DR, 19. 5. 2009 1 SC strand and cable measurement instrumentation Mechanical testing of superconductors lab. 103 Low-temperature electrical testing of.

Slides:



Advertisements
Similar presentations
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
Advertisements

MIS 2000 Class 20 System Development Process Updated 2014.
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Laboratory 5: Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report / Presentation Closing.
EG1003: Introduction to Engineering and Design Introduction to LabVIEW.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Wind, wave and tidal energy DNV serving the energy industry.
Programmable logic control Data Processing Computer System Key Board Light Pen Mouse PLC a Process Control Computer System Motion Sensor Sound Sensor.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Computer Insides and Out Computer Basics 1.1. Basic Personal Computer System  A computer system consists of hardware and software components.  Hardware.
Chapter 2 Network Design Essentials Instructor: Nhan Nguyen Phuong.
MarsⅡ On-Line UPS Series
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
An Approach To Automate a Process of Detecting Unauthorised Accesses M. Chmielewski, A. Gowdiak, N. Meyer, T. Ostwald, M. Stroiński
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
AT Measurement Systems
Update and status for the Work Unit ‘Energy Extraction’ - equipping the three test benches for series testing of Super-FRS Dipoles D2, D3, D4 and Quadrupoles.
LHC Collimators Low Level Control Commissioning Status A Masi, LHC Collimators Low Level Control Commissioning Status LHC Collimators Low Level Control.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Utility Engineers, PC.  Generation  Transmission  Distribution.
CUE – Make Any Pump an E-Pump
Review of superconductors and magnet laboratories Summary of measurements and instrumentation issues
Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation, 12 April 2006 B163 - FRESCA.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
May07-02: Parking Meter Clint Hertz: Team Leader Austyn Trace: Communications Nick Hollander Christian Baldus.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
Introduction to LabVIEW
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
AGROFARM WEATHER MONITOR USING LabVIEW. INTRODUCTION Innovation in agriculture field Implementing instrumentation tech. in agricultural field The quantity.
Sextupole Single Coil Test Results Giovanni Volpini on behalf of the LASA Team Giovanni Volpini, CERN, 22 April 2015.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
EG1003: Introduction to Engineering and Design Introduction to LabVIEW.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Overview of Instrumentation and data acquisition system of cryogenic sub-systems of SST-1 D. Sonara, R. Panchal, R. Patel, G. Mehsuria,
Fan Assembly Driven by Magnetic Fields
Graphical Data Engineering
Lessons learnt from CERN experience
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
HL-LHC IT STRING and Series test of SC link
SCADA for Remote Industrial Plant
How SCADA Systems Work?.
MPE main activities planned for LS2
3 issues identified in review
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Programmable Logic Controllers (PLCs) An Overview.
TEST PLANS for HL LHC IT STRING
Review of hardware commissioning
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

DR, SC strand and cable measurement instrumentation Mechanical testing of superconductors lab. 103 Low-temperature electrical testing of superconductors lab. 163 Internal review of superconductors and magnet laboratories, CERN May 19, 20, 2009

DR, Instrumentation of lab. 103 (Mechanical testing) PC controlled(-able) instruments –Cable Measurement Engine (2x+3x): QBasic, DAS-8PGA card. –Cable Inspection System (2x+5x) Pattern recognition video system for Rutherford-type cables. –EMPA mandrel movement optical monitoring system. –Cable thermal contraction measurement bench. –Coulometer (2x). Developed for and very extensively used during the LHC cable production

DR, Test stations lab. 163 (Low-temperature electrical testing) As built for LHC 4x I C - strand NbTi 1x M(H)-strand 2x rrr/R C 1x Fresca x Com. with Cryo Present 2x I C - strand NbTi 1x I C - strand Nb 3 Sn 1x Heat transfer 1x M(H)-strand 1x rrr/R C 1x Fresca x Com. with Cryo Next: 1 of alternatives 2x I C - strand ITER 2x I C - strand Nb 3 Sn 1x M(H)-cable/I C -HTSc 1x M(H)/loss-strand 1x rrr/R C 1x Fresca 1x Heat transfer Com. with Cryo pits available in 163

DR, Testing electronics NbTi Ic-strand example

DR, Control computer 10x somewhat obsolete SunBlade or SunUltra –Problems very rare, not supported at CERN anymore – replacement. –Links: HD cross mount, server regime, afs calls. Rather unreliable coax Ethernet –Problems not rare, also for Cryo remote controls. –Under upgrade since months. –Ethernet as noisy as mains – could be isolated, WiFi? LabView 5.1 through 7.1 –TB updated but not yet a problem in real life. Protected mains installed for Controls –Their use somewhat random. Protected mains for test stations? Local UPS?

DR, Control bus IEEE-488 bus –6x RS mA loop terminated by an RS 232-to-IEEE-488 convertor serving typically 7 parallel working instruments in each station. Difficult management of READs and WRITEs for the control program in order to avoid blocking of the bus. We learned how to work in this condition but higher performance IEEE-488 bus would make operation more fluent. –Nb 3 Sn I C -strand, HT, and FRESCA on direct IEEE-488.

DR, Instruments conducting the test Mixture of: –Current supplies: 1 mA to 32 kA –V-meters: nV, mV, and mV ranges –Switches: nV to kA –DI/Os: 5 V, 24 V –Automates PLC: M(H), Cryo communications –Quench security Most of them fulfill their function and do not have TB replaced yet –From time to time some burn and need replacement, typically during summer – air temperature 35 C. –All stations use the same instruments: Sufficient internal redundancy in case of failure. CERN Electronics Pool offers some of them. All instruments still manufactured. Failure of any electrical instrument, with the exception of the multi-kA power supplies for the Nb 3 Sn I C -strand, M(H)-cable and FRESCA should not result in more than few-days stoppage. Sensors & Heaters –Available: Small stock of GRT, Cernox, CLTS, and Pt100 sensors, MINCO foil heaters. –Low stock of LHe level meters. –Stock TB revised.

DR, PXI upgrade option NbTi Ic-strand example Cost: About 6000÷ EUR/station & partial re-programming of the LabView code & partial re- cabling. Essential gain: Smoother communication, possible replacement of 2.5 instruments.

DR, Two current supplies to look at 5 pieces of 1 kA battery powered current supplies for I C - strand test (TE/MSC) –Need maintenance: battery replacement, revision of charger electronics and of cooler, adjustment/replacement of water interlock. Power supply for M(H) test –ISR original material. –Need for bipolarity, better control of current, reliability, smaller volume. –Would better be replaced by a new one.

DR, Calibration Multimeters –The 21 DMMs and 15 nV-meters Keihley, which are the core of the DAQ should be regularly calibrated. –Last systematic calibration done in Temperature sensors –LakeShore Germanium and Cernox sensors used. Last calibration campaign done in 2002 and 2004 – actual status TB verified. Similar concerns the 1.5 kA DCCTs

DR, EM noise & Co. TBD: De-coupling from mains and from Ethernet for sensitive measurements: –Double conversion UPS + separation transformer + WiFi(?). TBD: Installation of filters on cranes and verification of EM emission useful TBD: Protection of sensitive instruments against draughts in winter, and from overheat in summer –Temperature driven auto-calibrations TB added.

DR, Cabling and others Signal and control cabling –needs revision - connectors in particular (10 years in operation). Ventilation inside instrument racks - cleaning/revision Maintenance/upgrade of cooling water circuits –More de-mineralized water needed? –Utility water circuit TB purged, interlocks changed/adjusted. –Water-cooled cables TB revised. Mechanical tooling needs revision small repairs/re- placements/cleaning

DR, FRESCA particular SC current transformer for FRESCA –Transformer and its control electronics to be re-assembled and put into operation, some development of the electronics expected. Warm instrumentation cabling –Diverse provisional cabling TB replaced by a definitive one. Sample holders –Diverse sample holders TB inventoried and documented.

DR, Control programs (CP) The LabView based control software proved rather reliable and efficient during the extensive 5-year testing of superconductors for the LHC, and afterwards. CPs sontrol all (or almost all) test parameters and can run reasonably unattended over hours to complete series of tests: All use programmable sequencers – agendas. Built-in LHC-tailored quality control –I C -strand verifies instrument configuration. –Either have on-line automatic analysis of the test result, or they do not need it. –Many use reference sample as aid for on-line validation. –They all rely on final off-line acceptance of data by educated follower. Interactions of the CP –Interaction with Cryogenics –Interaction with Database –Calls to afs –Mail, phone alerts

DR, Upgrade of the CPs desirable Diverse upgrades desirable for CPs: –LHC-type control features TB revised/removed/extended: Sample ID control, assumptions about sample parameters, assumptions about test procedure. –Bi-directional-relation with the LHC database TB updated. –Change of all READs and WRITEs and bus sequencing in case of RS232 loop removal. –Periodic auto-calibration should be introduced in CPs. –New requirements on test algorithm for all tests: I C -strand, M(H), rrr, R C. –Algorithm extended for non-standard tests: Rc used for rrr of BB, rrr used for r(T) of SnAg.

DR, Sources of Control programs TE/MPE, TE/MSC (LHC/MMS): I C - strand NbTi I C - strand Nb 3 Sn Daq & data evaluation in M(H) rrr R C test R C follow-up Data evaluation for Fresca Heat transfer Communication with Cryogenics Data storage, retrieval, and post- processing CME modifications Cable thermal contraction EN/ICE Data acquisition in M(H) Data acquisition for Fresca Outside CERN: Cable Measurement Engine Cable Inspection System Mandrel Monitoring EMPA

DR, Database from the user’s point of view LHC production period –Highly efficient and specialized Database at the center of the LHC-centered activity of the section: Data storage, contract follow-up, test sample flow, test reference data, and test data approval and tracability. –Limited diversity of tests and samples × very high number of tests. Database inter-linked with testing programs. Concise paper logging - all information available from the DB. Current status and future –Unlike the LHC production: Diversified samples, Nb 3 Sn dominant. We urgently need ‘new’ database –The Database TB re-established in all its roles according to changed activities of the Section. –Actual state of the Database and its links to other SW TB inventoried. –Data approval procedures, automatic data tracability and test logging TB re-established/enhanced. –To offer fast read and load from daq & post-processing SW. –Well and simply organized flat files in right place are valuable complement ideal for creativity and raw data manipulation. –The database is to be accessed primarily from inside CERN and by interfaces written in different languages. External-to-CERN access must not impose restrictions on the in-house function of the database. –The users are TRAINED EXPERTS, who do their best to do good job – DB kind to users.