New Radon Resistant Construction & Mitigation National Tribal Forum-2012 Vivian Craig, Sr. Environmental Specialist NNEPA Radon Program.

Slides:



Advertisements
Similar presentations
Illinois Department of Nuclear Safety1 Radon Mitigation Overview So, you tell the homeowner that they have elevated radon. Now what do you tell them?
Advertisements

1. EPA’s Healthy Schools initiative is working with schools and other partners to provide education about environmental health issues and how they impact.
2011 CDBG Applicants’ Workshop Important Reminders for 2011.
2010 DCA CDBG Applicants’ Workshop New for 2010 & Important Reminders.
Job Order Contracting ( JOC) Chicago Department of Aviation Capital Improvement Program Panel member: Joseph S. Dote, Sr. Vice President R.M. Chin & Associates,
Real Estate Workshop May 19 – 21, 2014 Office of Program Management Mamie Smith-Fisher.
IEPR Staff Workshop – ZNE Buildings
Assessing Your School An Environmental Investigation You have been hired by Eagle Environmental, Inc. to perform an Environmental Assessment of South Hunterdon.
1 E-Procurement in Azerbaijan Republic Challenges and perspectives Elshad Samedzade, PHD & Arzu Aliyev
Office of Sponsored Programs November  Focus on What is Important  Proposal Structure  Proposal Development Process  Proposal Review.
NATIONAL RADON ACTION MONTH National Radon Action Month Raising Awareness, Reducing Risk, Saving Lives.
CDBG 2015 Technical Compliance. Sections 4.4 – 4.7 Handbook & Application 4.4 – 4.6: Projects 4.7: Residential Rehab Programs.
Climate Change and CDM in Thailand
2011 STATE BOARD OF DIRECTORS ORIENTATION It’s Good Business to do Business with an AGC Member 2011 Officers: (L to R) CEO Tom Holsman, Treasurer Curt.
Santa Fe Community College ACUPCC Southwest Collaborative Symposium Arizona State University March 2, 2012.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
ASHRAE A Ventilation Standard for Residential Structures Ventilation and Acceptable Indoor Air Quality in Low- Rise Residential Buildings.
STRENGTHENING HISTORICALLY BLACK COLLEGES AND UNIVERSITIES (HBCU) PROGRAM.
Black Falls Off-Grid Sanitation Construction Black Falls Water Project June-Aug, 2010 Rita Sebastian, Development Ronald Tohannie,
Regional Haze Rule Best Available Retrofit Technology Government to Government Consultation Navajo Nation Environmental Protection Agency.
Web Accessibility and Higher Education Presented by: Mr. B., Assistive Technology Specialist Ms. H., Assistant Director, Compliance and Disability Services.
TURTLE MT BAND OF CHIPPEWA Ray Reed – Brownfield Coordinator EPA-TRP.
NATIONAL RADON ACTION MONTH R A D O N: T E S T, F I X, S A V E A L I F E January is National Radon Action Month Raising Awareness, Reducing Risk, Saving.
University Planning: Strategic Communication in Times of Change Cathy A. Fleuriet Ana Lisa Garza Texas State University-San Marcos Presented at the July.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
Information Architecture: Planning for Success A Presentation to the Data Management Association National Capitol Region January 8, 2002 Ted Griffin Office.
United Nations Workshop on Revision 3 of Principles and Recommendations for Population and Housing Censuses and Evaluation of Census Data, Amman 19 – 23.
EPA’s Proposed Clean Power Plan House Committee on Natural Resources and Environment February 12, 2015 Tegan B. Treadaway Assistant Secretary Office of.
Developing a Tribal Radon Program Vivian Craig Environmental Specialist NNEPA Radon Program.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
Cultural Factors in Conducting Outreach on Radon Vivian Craig, Environmental Specialist NNEPA Radon Program.
Functions of Administrators Association of Chiropractic Board Administrators.
1 Slovak Policy in the area of RE and EE Juraj Valach Ministry of Economy Slovak Republic July 3-4, 2003, Szentendre.
Status of FY 2010 Budget Development Mary Jane Miller Director, Office of Budget Management Indian Affairs/Tribal Budget Advisory Council meeting Turning.
Advancing bicycling through unified state and local advocacy organizations Thunderhead Alliance 50 States/50 Cities Project Complete Streets Pro Walk/Pro.
Programme 1 (Administration) STRATEGIC PLAN AND 2015/16 ANNUAL PERFORMANCE PLAN.
Radon education -presentations -development of materials -forming collaborations -support from tribal government.
Overview of Grant Agreements - Agreement Process - Roadmap to the Agreement Document - Agreement Requirements/ Compliance Issues - Timelines for Reporting.
Multiple Species Habitat Conservation Plan Overview and Progress Marci Henson, Program Manager August 22, 2013.
Chapter 14 Section 5 Objective: To understand the executive agencies and the role of the cabinet.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Central Asia Public Procurement Forum Issyk Kul, Kyrgyz, 21 – 24 April 2009 ADB’s SUPPORT FOR PROCUREMENT CAPACITY DEVELOPMENT Dan Yang Director, Central.
Presented by Eliot Christian, USGS Accessibility, usability, and preservation of government information (Section 207 of the E-Government Act) April 28,
SRC Participation in Policy Development 1 NATIONAL STATE REHABILITATION COUNCIL FORUM JUNE 25, 2013.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
Spokane Tribal Air Quality Program: RADON Twa-le Abrahamson Air Quality Coordinator National Tribal Forum - June 2011.
Proposed Amendments to the By-Laws of the Board of Human Services Tonya Cureton Curry General Counsel Stronger Families for a Stronger Georgia 2/17/16.
Regional Accreditation Workshop For Asia and Eastern Europe Manila, Philippines th March, 2012.
Office of Management and Enterprise Services Central Purchasing Division Keith Gentry Contract Manager
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia COSCAP-SEA Action on Decisions 16 th Steering.
National Radon Meeting San Diego, CA
Citizen’s Academy – November 13, 2013
Global Youth Tobacco Survey (GYTS): Proposal Development
Department of Environmental Quality
Senate Meeting Summary
Jessica Montie, Division of Waste Management
Department of Environmental Quality
Department of Environmental Quality
Board Presentation August 3, 2016
Jessica Montie, Division of Waste Management
Centralization of Texas State Contract Compliance Functions
Region 4 Executive Committee Meeting August 18, 2011 San Francisco, CA
Input for ad hoc on software update on 7th Dec. from Japan
Navajo Nation Minor Source Regulations
Input for ad hoc on software update on 7th Dec. from Japan
North Carolina Department of Insurance Office of State Fire Marshal
Periodic Review and Expiration of Existing Rules (G.S. 150B-21.3A)
Congratulations to the Regional leadership academy class of 2019
Presentation transcript:

New Radon Resistant Construction & Mitigation National Tribal Forum-2012 Vivian Craig, Sr. Environmental Specialist NNEPA Radon Program

NEW RADON RESISTANT CONSTRUCTION Building the framework - Should we be concerned about Radon-YES.

 NNEPA Radon Program has to follow the following:  NN Procurement Policy process.  Regional Business Development Office (RBDO)  Source List  Sole Source List BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP

 Section 164 Review Process  Department & Phone No.  Document  Brief description of attachments  Reviewers  Sponsor/Program Signature  Division Director Signature  Office of Management & Budget  Office of Attorney General  Office of the President  Legislative Counsel  Committee Chairperson  Back to O.M.B. for Administrative Implementation  Business Regulatory Dept.  Comments Section BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP Signature Approval Sheet (SAS)

 The Instructor  Mr. Brad Turk  Environmental Bldg. Sciences, Inc.  Las Vegas, NM  Exceptional skills:  As an Instructor  People skills  Highly recommended  Workshop scheduled for August 2012 BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP

 Occupant on fixed income  No access to the crawlspace.  Install a Solar Panel to run the one fan 6 inch radon fan  Crawlspace 8 to 14 inches  No electricity at time of selection BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP

 Perfect home for radon mitigation.  Committed Homeowner  3-4 ft.  Clean crawlspace  Solid foundation no cracks along the joints  Access to crawlspace  Install one 6 inch radon fan

Hogan with dirt floor, no utilities and water After includes Electricity, Water and Septic System. CONTAMINATED STRUCTURES PROJECT UPDATES

Before with one bedroom including utilities After three bedroom w/all utilities, water and septic system CONTAMINATED STRUCTURES PROJECT UPDATES Before After

6 bedroom w/utilities, water and septic system. 6 bedroom-3 bath (1 ADA) w/utilities, water and septic system. CONTAMINATED STRUCTURES PROJECT UPDATES

Thank you from the “Award Winning NNEPA Radon Program”.