Long-Term Electricity Report 1 Susan Gray September 27, 2010.

Slides:



Advertisements
Similar presentations
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Advertisements

CERAWEEK ® 2007 Technology Needs for a Carbon-Constrained World Jeff Sterba Chairman, President, CEO PNM Resources, Inc. February 15, 2007.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
Regional Emission-free Technology Implementation (RETI): Diversifying the U.S. Electricity Portfolio Marc Santos 2008 ASME WISE Intern University of Massachusetts.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
Pasadena Water & Power 2009 Integrated Resource Plan Public Meeting #3 December 17, 2008.
CHEAPER AND CLEANER: Using the Clean Air Act to Sharply Reduce Carbon Pollution from Existing Power Plants, Delivering Health, Environmental and Economic.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Integrated Planning Model (IPM) What It Is, Who Uses It, How It Works, What It Can Show You Presentation for For the Clean Air Act Advisory Committee Permits/New.
Sixth Northwest Conservation & Electric Power Plan Discussion of Proposed Generating Resource Action Items Jeff King Northwest Power and Conservation Council.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Wind Energy in Maryland. Onshore Utility Scale MEA continues to work to facilitate development of utility scale wind energy projects in Maryland. The.
PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection.
CLEAN ENERGY TO PROMOTE CLEAN AIR & IMPROVE ELECTRICITY PRICE STABILITY Alden Hathaway, ERT Debra Jacobson, GWU Law School April 6, 2006.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Utility Perspective on Climate Change Frank Prager January 22, 2008 Frank Prager January 22, 2008.
Colorado Renewable Requirements, Policies, and Projects James Tarpey, Esq. Commissioner Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver,
MarylandEnergyOutlook Advisory Committee Meeting December 1, 2009.
1 1 CURRENT ENERGY POLICY CHALLENGES. THE 2030 ENERGY AND CLIMATE FRAMEWORK DG Energy, European Commission.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
Political Factors Affecting the Renewables and Energy Efficiency Remarks of Ron Binz, Chairman Colorado Public Utilities Commission October 15, 2010 IPPAI.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Sixth Northwest Electric Power and Conservation Plan Generating Resource Assessments Jeff King Northwest Power and Conservation Council Portland, OR July.
Low carbon scenarios for the UK Energy White Paper Peter G Taylor Presented at “Energy, greenhouse gas emissions and climate change scenarios” June.
Climate Change Steering Committee’s Draft Climate Change Report September 5, 2008 Joan Rohlfs Chief, Air Quality Planning Metropolitan Washington Council.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Generation Portfolio Options Study Philip O’Donnell Manager, Generation Analysis 14 October 2009.
Wind & Transmission: The Clean Energy Superhighway Mark Lauby Manager, Reliability Assessments, NERC.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Future Power Generation in Georgia Georgia Climate Change Summit May 6, 2008 Danny Herrin, Manager Climate and Environmental Strategies Southern Company.
Department of the Environment Reducing Maryland’s Greenhouse Gas Emissions: A State’s Perspective Renee Fizer, Climate Change Division-MDE.
Cathy S. Woollums Sr. V.P. Environmental MidAmerican Energy Holdings Company NARUC Annual Convention November 12, 2007 U.S. Climate Policy: It Takes a.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
Restructuring and Energy Efficiency, Conservation & Demand Response Susan Gray August 26, 2008 PPRAC Meeting.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
SPSC Low Carbon Tool: Interim Status Report CREPC/SPSC meeting San Diego, CA October 5, 2012 Arne Olson.
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation.
Role of Renewable Energy and Implication of RPS in a Sustainable Electric Generation Portfolio NARUC Electricity Committee 2007 Annual Conference New York,
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
California Energy Commission Draft 2015 Integrated Energy Policy Report October 20, 2015 Presented by Heather Raitt Assistant Executive Director for Policy.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
Pennsylvania Electric Supply GHG Forecast 1 Victoria Clark Stockholm Environment Institute - US Center 5/29/09.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
Clean Power Plan Kyra Moore Director, Air Pollution Control Program Prepared for: Midwest Energy Policy Conference October 6, 2015.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
LNBA Subgroup: Avoided Transmission Value
Restructuring Roundtable March 24, 2017 Boston, MA
EPA’s Power Sector Projections Use of 2016 Data
Wind & Transmission: The Clean Energy Superhighway
New England Electricity Restructuring Roundtable September 18, 2009
Byron Woertz, Manager—System Adequacy Planning
Byron Woertz, Manager—System Adequacy Planning
Gordon van Welie, President & Chief Executive Officer
California’s Clean Energy Future
Presentation transcript:

Long-Term Electricity Report 1 Susan Gray September 27, 2010

Long-Term Electricity Report 2 Executive Order Identify approaches to meet Maryland’s long-term electricity needs and to achieve a clean, reliable, and affordable energy future Executive Order (EO) analysis will include: –Existing and planned electric generating capacity –Demand response –Electricity-based transportation –Existing and planned electric transmission –Conventional and renewable generating capacity additions (including small-scale distributed generation) –Fuel-switching –Energy conservation and efficiency –Smart grid –Energy storage technologies Not a planning document and will not recommend policy

Long-Term Electricity Report EO evaluation criteria: –Long-term cost and cost stability (including congestion costs) –Supply reliability –Transmission and distribution issues –Minimization of adverse environmental and land-use impacts –Consistency with state and federal environmental laws Solicit input and comments from a wide range of stakeholders Hold public meetings prior to completion of the report Final Report – December 1, 2011 Update the report every 5 years 3

Long-Term Electricity Report Preliminary Analysis Approach Use Ventyx Integrated model outputs –Generating capacity changes (retirements, additions, retrofits) –Capacity prices & zonal LMPs –REC and emissions allowance prices –Emissions of pollutants (CO2, SO2, NOx) –Generation and fuel sources by zone Use PJM energy and demand forecasts (adjust for demand response and EE/EC) 4

Long-Term Electricity Report Building on other past and ongoing efforts MEA’s Maryland Energy Outlook Maryland PSC’s SB400 Final Report to the General Assembly - and Supplement Long-term Electricity Report Eastern Interconnection States’ Planning Council Transmission Options Study MDE/MEA/PSC Maryland Multi-pollutant analysis Maryland PSC’s 10-Year Plan

Long-Term Electricity Report Preliminary Analysis Approach (cont.) 7 + potential base case scenarios to be run along with 16 + alternative scenarios 6 Base Case 1: PJM load forecast adjusted for demand response in years 4-20, EE/EC legislation, and smart meters; current power plant capacity adjusted for highly likely plants in the PJM queue; and, renewable projects sufficient to meet MD RPS Base Case 2: Base Case 1 plus Calvert Cliffs 3 National carbon legislation Base Case 3: Base Case 1 plus PATH MAPP Base Case 4: Base Case 1 plus PATH Base Case 5: Base Case 1 plus MAPP Base Case 6: Base Case 1 plus Calvert Cliffs 3 Base Case 7: Base Case 1 plus Calvert Cliffs 3 PATH & MAPP National carbon legislation

Long-Term Electricity Report Preliminary Analysis Approach (cont.) Possible alternative scenarios run on different base cases 7 Base Cases 1, 2, 3, 7 1. High Renewables Development (on-shore & off-shore wind, solar, biomass) Base Cases 1, 2, 3, 7 2. Medium Renewables Development Base Cases 1, 7 3. High Gas Prices Base Cases 1, 2, 3, 7 4. Aggressive Energy Efficiency and Conservation (EE/EC) Base Cases 1, 7 5. Climate Change (weather forecast that incorporates climate change)

Long-Term Electricity Report Step #1 – get the assumptions right and make the process transparent. Step #2 – make the model runs. 8 Use PPRAC as advisory committee during development of the report.

Long-Term Electricity Report Based on informal inputs received from several PPRAC members and on-going research: –EmPOWER Maryland goals - met in the base cases or reflect less- than-full achievement based on current approved programs? –Potential additional scenarios for high electric vehicle penetration? –Mix of renewable generating capacity for high renewables cases (how much off-shore & on-shore wind, solar, other)? –Renewable Portfolio Standard – re: solar carve out - met in the base cases or reflect less-than-full achievement?

Long-Term Electricity Report Schedule Assumptions completed & documented – December 2010 Receive PJM 2011 Forecast and begin runs – January 2011 Preliminary Draft Report – March 2011 –Introductory and background sections –Descriptions of models and development of model input parameters –Results of base case runs (w/o all alternative scenarios) Draft report – late April 2011 –Followed by a public meeting Final draft report – late Summer/Fall 2011 Followed by a public meeting Final Report – December 1,

Long-Term Electricity Report 11 Questions?