24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.

Slides:



Advertisements
Similar presentations
HVAC523 Heat Sources.
Advertisements

1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
LARP Collaboration Meeting Racetrack Coil Fabrication
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Installation of the T600 at Fermilab CSN2, September 22,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Mechanical and cryogenic configurations
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Update on PANDA solenoid design
MQXC Nb-Ti 120mm 120T/m 2m models
Mike Anerella December 17, 2013
MICE Meeting at RAL, Oct-23, 2005
HFM Test Station Main Cryostat
Teleconference ACS – FREIA 18th April 2017
LARP Vertical Test Facility
Far Detector Activities Late 2017 – Early 2018
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Experimental equipment Edgar L. Black February 17, 2019
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
CRYOMODULE FINAL ASSEMBLY
as a prototype for Super c-tau factory
SC1R Cold Box PDR Assembly Sequence
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach January 24, 2013

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 2 Outline Design details Assembly sequence

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 3 Design Details

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 4 Overall System Configuration

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 5 Self contained heat exchanger - copper pipe in yoke hole - connected directly to Nash pump Vertical Dewar = 24KA vapor cooled leads, 1.9K, 1 atm vessel, 4.5K LHe “thermal shield”, insulating vacuum, instrumentation, etc.

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 6 Top of lambda plate to bottom of dewar top hat = 40 in. (min. LHe distance ~ 28 in.) 1.9K exhaust (to Nash) 300K 4K liquid - gas Inner / outer Insulating vacuum 4K heat shield (existing dewar) Vertical Dewar Details G-10 – SST Lambda plate Bolted – metal seal 1.9K-4.5K relief G-10 hanging support 300K 1.9K vacuum 4.5K vacuum 4.5K vacuum Bottom detail 4.5K-1.9K “J-T” pre-cool heat exchanger 1.9K heat exchanger pipe

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 7 1.9k Heat Exchanger Details 1.9K exhaust (Nash vacuum) 1.9K reservoir helium pre-cool heat exchanger (from 1.9K exhaust) Level Probe4.5k He Supply

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 8 Assembly Sequence

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 9 Cold Mass Ready For Up-Righting Top Hat/ Lambda Plug Prep Fixture Lifting Details

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 10 Lower Up-Righted Cold Mass into Wiring Stand Attaching Top Hat/ Lambda Plug Assembly Remove Lifting Ring Install In Wiring Stand

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 11 Lower Magnet To Final Position In Wiring Stand Solder main leads Connect Hypertronics, etc. Lower Cold Mass Assembly Onto Wiring Stand

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 12 Existing Vertical Dewar New Vacuum Jacketed 1.9K Vessel Install 1.9K Vessel Into Vertical Dewar On Temporary Support Rings Install 1.9K vessel Into Vertical Dewar (1 time only)

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 13 Bolt Lambda Plug to 1.9K Vessel Connect vacuum line Connect He fill line Install heat exchanger, outer warm bore Remove Temporary Support Ring And Lower cold mass, 1.9K Vessel Into Dewar Install inner warm bore Lower Magnet Into 1.9K Vessel Install cold mass into dewar

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 14 Extra slides

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 15

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 16

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 17

24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 18 Background Info Crane capacity: double hooks, 30T and 5T Hook heights: 303 IN., 30t; 324 IN. APPROX, 5T “dewar 3” = 6.1 m deep, sits 0.9 m above floor, is 710 mm inner diameter Plan assumes 4785 mm overall cold mass length