Cycle Eun Cho Studio V Summer 2005. program Retail: 7-11 Store on Corner 3,000 sf // 3,018 sf Single Story Retail 32,000 sf // 39,276 sf Residential Condominiums:

Slides:



Advertisements
Similar presentations
Housing Types & Terminology One Dwelling per lot homes: –Bungalow Housing – Common-wall Dwellings – Accessory Apartments Two Dwellings per Lot: – Duplex.
Advertisements

PROJECT EMERALD SKYLINE
River Terrace The romance and elegance of a Tuscan Village A planned residential community Approved Vesting Tentative Map LOM 533 By C oastal V ision.
Achieving Sustainable Design with Automated Parking
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Additional Charges Additional charges: Park/ Main Road PLC. 50/Sq.ft. Doctor Tower(N) PLCRs. 50/Sq.ft. I.F.M.S.Rs. 20/Sq.ft. Lease RentRs. 105/Sq.ft. Open.
Technology in Architecture Lecture 10 Mechanical Systems Lecture 10 Mechanical Systems.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
East 125 th Street Development Taskforce Summary of RFP Reponses April 5, 2007.
S E R R A M O N T E V I S T A DALY CITY, CAMARCH 16, Presentation to: City of Daly City Design Review Committee.
City of Scottsdale Senior Center at Granite Reef
Creating a section view using floor plans
OFFICE SPACE | RETAIL AREA | RESTAURANT | FOOD COURT | BANQUET HALL.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Central Business District Study Area 1500 acres along Peachtree Pkwy.
ASU Downtown Phoenix Campus City Council February 6, 2007.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Mill Creek Town Center A Proposed Mixed Use Development Mokena, Illinois.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
U Building Area: (sf) 2,500,000 SF Anticipated date of completion: Estimated Completion 2012 Location of Project: Miami, FL Type of Project: Mixed-use.
By team iPhone.  lesson objectives: In this lesson you will learn what an angle of elevation and an angle of depression is. You will also learn how solve.
Cherry Creek North and Country Club Historic RNOs and TDA Colorado Cherry Creek North BID Cumulative Traffic Study.
Word Problems for Right Triangle Trig. Angle of Elevation: The angle above the horizontal that an observer must look at to see an object that is higher.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
Scott Cooper | May 20, 2014 Built Smart and New Construction.
Placemaking Plan Virginia Commonwealth University Urban and Regional Planning Studio I Spring 2012 Chesterfield Towne Center.
Draft Zoning Code Residential Focus Neighborhood Meeting May 8, 2007.
Civil and Family Courts Complex September 8, 2015.
A NEW AMERICAN UNIVERSITY Comprehensive Development Plan Tempe City Council
Building Plans.
By: Garrett Smith & Ben Greer
Real Estate Project By: Stephanie Turco and Blair Griffin.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Presented by Kristen Hwang. 1. Client Profile Preview 2. Overview & Key features of the house 3. Floor Plan 4. Section Views(North/South) 5. Material.
NEC Historical Lighting Allowance  1959 Lighting allowance for Offices W / ft 2  1984 Lighting allowance for Offices reduced to 3.5 W / ft 2 
Atlas House Business Center BELGRADE SERBIA Each office is independently owned and operated.
ISOVER Multi-Comfort House Students Contest Edition 2015 Residential function in cold climate – Astana, Kazakhstan Kazakhstan, KAZGASA, 1st Prize, Ruslan.
Affordable Sustainable Housing Dennis Wilde. Gerding Edlen Development Provides vast range of development & post-development services to diverse clients.
Check Out a Magnificent Sea Side Property in Cayman islands.
Hunterspoint Mixed-Income Housing Design Project Urban Systems Studio December 9, 2008.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Review Hearing LU DZM AD – Grant.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
Session 1: Identifying Construction Drawings and Drawing Components.
Wave City Center - Residential and Commercial Property.
July 4, 2017 AURORA UNITED CHURCH + SOUTHBOUND DEVELOPMENT LTD Yonge Street, 55&57/57A Temperance Street, 12&16 Tyler Street General Committee Meeting.
Upon completion of this module, you will be able to:
RESIDENTIAL GARAGE ADDITION
253 South Los Robles Avenue Predevelopment Plan Review
CFT Gateway Center ( E. Foothill Blvd
Construction Documents
City Council September 18, 2017
FRESNO COUNTY WEST ANNEX JAIL
Penn Medicine Chester County Hospital
RESIDENTIAL DESIGN PROJECT
83 North Lake Avenue Predevelopment Plan Review
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Commercial Construction Projects
DOWNTOWN TAMPA HISTORIC LANDMARK
225 Maple Avenue South Plainfield High Traffic County Road
2-Level Boutique Office for Lease
PERFECT DATA CENTER SPACE FOR LEASE
M&E SYSTEM.
1 Semester Project Design A Multi Story Office Building
Call Today for More Details – Make an Appointment to See It!
Lehigh Valley Heritage Center
Outline Introduction Desecration of the project Soil Report
Technology in Architecture
Northwest Office Center – 4334 NW Expressway
Adani Brahma Miracle Mile
Presentation transcript:

Cycle Eun Cho Studio V Summer 2005

program Retail: 7-11 Store on Corner 3,000 sf // 3,018 sf Single Story Retail 32,000 sf // 39,276 sf Residential Condominiums: 110 units = 308,000 sf // 301,180 sf  average size 2,800 gross sf per 85% = 2,380 sf net per unit //  typical: 2738 = 2350 sf gross (-30sf) 40 units = 140,000 sf // 131,200 sf  average size 3,500 gross sf per 88% = 3,080 sf net per unit //  typical: 3280 = 3005 sf gross (-75sf) Office: 108,000 sf office space // 126,074 sf Parking: Retail: 118 spaces at grade, Condominiums: 330 parking spaces with 150 storage units (total of 480 parking spaces and storage units, Office: 360 car parking spaces (surface and structured parking) TOTAL : 808 // 814 parking spaces (+6) Zoning – originally MC-1 70’ 5 stories and CR 54’height and 4 stories  Rezoned – MU-3 270’ height 30 stories Cycle // Eun Cho

the beginning Cycle // Eun Cho

context / public art cy·cle – a permutation of a set of ordered elements in which each element takes the place of the next and the last becomes first Eviva Amore – Mark di Suvero  Displayed at the center of courtyard so pedestrians can walk under the sculpture as they cross the bridge over the water element Cycle // Eun Cho

current / in progress

section / elevation Cycle // Eun Cho

schematic parking Cycle // Eun Cho Ground level w/retail 216 spaces 1 level below spaces2 level below spaces

Total Program Space Office: 126,074 sf/2=63037 sf per floor Housing: 301,180 sf/10=30118 sf per floor schematic floor plans Office – 2 nd &3 rd floorHousing 11th-13th floorHousing – 4th-10th floor Cycle // Eun Cho

2800 sq ft unit Cycle // Eun Cho Average programmatic size: 2,800 gross sf per 85% = 2,380 sf net per unit * Average typical: gross 2350 sf(-30sf)

3500 sq ft unit Cycle // Eun Cho Average programmatic size 3,500 gross sf per 88% = 3,080 sf net per unit *Average typical: gross 3005 sf (-75sf)

hvac water cooled chillers and cooling towers  2 chillers for office/retail and 2 chillers for housing 4 chillers 1200 tons total  each 300 tons 2 chillers per large complex building Cooling towers placed on roof top Chillers in parking garage Metered for units 2’ furrdown in each floor to accommodate ductwork and necessary pipes – mechanical, electrical and plumbing Cycle // Eun Cho elevation garage cooling overall plan/main supply lines Ductwork follows main corridors

the end Cycle // Eun Cho