation Leadership Network The Conservation Fund  Richard Starr, Division Chief Habitat Restoration Division US Fish and Wildlife Service, Chesapeake Bay Field Office.

A Green Infrastructure Approach  Transportation improvements to address current and projected traffic congestion around the Waldorf, MD area  Three major alternatives:  Upgrade of existing US 301  Eastern Bypass  Western Bypass.

A Green Infrastructure Approach  Upgrade alternatives:  Substantial business community displacements & impacts  Complex and lengthy construction process  Increases separation of community  Bypass alternatives:  Substantial natural resource impacts  Potential growth management implications  Potential business community impacts from traffic diversions  Potential community impacts from tolls.

A Green Infrastructure Approach Project History  Long recognized need for transportation improvements  Governor’s Task Force developed improvement concepts  project planning study placed on hold due to agency concerns with environmental impacts

A Green Infrastructure Approach  2005 restart of project with new procedural approach and policy changes to address important resource issues  Commitment to bridge major stream crossings  Interagency Work Group process  Environmental Stewardship Initiative Federal Highway Administration Maryland State Highway Administration

A Green Infrastructure Approach Environmental Stewardship  Maximize enhancement, protection and improvement of natural, community and cultural resources  Non-regulatory, voluntary  Stewardship actions provided “above and beyond” compensatory mitigation  Goal – Leave environment better than existed prior to project

A Green Infrastructure Approach Environmental Stewardship Initiative  Interagency Working Group (IAWG)  Federal, state and local representatives involved in all aspects of project development  Natural Resources Working Group (NRWG)  Independent from project development team to provide scientific validity for agency buy-in  The Conservation Fund, Maryland Department of Natural Resources, US Fish and Wildlife Service  Community Resources Working Group (CRWG)  Watershed Modeling Working Group (WMWG)

A Green Infrastructure Approach Environmental Stewardship Opportunities  Conservation of high quality lands  Watershed protection efforts  Wetland protection and restoration efforts  Reforestation protection and restoration activities  Stream protection and restoration activities  Stormwater management retrofits  Extension/development of pedestrian/bicycle paths  Protection/enhancement of locally important historic resource  Improved wayfinding infrastructure

Green Infrastructure – What Is It? “Strategically planned and managed networks of natural lands, working landscapes and other open spaces that conserve ecosystem values and functions and provide associated benefits to human populations” A Green Infrastructure Approach

Hubs – anchor the system Links – tie the system together Sites – smaller areas, may not be attached Green Infrastructure Networks Lands - public, private & non-profit Scales - statewide, regional & community Landscapes - urban, suburban, rural & wild A Green Infrastructure Approach

CORRIDOR Core Core areas contain fully functional natural ecosystems, and provide high-quality habitat for native plants and animals. Hub Hubs are slightly fragmented aggregations of core areas, plus contiguous natural cover Corridors link core areas together, and allow animal movement and seed and pollen transfer between them.

A Green Infrastructure Approach Green infrastructure analysis area Broader analysis area  Charles County  Entire Piscataway Creek watershed  Entire Mattawoman Creek watershed  Potomac tidal watershed between Piscataway Creek watershed and Charles County  Entire Gilbert Swamp watershed Project study area  Piscataway Creek watershed  Mattawoman watershed  Zekiah Swamp watershed  Port Tobacco watershed.

 USFWS  Dept of the Army  US EPA  US Forest Service  NPS  BLM  NMFS  FHWA A Green Infrastructure Approach

Eco-Logical: “An Ecosystem Approach to Developing Infrastructure Projects”  Goal Driven  Collaboratively developed vision  Integrates ecological, economic and social factors  Geographic framework defined by ecological boundaries  Transportation Benefits: ecosystem based mitigation = predictability, efficiency, cost-effectiveness A Green Infrastructure Approach

Transportation Planning and Green Infrastructure  GI Plans can inform Transportation Plans, and vice versa  GI plans can help transportation planning organizations (State DOTs and MPOs) meet 6001 requirements  GI Plans can save Transportation staff time and lead to more streamlined reviews  For Conservation interests – the focus is on how the ‘grey’ can further promote ‘green’ goals A Green Infrastructure Approach

U.S. Fish and Wildlife Service Involvement  Stream Corridor Evaluation  Assess existing stream physical condition – rate streams as geomorphically stable, unstable, or recovering  Assess stream restoration potential – develop potential restoration solutions for priority stream restoration and conservation sites identified through GI process and provide potential benefits, feasibility, potential success, and restoration costs.  Develop protocols to conduct existing stream physical conditions and stream restoration potential assessments.  Assist in GI process - develop objectives and screening criteria, select potential conservation and restoration sites, and make implementation recommendations A Green Infrastructure Approach

U.S. Fish and Wildlife Service Perspective  Demonstrates Commitment to Environment  Early Planning and Coordination  Enhances protection and restoration of natural resources and lessens impacts  Effective Communication  Agency Support  Community Support  Encourage Continued GI Approach to Future Transportation Projects A Green Infrastructure Approach

Chesapeake Bay Program  Addresses each of the program goals: Living Resource Protection and Restoration; Vital Habitat Protection and Restoration; Water Quality Protection and Restoration; Sound Land Use; and Stewardship and Community  Identified and implemented ES actions can contribute to meeting state/regional Bay Program targets EPA Region 3 Watershed Resource Registry –Pilot Project  Use results of GI process and ES opportunities for identifying watershed-based mitigation strategies Environmental Stewardship Initiative - Connections

A Green Infrastructure Approach Maryland Department of Natural Resources  Educates/supports Program Open Space  Rural Legacy Program  Office of Sustainability Maryland State Highway Administration  Process can educate project development, mitigation commitments, maintenance activities  Initiative can be considered for other “mega-projects” in sensitive environmental settings Environmental Stewardship Initiative - Connections

A Green Infrastructure Approach Environmental Stewardship Initiative – Connections Charles County  Incorporate into county land use planning, implementation of capital projects (including local transportation improvements), and protection of important ecological areas (Mattawoman Creek watershed) Prince George’s County  Supplements existing GI program – further support for MWCOG regional transportation planning work Tri-County Council of Southern Maryland  Opportunity to incorporate 6001 requirements into regional transportation plans through agency coordination and consideration of priority environmental enhancement/mitigation opportunities

FHWA Peer Exchange – January 27, 2009 A Green Infrastructure Approach Thank You