OSTM/Jason2 - OSTST Hobart - March 12, 2007 1 OSTM/Jason2 Mission status J. Perbos/CNES, P. Vaze/NASA, W. Bannoura/NOAA, F. Parisot/Eumetsat OSTST meeting.

Slides:



Advertisements
Similar presentations
Surface Water and Ocean Topography (SWOT) Satellite Mission
Advertisements

CRYOSAT WORKSHOP ESRIN – 8 to 10 March 2005 Cryosat Data Processing in Near Real Time for Oceanographic Applications J. BENVENISTE - ESA/ESRIN, Italy OZ.
Draft Recommendations subtitle here. Recommendation 1 The study groups from this workshop continue to collaborate with the goal of reporting progress.
ESTO Advanced Component Technology 11/17/03 Laser Sounder for Remotely Measuring Atmospheric CO 2 Concentrations GSFC CO 2 Science and Sounder.
Characterization of ATMS Bias Using GPSRO Observations Lin Lin 1,2, Fuzhong Weng 2 and Xiaolei Zou 3 1 Earth Resources Technology, Inc.
POD/Geoid splinter March 14, 2007 J.P. Berthias Ocean Topography Science Team Meeting - Hobart, Australia – March 2007.
AltiKa/SARAL project status – OSTST - HobartMarch 12-15, 2007 AltiKa/SARAL project status Jocelyne NOUBEL, CNES Pierre SENGENES, CNES.
Earth System Science Teachers of the Deaf Workshop, August 2004 S.O.A.R. High Earth Observing Satellites.
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
MR P.Durkee 5/20/2015 MR3522Winter 1999 MR Remote Sensing of the Atmosphere and Ocean - Winter 1999 Active Microwave Radar.
Time Transfert by Laser Link T2L2 On Jason 2 OCA –UMR Gemini Grasse – FRANCE E. Samain – Principal.
Monitoring Jason-1 and TOPEX/POSEIDON from a California Offshore Platform: Latest Results from the Harvest Experiment Bruce Haines and Shailen Desai Jet.
VENUS (Vegetation and Environment New µ-Spacecraft) A demonstration space mission dedicated to land surface environment (Vegetation and Environment New.
Active microwave systems (1) Satellite Altimetry
Remote Sensing of Mesoscale Vortices in Hurricane Eyewalls Presented by: Chris Castellano Brian Cerruti Stephen Garbarino.
Remote Sensing: John Wilkin Active microwave systems (1) Satellite Altimetry IMCS Building Room 214C ext
MWR Algorithms (Wentz): Provide and validate wind, rain and sea ice [TBD] retrieval algorithms for MWR data Between now and launch (April 2011) 1. In-orbit.
Suomi National Polar-orbiting Partnership (SNPP) Data Access NOAA Satellite Conference April 8-12, 2013 Kevin Berberich NESDIS/OSD NDE Project Photographs.
DORIS - DAYS Toulouse May 2-3, 2000 DORIS Doppler Orbitography and Radiopositioning Integrated by Satellite  Basic system concept  Main missions  Schedules.
SVY 207: Lecture 4 GPS Description and Signal Structure
HY-2A Satellite Altimetric data Evaluation in the Arctic Ocean Yongcun Cheng Ole Baltazar Andersen.
ODINAFRICA/GLOSS Sea Level Training Course
ET- 3rd Indo-French Workshop on Megha-Tropiques, October ALTIKA / OCEANSAT3 ISRO / CNES mission Prepared by E. Thouvenot (CNES)
CNES program status CNES program status E. Thouvenot, CNES March 2007.
EECS 823 MACHARIA.  Four-frequency, linearly-polarized, passive microwave radiometric system which measures atmospheric, ocean and terrain microwave.
OSTST, Hobart, March Future altimeter systems : is mesoscale observability guaranteed for operational oceanography? Future altimeter systems.
Coastal Altimetry Workshop - February 5-7, 2008 CNES initiative for altimeter processing in coastal zone : PISTACH Juliette Lambin – Alix Lombard Nicolas.
OC3522Summer 2001 OC Remote Sensing of the Atmosphere and Ocean - Summer 2001 Active Microwave Radar.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Center for Satellite Applications.
Space Geodesy (1/3) Geodesy provides a foundation for all Earth observations Space geodesy is the use of precise measurements between space objects (e.g.,
North America - Europe Data Exchange Group May 2004 Current Status of the Eumetsat Operational and Future Satellite Systems Ken Holmlund Meteorological.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
IRI Workshop 2005 TEC Measurements with Dual-Frequency Space Techniques and Comparisons with IRI T. Hobiger, H. Schuh Advanced Geodesy, Institute of Geodesy.
Hommes Logiciels Matériels S A L P SALP, the CNES ground segment for altimetric missions With the successful launch of EnviSat and Jason-1 missions, the.
SWOT Jet Propulsion Laboratory California Institute of Technology SWOT Ground System IGARSS – August 2011 Helene Vadon (CNES, Toulouse) Phil Callahan (Jet.
Laser-Astrodynamics, Space Tests of Relativity, and Gravitational Wave Astronomy 3 rd International ASTROD Symposium – Beijing, China – July 2006 TIME.
Automated Weather Observations from Ships and Buoys: A Future Resource for Climatologists Shawn R. Smith Center for Ocean-Atmospheric Prediction Studies.
OSTST Hobart 2007 – Performance assessment Jason-1 data M.Ablain, S.Philipps, J.Dorandeu, - CLS N.Picot - CNES Jason-1 GDR data Performance assessment.
RECENT ENHANCEMENTS TO THE CDDIS IGS Network Systems Workshop November 2-5, 1998 Annapolis, MD Carey E. Noll Manager, CDDIS NASA GSFC Greenbelt, MD.
Slide: 1 Status of EUMETSAT services, GODAE IGST meeting, 7-9 August 2007 GODAE IGST meeting, 7-9 August 2007 Status of EUMETSAT services in respect to.
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
OSTST - March Hobart 1 Impacts of atmospheric attenuations on AltiKa expected performances J.D. Desjonquères (1), N. Steunou (1) A. Quesney (2)
DORIS Days May 2-3, 2000 DORIS role in the next years P. Escudier CNES.
Recent Results from the Corsica Calibration Site P. Bonnefond (1), P. Exertier (1), O. Laurain (1), Y. Ménard (2), F. Boldo (3), E. Jeansou (4), G. Jan.
GRAS SAF User Workshop June GRAS Level 1 Processing and Products Juha-Pekka Luntama and Julian Wilson EUMETSAT Am Kavalleriesand 31, D
Key RO Advances Observation –Lower tropospheric penetration (open loop / demodulation) –Larger number of profiles (rising & setting) –Detailed precision.
March 8, 2005 Calibration and Operation of the Stepped Frequency Microwave Radiometer during the 2005 Hurricane Season Ivan PopStefanija
C H A M P International Laser Ranging Service - General Assembly, October 2005 Eastbourne, UK L. Grunwaldt, R. Schmidt, D. König, R. König, F.-H. Massmann.
Overview ABSTRACT As part of its Polar Satellite Program, NOAA operates the Jason-2 altimetry satellite and shares production of near real-time (NRT) products.
From you host … Dr. H. Introduction Communications design requires us to think about the following issues: Communications design requires us to think.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
CNSA,, Date Nov Coordination Group for Meteorological Satellites - CGMS The Status of current and future CNSA Earth Observing System Presented.
CNES program status CNES program status Prepared by E. Thouvenot, CNES August 2007.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
JASON2 Status in NOAA Gary Petti Office of Satellite Data Processing and Distribution.
JASON-1 MISSION STATUS S. Coutin-Faye CNES, Altimetry and Precise Positioning Office.
SCM x330 Ocean Discovery through Technology Area F GE.
The ESA call for the 9 th Earth Explorer mission (EE9)
Younis H. Karim, AbidYahya School of Computer University Malaysia Perlis 1.
C. Shum, C. Zhao, Y. Yi, and P. Luk The Ohio State University GFO Calibration/Validation Meeting NOAA Laboratory for Satellite Altimetry Silver Spring,
Altimeter and scatterometer seminar SMHI, March 2012 Future of satellite altimeters Sentinel-3 and SWOT Julia Figa Saldaña With contributions from Sentinel-3.
Altimeter and scatterometer seminar SMHI, March 2012 Altimetry data products Julia Figa Saldaña.
RENISH THOMAS (GPM) Global-Precipitation- Mapper
Current Satellites, Products, and Activities
DIODE On-Board Orbit Determination function, providing :
Recent Activities of Ocean Surface Topography Virtual Constellation (OST-VC) Remko Scharroo (EUMETSAT)
NASA Satellite Laser Ranging Moblas 4 Monument Peak, CA LRO and HPWREN Scott Wetzel NASA Satellite Laser Ranging Program Near Earth Networks Programs.
Recent Activities of Ocean Surface Topography Virtual Constellation (OST-VC) Remko Scharroo (EUMETSAT)
Presentation transcript:

OSTM/Jason2 - OSTST Hobart - March 12, OSTM/Jason2 Mission status J. Perbos/CNES, P. Vaze/NASA, W. Bannoura/NOAA, F. Parisot/Eumetsat OSTST meeting - Hobart Presented by G. Zaouche - CNES

OSTM/Jason2 - OSTST Hobart - March 12, Summary Mission features and Responsibility sharing Science and Ops requirements, –OSTM/Jason-2 Products –System improvements Mission status –Station acquisition and keeping strategy –Satellite –Launcher –Ground System

OSTM/Jason2 - OSTST Hobart - March 12, Instruments Core Mission: Poseidon-3 Altimeter DORIS (Precise Orbit Determination System) Advanced Microwave Radiometer (AMR) GPS Payload (GPSP) Laser Retro-reflector Array (LRA) Passengers: T2L2 JRE (Carmen2 + LPT) Core Mission: Poseidon-3 Altimeter DORIS (Precise Orbit Determination System) Advanced Microwave Radiometer (AMR) GPS Payload (GPSP) Laser Retro-reflector Array (LRA) Passengers: T2L2 JRE (Carmen2 + LPT) Science Measurements Global sea surface height to an accuracy of < 4 cm every 10 days, for determining ocean circulation, climate change and sea level rise Mission Objectives Provide continuity of high precision ocean topography measurements beyond TOPEX/Poseidon and Jason-1 Provide a bridge to an operational mission to enable the continuation of multi-decadal ocean topography measurements Mission Overview Launch Date: mid June 2008 Launch Vehicle: Delta II 7320 Proteus Spacecraft Bus provided by CNES Mission life of 3 years (goal of 5 years) 1335 km Orbit, 66º Inclination Launch Date: mid June 2008 Launch Vehicle: Delta II 7320 Proteus Spacecraft Bus provided by CNES Mission life of 3 years (goal of 5 years) 1335 km Orbit, 66º Inclination Mission summary

OSTM/Jason2 - OSTST Hobart - March 12, NASA/JPL NOAA CNES EUMETSAT EUMETSAT – Usingen, Germany NOAA - Wallops/ Fairbanks - USA Jason 2 Dedicated Delta II Launch Vehicle NASA Instrument Ops Operational product processing and Science Data archive & Distribution Operational product processing & Distribution Science data processing, archive & Distribution NASA Elements NOAA Elements EUMETSAT Elements CNES Elements S/C Operations (Suitland, MD) S/C Operations (Toulouse, France) Passengers Ops and mission centers CNES- JAXA AMR Reflector AMR Electronics GPSP Antenna LRA Poseidon 3 Altimeter DORIS System elements

OSTM/Jason2 - OSTST Hobart - March 12, Mission Partnership CNES responsibilities: –Project Management –Satellite, Proteus bus –Payload Nadir Altimeter POS3 DORIS T2L2 - CARMEN2 - LPT –Ground System & Operations Satellite Control Command Center (CCC) OFL product processing and distribution All archiving Ground network Satellite Operations before handover Navigation, Guidance, Expertise for all mission –System integration & test –Mission Operation support for CNES instruments –System Coordination for all mission phases –User interface CNES responsibilities: –Project Management –Satellite, Proteus bus –Payload Nadir Altimeter POS3 DORIS T2L2 - CARMEN2 - LPT –Ground System & Operations Satellite Control Command Center (CCC) OFL product processing and distribution All archiving Ground network Satellite Operations before handover Navigation, Guidance, Expertise for all mission –System integration & test –Mission Operation support for CNES instruments –System Coordination for all mission phases –User interface NASA responsibilities : –Project Management –Launch vehicle –Payload Advanced Microwave Radiometer (AMR) GPS Receiver (GPSP) Laser Retro-reflector Array (LRA) –JPL Payload integration and test –Mission Operation support for JPL instruments NASA responsibilities : –Project Management –Launch vehicle –Payload Advanced Microwave Radiometer (AMR) GPS Receiver (GPSP) Laser Retro-reflector Array (LRA) –JPL Payload integration and test –Mission Operation support for JPL instruments NOAA responsibilities: –Project Management –Ground System & Operations Satellite Operations Control Center (SOCC) CDA Stations (2) NRT product processing All product distribution All archiving Ground network Satellite operations after handover –User interface NOAA responsibilities: –Project Management –Ground System & Operations Satellite Operations Control Center (SOCC) CDA Stations (2) NRT product processing All product distribution All archiving Ground network Satellite operations after handover –User interface EUMETSAT responsibilities: –Project Management –Ground System & Operations Earth Terminal (1) NRT product processing, archiving and distribution Ground network –User interface EUMETSAT responsibilities: –Project Management –Ground System & Operations Earth Terminal (1) NRT product processing, archiving and distribution Ground network –User interface

OSTM/Jason2 - OSTST Hobart - March 12, Summary Mission features and Responsibility sharing Science and Ops requirements, –OSTM/Jason-2 Products –System improvements Mission status –Station acquisition and keeping strategy –Satellite –Launcher –Ground System

OSTM/Jason2 - OSTST Hobart - March 12, Jason-2 shall pursue the scientific objectives of the T/P and Jason-1 missions and support the running operational services Jason-2 shall meet the better than 3.5 cm rms accuracy, at 1 Hz, on the fully validated sea surface height measurements and shall provide intermediate products with the required delay and accuracy In addition to wave height and wind speed, NRT products need to include SSH information, with the required accuracy, for monitoring and forecast ocean fast events Expectation of improving performances through off-line ground-processing updates Expectation of collecting a maximum of valid data near the coasts, over inland waters and sea-ice, in order to support emerging research in coastal dynamics, hydrology, sea-ice interactions… Summary of science and Ops requirements

OSTM/Jason2 - OSTST Hobart - March 12, Products All O/I/GDR products will have the same format and very close scientific content. –OGDR = IGDR but the following : Orbit is computed using Doris Navigator files on OGDR Meteorological fields are predicted Pole Tide, Altimeter and radiometer calibration values (historical files) Dynamic Atmospheric correction (derived from Mog2D) is not available GIM ionospheric correction (derived from JPL maps) is not available Platform derived off-nadir angle is not available –IGDR = GDR but the following : Orbit is computed using MOE ephemeris Pole Tide, Altimeter and radiometer calibration values (historical files) Dynamic Atmospheric correction (derived from Mog2D) is less accurate Taken into account Jason-1 heritage, products will be split into several files : –One file close to current Jason-1 NRT-SSHA, limited to 1Hz sampling. –One file close to current Jason-1 I/GDR, containing 1hz and 20hz values. –One file close to current Jason-1 SGDR, containing 1hz, 20hz and waveforms values. This file will not be generated in NRT. User Handbooks, reading tools, products samples will be defined and delivered to OSTST group in a few months

OSTM/Jason2 - OSTST Hobart - March 12, OGDR products (Near Real Time) Description : –NRT geophysical product, data latency of 3 hours. –DORIS/DIODE onboard orbit : 10 cm rms for the radial component –Ground retracking is performed and all environmental and geophysical corrections computed. –Non fully validated product which contains data for both bands (Ku and C). –Two files : SSHA_OGDR : close to current Jason-1 NRT-SSHA, limited to 1Hz sampling. OGDR : close to current Jason-1 I/GDR, containing 1hz and 20hz values. Keys inputs : –Satellite telemetry –Auxiliary data Production requirement : –For the OGDR, 75% of the data taken shall be made available to the users within 3 hours from acquisition and 95% of the data within 5 hours. –No dynamical auxiliary data are mandatory input for OGDR processing. In case of lack of dynamical auxiliary data, the corresponding OGDR field will be computed with the most recent data available (none field being set to default).

OSTM/Jason2 - OSTST Hobart - March 12, NRT Products Quality Assessment System Quality Assessment System Developed by JPL under NOAA Contract has been installed & tested at NOAA Presently running on Jason-1 IGDRs, until Jason-2 OGDR is fully defined QA Package has been made available to EUMETSAT via JPL licensing Time Series (SSH)Asc/Des Maps (Iono)Histograms (Iono) Editing Time Series & Map (Wind)

OSTM/Jason2 - OSTST Hobart - March 12, OSTM Product Suite Product:OGDRIGDRGDR Latency:3-5 Hours< 1.5 Days~ 60 Days 1-Hz*OGDR-BUFR 1-HzOGDR-SSHAIGDR-SSHAGDR-SSHA 20-HzOGDRIGDRGDR WaveformsS-IGDRS-GDR * Compressed BUFR format; all other products in native netCDF format

OSTM/Jason2 - OSTST Hobart - March 12, OSS Nominal products Major characteristics of the product OGDR (NRT) IGDR (OFL) GDR (OFL) Content Not fully validated geophysical level 2 product fully validated geophysical level 2 product Alt. ground retracking Applied Orbit information source Better than 10 cm DORIS Navigator 2.5 cm preliminary orbit 1.5 cm Precise orbit Structure segmentpass Packaging segmentdaycycle Ground Processing mode systematic Data latency /availability 3 hours / 75% 5 hours / 95% <1.5 calendar days / 95% 60 days / 95% Format / Ground Processing centers Native and BUFR / NOAA and EUMETSAT Native / CNES Ground Archiving centers NOAA and CNES and EUMETSAT NOAA and CNES Dissemination centers NOAA and EUMETSATNOAA and CNES Dissemination mode Systematic Electronic & Satellite Systematic Electronic Systematic Electronic - Media

OSTM/Jason2 - OSTST Hobart - March 12, Some system improvements “Collecting a maximum of valid data near the coasts, over inland waters” Achieved through implementing new altimeter functional modes:  “Median Tracker algorithm ” in addition to the current Poseidon 2 “Split Gate Tracker algorithm” (adapted to ocean surfaces) should improve significantly echo tracking capability over non ocean surfaces  Use of satellite altitude data provided in real time by DORIS/Diode :  2 new experimental modes :  Signal acquisition using Diode altitude data + usual on-board tracker : should improve the delay to get echoes after a land-water transition (3 times better)  Range directly computed from : Diode altitude data + Digital Elevation Model data DEM data stored on-board, representative of oceans, lakes and rivers, and flat land areas should improve data collection near the coasts and over inland waters Final altimeter nominal mode will be selected after data evaluation during the assessment phase

OSTM/Jason2 - OSTST Hobart - March 12, Some system improvements New coastal & inland water product (demonstrative one) : –ITT has been issued by CNES to develop a new product suitable for applications in coastal and inland areas. –All current ground processing will be reviewed and analyzed. –We foresee : Dedicated retracking and radiometer algorithms Dedicated geophysical corrections (tides, ssb, …) Dedicated environmental corrections (wet tropo, iono, …) –Prototype shall be ready for Jason-2 launch, operated during CalVal phase and products made available to OSTST community for review. –Using OSTST feedbacks, this demonstrative product might become an official product during Jason-2 operation phase.

OSTM/Jason2 - OSTST Hobart - March 12, Summary Mission features and Responsibility sharing Science and Ops requirements, –OSTM/Jason-2 Products –System improvements Mission status –Station acquisition and keeping strategy –Satellite –Launcher –Ground System

OSTM/Jason2 - OSTST Hobart - March 12, Jason-2 Orbit target : 1 min Jason-2 is maintained in a control box of ± 1 km  1 km  Jason-1is maintained in a control box of ± 1 km Each satellite remains in its control box by controlling the equator crossing. The station keeping is made independently Improvement wrt Jason-1 : for Jason-2 station keeping, maneuvers will be made with only one thrust above earth on any orbit (no more on the last orbit of the 10-day cycle) Tandem flight with Jason-1 planned for both altimeters cross-calibration purposes Jason-2 final orbit characteristics : - semi axis = 1336 km; inclination = 66° (same ground tracks as Jason-1) - Jason-2 : 1 minute ahead Jason-1

OSTM/Jason2 - OSTST Hobart - March 12, Station acquisition strategy Injection orbit (same as Jason-1) –10 km below the nominal Jason-2 orbit : to avoid polluting the operational orbit by pieces of launcher and to create a drift to reach the right time phase between Jason-2 and Jason-1. Maximal duration for station acquisition : 1 month Number of rendezvous maneuvers and duration of the station acquisition depends on the launch date (day number in the Jason cycle). Test maneuver to check propulsion system (DV< 15 cm/s) 4 days Injection Trim maneuver if needed 30 days max. Second rendez-vous maneuver (DV ≤ 5 m/s) First rendez-vous maneuver (DV ≤ 5 m/s) 2 days One or two inclination maneuvers 2 days min.

OSTM/Jason2 - OSTST Hobart - March 12, to 10 months  Start of cycle 1  Start of OFL pdts delivery + data reprocessing Verification Phase 5 months  First Verification Workshop NRT Verif Phase  Near RT products delivery by NOAA and EUM Nominal satellite and instruments modes LEOP 3 days  In-Flight Assessment Meeting Orbit Acquisition 4 weeks  Orbit Acquisition key point Assessment Phase 2 months Resp : CNES with support of EUMETSAT, NASA, NOAA Resp : CNES with support of EUMETSAT, NASA, NOAA Resp : CNES, NASA with support of PIs Resp : CNES(generation and distribution), NOAA (distribution) Resp : EUMETSAT, NOAA (generation and distribution) NRT Operational Phase OFL Operational Phase Start of Satellite & Ground nominal operations  Sat Op Handover Review  Flight operations Hand over to NOAA Final Verification workshop  OFL Verif Phase Resp :CNES (Sat Operations) Resp : NOAA (Sat Operations) Resp : CNES for System coordination Operational Phase Sat Operational Phase 2 months CNES Mission Phases

OSTM/Jason2 - OSTST Hobart - March 12, Jason-2 satellite 8-instrument Payload –AMR (NASA/JPL) –GPSP (NASA/JPL) –LRA (NASA/JPL) –DORIS receiver (CNES) –POSEIDON 3 altimeter (CNES) –3 passengers : Carmen 2 (CNES), T2L2 (CNES), LPT (JAXA) 505kg/ 472W satellite

OSTM/Jason2 - OSTST Hobart - March 12, DORIS Provides accurate time-tagged Doppler measurements to meet Jason2 POD requirements –MOE/IGDR required accuracy : 2.5 cm on radial component –POE/GDR required accuracy : 1.5 cm (1cm goal) with Laser measurement Delivers on-board, in real time, an estimation of satellite position with an accuracy better than 10 cm RMS on the radial component Provides accurate TAI time-tagging of satellite PPS and payload measurements with an accuracy better than 7 microseconds Provides to both altimeter chains and to T2L2 equipment the 10 MHZ USO signal DGxx BDR corresponds to a new design of DORIS receivers –USO NG design (different from JASON1 USO design) but with a 5 MHz resonator (instead of 10 MHz) to improve short-term stability –Improvement of resonator selection and process method to reduce USO sensitivity to radiation in SAA area (DORIS/JASON1 lessons learned) Flight Model 4 delivered and assembled on the satellite Flight Model 3 will be delivered mid April and will replace FM4 DORIS 2 frequency antenna Doris DGxx BDR (including USO)

OSTM/Jason2 - OSTST Hobart - March 12, Altimeter (Poseidon3) Provides accurate range measurement between the satellite and the mean sea surface –measurement in Ku-band –C-band range data used to correct for ionosphere path delay Additional parameters : –Significant Wave Height (SWH) in Ku-band –Backscatter coefficient  0 related to the wind speed –Antenna mispointing Poseidon 3 design derived from both Poseidon 2 and SIRAL altimeters (CRYOSAT mission) 2 frequency antenna : copy of Jason-1 antenna Processing Units : built and testing completed Radiofrequency Units : built and testing completed Flight Software is validated Altimeter assembly and performance tests in progress Delivery for assembling on satellite : May 07 Poseidon3 two frequency antenna Poseidon3 FM on the payload module panel

OSTM/Jason2 - OSTST Hobart - March 12, The instrument is comprised of a 23.8 GHz water vapor sensing channel, an 18.7 GHz channel to estimate ocean surface contributions, and a 34.0 GHz channel to estimate cloud liquid content Measures single polarization, radiometric brightness temperatures in a nadir beam co-aligned with that of the CNES supplied Poseidon-3 altimeter, i.e. it provides “wet” tropospheric path delay correction for nadir altimeter range measurement. Critical to meeting OSTM science requirements. Same functional requirements as the JMR but different implementation which lead to a new generation design : less mass and power New antenna design with larger reflector (1m) and inherited JMR feed, significantly reduces calibration uncertainties and improves coastal resolution Instrument has completed testing and has been delivered to CNES/Alcatel (Feb ’07) and is integrated on the S/C Closure of one open point: Rework of Noise Source units and swap with existing flight HW is planned for April ‘07 Electronics Support Assembly Complete AMR Instrument Advanced Microwave Radiometer (AMR)

OSTM/Jason2 - OSTST Hobart - March 12, Choke-Ring Antenna ( 1 of 2) GPSP Electronics Unit (1 of 2) High performance GPS receiver designed to provide precise orbit determination as a validation to the primary DORIS system and to enhance the accuracy during nominal operations. HW is build to print of the Jason-1 GPS receiver As on Jason-1, the instrument is block-redundant with 2 identical single-string receivers and antennas Each redundant side of the GPSP subsystem consists of a dual- frequency L1/L2 patch antenna/choke-ring assembly, an electronics unit, and a coaxial RF cable Complete instrument was successfully delivered for S/C integration and fully integrated on S/C in Dec ‘07 Payload GPS receiver (primary ) Ant. #1 Ant. #2 coax GPSP Instrument Spacecraft chassis Skin connectors RS-422 DHU Internal Bus Power A Power B Telemetry Interface B Telemetry Interface A Processor Module A Processor Module B Payload GPS receiver (redundant) Global Positioning System Payload (GPSP)

OSTM/Jason2 - OSTST Hobart - March 12, Consists of several quartz corner cubes arrayed as a truncated cone with one in the center and the others distributed azimuthally around the cone. The LRA supports determination of the Poseidon-3 altimeter bias through direct comparison of altimeter measurements with laser measured "altitude" corrected to sea level from local tide gauges Totally passive reflector designed to reflect laser pulses back to their point of origin on earth. The assembly contains no electronics or software. The LRA allows the OSTM/Jason-2 spacecraft to be tracked with centimeter accuracy by approximately 40 satellite laser ranging stations The LRA is an exact copy of the Jason LRA and has been delivered to CNES/Alcatel for S/C integration (March ’07) NASA SLR Stations at GSFC Laser Retroreflector Assembly (LRA)

OSTM/Jason2 - OSTST Hobart - March 12, Passengers : T2L2 Main mission objectives : –Compare distant clocks with an accuracy of a few picoseconds –Contribute to better characterize the Doris USO noise Environment testing completed Delivered to CNES, performance tests in progress Delivery for assembling on satellite : mid April 07 ElectronicsOptical Unit

OSTM/Jason2 - OSTST Hobart - March 12, Passengers : Carmen2, LPT Carmen2 mission objectives : to study the influence of space radiation on advanced components ; to measure the deposit dose into the DORIS USO ( South Atlantic Anomaly) Environment testing completed Delivery for assembling on satellite : mid March 07 LPT mission objective : to measure the radiation environment at the Jason2 orbit Environment testing nearly completed Delivery for assembling on satellite : April 07 LPT Electronics Carmen2 LPT Sensors

OSTM/Jason2 - OSTST Hobart - March 12, Satellite Status Proteus Bus equipment fully qualified Proteus Platform has been integrated and delivered Platform integrated with Launch Vehicle Interface (LVA). Platform Safe to Mate (missionisation) completed.

OSTM/Jason2 - OSTST Hobart - March 12, Satellite Status All functional validation tests performed. Flight Software Validation completed Spacecraft Data Base available Payload Assembly and Integration Tests (AIT) has started Dec 06 Payload Instrument Module assembly completed

OSTM/Jason2 - OSTST Hobart - March 12, December 2006 : DORIS AIT Satellite Status

OSTM/Jason2 - OSTST Hobart - March 12, Satellite Status December 2006 : GPSP AIT

OSTM/Jason2 - OSTST Hobart - March 12, End January 2006 AMR AIT Satellite Status

OSTM/Jason2 - OSTST Hobart - March 12, February 2007 Altimeter antenna integration test Satellite Status

OSTM/Jason2 - OSTST Hobart - March 12, Boeing Delta II-7320 manifested as single payload launch Payload integration and launch from VAFB (Vandenberg Air Force Base), CA Implementation timetable based upon ATP (Authority To Proceed) at L-27 months (Mar 06) NASA Flight Planning Board has identified a launch date of 15 Jun 08 Single payload configuration will require a system that reduces vibration loads to the spacecraft Softride isolation system selected for implementation by Boeing Completed PDR in Feb ’07 with full delivery expected by end of Restarted Loads and Structures Working Group to ensure successful implementation Overall LV development is on schedule with no significant issues. Launch Vehicle

OSTM/Jason2 - OSTST Hobart - March 12, Jason2 Ground System : Earth stations HBK TM/TC SBAND Earth Terminal Hartebeesthoek, South Africa Resp : CNES - Phase : LEOP and Assessment, contingency in routine phase USG TM/TC Earth Station Usingen, Germany Resp : EUMETSAT - Phase : all FBK WPS Command and Data Acquisition Stations Fairbanks, Alaska, USA Wallops, Virginia, USA Resp : NOAA - Phases : all EUMETSAT Earth Station : built and accepted in 2006 integrated into Jason2 Ground System currently involved into System Tests NOAA stations : already existing adaptation to Jason2 : in progress to be integrated into Jason2 Ground System in summer 2007

OSTM/Jason2 - OSTST Hobart - March 12, FBK WPS USG HBK CNES J2CCC Jason-2 Command Control Center (J2CCC) Localisation : Toulouse, France Resp : CNES Phase : active control center for LEOP and assessment (-> handover), contingency in routine phase NOAA SOCC Satellite Operation Control Center (SOCC) Localisation : Suitland, USA Resp : NOAA Phase : active control center for routine phase (handover ->) EUMETSAT processing centre EUMETSAT processing center (EUMPC) Localisation : Darmstadt, Germany Resp : EUMETSAT Phase : all Role : routing non real-time exchanges between CNES and NOAA PRESTO Satellite simulator (PRESTO) Localisation : Toulouse, France Resp : CNES Phase : all Jason2 Ground System : Satellite command/control

OSTM/Jason2 - OSTST Hobart - March 12, Jason2 Ground System : CNES command/control center CNES Control Center : for LEOP & Assessment phases adaptation and integration to Jason2 Ground System: completed currently involved in the compatibility tests will participate to Operational System qualification from Summer 2007

OSTM/Jason2 - OSTST Hobart - March 12, Jason2 Ground System : NOAA command/control center NOAA Control Center : for satellite operational phase adaptation to Jason2 Ground System : in progress first compatibility tests : April 2007 to be integrated into Jason2 Ground System in summer 2007 will participate to Operational System qualification from Fall 2007

OSTM/Jason2 - OSTST Hobart - March 12, FBK WPS USG HBK CNES J2CCC NOAA SOCC EUMETSAT processing centre JPL instrument experts (Pasadena) CNES Mission Centre SSALTO (Toulouse) NOAA Mission Centre CNES Mission Centre : SSALTO (Segment Sol Multi-mission Altimétrie et Orbitographie) Localisation : Toulouse, France Resp : CNES EUMETSAT Processing Center (EUMPC) Localisation : Darmstadt (Germany) Resp : EUMETSAT NOAA Mission Center Localisation : Suitland (USA) Resp : NOAA JPL Payload command/control center Localisation : Pasadena, USA Resp : JPL Jason2 Ground System : Products Processing centers Users

OSTM/Jason2 - OSTST Hobart - March 12, EUMETSAT Near Real Time Product Center EUMETSAT Near Real Time Product Center : development in progress integration to Jason2 Ground System: summer 2007 will participate to Operational System qualification end 2007 for operational phases

OSTM/Jason2 - OSTST Hobart - March 12, NOAA Near Real Time Product Center NOAA Near Real Time Product Center : development in progress integration to Jason2 Ground System: summer 2007 will participate to Operational System qualification end 2007 for operational phases

OSTM/Jason2 - OSTST Hobart - March 12, CNES Off line Product Center CNES Off line Product Center (SSALTO) : adaptation to Jason2 ground system in progress new development in progress integration to Jason2 Ground System: summer 2007 will participate to Operational System qualification end 2007 for verification and operational phases

OSTM/Jason2 - OSTST Hobart - March 12, Users Products and Data access NOAA CLASS noaa.gov/nsaa/ products/welcome EUMETCAST Home/Main/ Access_to_Data/ Delivery_Mechanisms CNES AVISO oceanobs.com

OSTM/Jason2 - OSTST Hobart - March 12, Project Summary Successfully completed all mission reviews –Satellite Critical design Review October ’06 –System Interface Review December ’06 –Instruments level reviews Build and test of all instruments is nearly complete Current measured payload and satellite performance meets all requirements Several key risk items for System Safety and LV have been addressed with clear mitigation paths established. Payload instruments integration has started Dec ‘06 Satellite Assembly, Integration and Test: from June ‘07 to January 2008 Ground System qualification tests and End to End (Satellite-Ground) tests : from April ’07 to May ’08 Launch: mid June 2008 –2 months schedule margin for satellite and system development