Ohio River Bridges Project

Slides:



Advertisements
Similar presentations
Public Private Partnership Investment and Construction Armando R. Araujo Cairo 2003.
Advertisements

Presentation to Montgomery County Rapid Transit System (RTS) Steering Committee July 30, 2013 Purple Line Private Public Partnership Initiative.
I-4 Ultimate with Lanes Project Central Florida 1 May 21, 2013.
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Selection Scoring Methodology Presented by August 23, 2007.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,
Presented by Department of Finance Purchasing Division Cecelia H. Stowe, CPPO, C.P.M., Purchasing Director Eileen M. Falcone, Senior Buyer.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU The Private Sector Perspective on PPP Projects/Concessions.
Public Private Partnerships P3s What the Public Sector Considers When Selecting the Right Private Partner Jose A. Galan - Division Director Miami-Dade.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
No 1 REVIEW OF ACADEMIC STRUCTURE PROPOSED GENERAL STAFF STRUCTURE 3 June 2008.
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Patrick DeCorla-Souza, P3 Program Manager, FHWA
New York State Department of Transportation
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Introduction to P3 Bootcamp
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Privatizing for the Public Good “Role of Professional Advisors to State DOTs” April 27, 2007 Thomas W. Bradshaw, Jr. Managing Director Co-Head of Transportation.
Acquisition Strategy Under the laws of the State of Colorado Commercial acquisition practices to be utilized.
The RFP: How to Manage the Process Bob Yecke Assistant Director, University Unions University of Michigan Ann Arbor.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
Chapter 5 : Initiating and Planning Systems Development Projects.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
ITS Georgia | June What is the role of ITS in the emerging public/private partnership transportation market in Georgia? ITS Georgia Monso_Julia.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
MAKING IT HAPPEN. TRB 88 th Annual Meeting Risk Management in Public-Private Partnerships January 14, 2009 Statutory and Public Policy Approaches to PPP.
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
IDOA RFP Media Buy Pre-Proposal Conference June 11, 2013 Adam Thiemann IDOA Strategic Sourcing Analyst.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Real Property Policy Update Planning and Development Committee August 4, 2015.
Selection of System Operators 1.  WIOA Requirement  Competitive Selection  RFP Team  Selection Process  Key Elements of the RFP  County Considerations.
Finding the Revenue Stream to Make P3s Work
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Green Line Extension Project
Gary Nower – Wilfrid Laurier University Edward Ng – EY
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
Light Rail Transit Project
Utility Revenue Bonds Series 2016 March 29th, 2016
Request for Proposal - Best Value
Developing and Issuing the RFP
Uniform Guidance - Procurement Implementation
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Request for Proposal - Best Value
PROJECT DELIVERY METHODS
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Design-Build Acquisition and Contract Incentives July 19, 2018
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Design-Build Acquisition and Contract Incentives May 9, 2019
Presentation transcript:

Ohio River Bridges Project Kendra W. York Public Finance Director of the State of Indiana Indiana Finance Authority

The Bridges Project

Memorandum of Understanding Between the States Executed by Gov. Daniels and Gov. Beshear on March 5, 2012: One project, Two procurements Indiana to lead on East End (AP) Availability Payment (AP) Kentucky to lead on Downtown (DB) Design Build (DB)

Selection of Availability Payment Model Significant market appetite for risk sharing Availability payment is fixed subject to indexation, creating budgetary certainty for public authority Innovative design process is facilitated by competitive RFP process Developer requires lower return due to guaranteed payment stream (subject to deductions) Encourages developer to keep facility open and perform to standards Developer has ability to access most efficient financing structure (bank vs. bond)

East End Crossing Procurement Availability Payment structure, assuming positive Value for Money Concessionaire responsible for delivering Sections 4, 5 and 6 Section 4 to be maintained by Kentucky Section 5 and Section 6 to be maintained by Concessionaire A separately procured toll operator to be responsible for all tolling operations

East End Procurement Schedule Memorandum of Understanding March 5 RFQ Issued March 9 Shortlist Announced April 23 Final Economic Impact Study April 26 Draft RFP Issued May 2 Final RFP Issued July 22 Committed Bids Received Oct 26

Evaluation Process Technical Proposal and Financial Proposal evaluations conducted separately by separate teams Evaluators are all IFA/INDOT personnel supported by staff and consultants No communication occurred between technical and financial teams until both teams had fully completed their evaluations Final step of combining technical and financial scores resulted in a total score out of a maximum of 100 points available

Financial Score Represents 75 of the total 100 proposal points available 72.5 of the 75 points determined by the proposer’s MAP score according to formula: Remaining 2.5 points awarded based on feasibility of financial proposal as determined by the evaluation committee Total Financial Score = MAP Score + Feasibility Score Lowest Value of Base MAP MAP Score = X 72.5 Points Proposer’s Value of Base MAP

Technical Score Represents 25 of the total 100 proposal points available Comprised of the sum of the Technical Proposal Score (up to 22.5 points) and Schedule Score (up to 2.5 points) Technical Proposal Score determined by 3 major elements: Preliminary Project Management Plan (40%) Preliminary Design-Build Plan (30%) Preliminary Operations and Maintenance Plan (30%) Schedule Score determined by formula: Difference (in calendar days) between (i) Proposer’s scheduled date to achieve Substantial Completion and (ii) the Base MAP Date Schedule Score = X 2.5 Points Difference (in calendar days) between (i) the earliest scheduled date to achieve Substantial Completion shown in any conforming Proposal, and (ii) the Base MAP Date

Best Value Determination Final step merges financial and non-financial considerations into a final score out of a maximum of 100 points available Combination of scores determined by formula: Total Proposal Score (out of 100) = Financial Score (up to 75 points) + Technical Score (out of 25 points)

Preliminary Preferred Proposer WVB East End Partners Equity Partners: Walsh Investors, VINCI Concessions, and Bilfinger Berger PI Financial Highlights Construction Cost: $763m* MAP: $32.9m Proposal Key Dates Commercial Close 12/24/2012 Financial Close 3/25/2013 Substantial Completion 10/31/2016* Construction Years 3.6 years *Construction cost lower than the $987m included in the July 2012 Initial Financial Plan *Completion date earlier than the June 30, 2017 completion date included in the July 2012 Initial Financial Plan