1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.

Slides:



Advertisements
Similar presentations
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Advertisements

1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
André Augustinus 16 June 2003 DCS Workshop Safety.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
D0 Workshop Bagby, Foglesong John Foglesong Run 2B SMT Low Voltage Power The present location of the SMT DC power supply units creates a problem.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
IDE DCS development overview Ewa Stanecka, ID Week, CERN
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
FLATPACK Rev.5 September 2002 Updated versions may be available.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
Low Voltage Power Supplies: towards design specifications Henryk Palka, IFJ PAN Krakow (for WP team: Krakow, Prague, KEK) DEPFET-Belle Meeting Karlsruhe,
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Status of the CERN ATCA specification and tender
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
TS2 preparatory meeting
Calorimeter Mu2e Development electronics Front-end Review
M. Hansen, CERN S. Lusin, CMS TC / UW
Evaluation and testing of advanced low-voltage power supplies
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Radiation- and Magnet field- Tolerant Power Supply System
RPC Detector Control System
TPC Detector Control System
RPC Detector Control System
Presentation transcript:

1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions

2 Detector requirements u Quantities u ALICE total ~160 LVPS crates and ~2000 PS channels u Draft technical specification (Spec) u Electrical characteristics u Mechanical characteristics u Monitoring and control u Cooling u Environment u Standard chapters on: u construction, safety, reliability, quality assurance, documentation

3 Spec: Electrical Characteristics u DC Output u Modular design; 2 – 7 V, 4 – 250 A modules LVPS 2 – 7 V, 4A LVPS 2 – 7 V, 250A 24h stability < 5mV or 0.1% 6m stability < 20mV or 0.5% Noise & ripple < 10mV p to p

4 Spec: Mechanical Characteristics TYPICAL RACK LAYOUT 4U 1U max 6U 1U max 6U VENTILATOR & CONTR. HEAT EXCHANGER LV PS HEAT EXCHANGER LV PS FRONT VIEW LV PS SPACE FOR CABLES 600 mm300 mm SIDE VIEW

5 Spec: Monitoring & Control LVPS 1 LOCAL PANEL Ethernet CANbus Provided by manufacturer External interlock OPC Server PC OPC Server PC PCI “Kvaser” Two options: a) Via CANbus b) Via Ethernet LVPS 1 LOCAL PANEL

6 Spec: MONITORING AND CONTROL FUNCTIONS VOLTAGESMONCONIndividual channelsESS CURRENTSMON12 bit resolutionESS RAMPING RATEMONCONIndividual channelsDES TEMPERATUREMONSensor above power circuitsESS OVER-CURRENT TRIP OFF VALUE MONCONIndividual channelsESS FAN STATUSMONOut of limit warningESS OVER-VOLTAGE STATUSMONIndividual channelsDES OVER-CURRENT STATUSMONIndividual channelsESS OVER-TEMPMONOut of limit warningESS MON = MONITOR CON = CONTROL ESS = ESSENTIAL DES = DESIRED FUNCTIONS/PARAM

7 Spec: MONITORING AND CONTROL FUNCTIONS DC TRIP OFFMONIndividual channels Global DC power ESS RESET DC TRIP OFFCONIndividual channels Global DC power ESS DC POWER ON/OFFMONCONIndividual channels Global DC power ESS AC POWER ON/OFFMONCONusing external powerDES PS HEALTHMONSummary statusDES LOCAL CONTROLMONRemote control locked outESS PS RESETCONSystem reset (tbs)??ESS MON = MONITOR CON = CONTROL ESS = ESSENTIAL DES = DESIRED FUNCTIONS/PARAM

8 VOLTAGESCONGroups of channelsDES DC POWER ON/OFFCONGroups of channelsDES RAMPING RATEMONCONGroups of channelsDES OVER-CURRENT TRIP OFF VALUE MONCONGroups of channelsESS MON = MONITOR CON = CONTROL ESS = ESSENTIAL DES = DESIRED FUNCTIONS/PARAM GROUP MANAGEMENT: THE POSSIBILITY TO CONFIGURE AND PERFORM FUNCTIONS ON GROUPS OF CHANNELS WITHIN A CRATE Spec: MONITORING AND CONTROL FUNCTIONS

9 Spec: OPC SERVER u General u Compliance with OPC standards u No effect on PS output due to failure of remote control u Restart of OPC remotely u Not send set points automatically at startup – read from device u PS shall maintain its set points during PS power failure u Genuine device and cache access u Interactive list of device functions

10 u Maintenance u To support future versions of Windows and OPC standards u To support future versions of PS firmware u Configuration u Allow appropriate management of the fieldbus u Human readable configuration file (such as XML) u Obtain actual configuration by scanning u Setting of ranges for analog values and setting of the dead band Spec: OPC SERVER

11 u Performance u Change in Device to OPC:max 10 sec at full bus load max 1 sec for a single PS u Device cache to OPC client:max 3 sec for all parameters u Write from OPC to device:max 1 sec u Interlock to start ramp-down:max 5 ms Spec: OPC SERVER

12 Spec: cooling, etc. u Cooling u Use of standard ventilators not possible due to stray magnetic fields u Water cooling recommended u Installed in rack with assured vertical airflow removing max 3kW/rack u Environment u RadiationTotal dose: 10 mGyFluency: 10 9 n/cm 2 u Magnetic Fieldup to 200 Gauss u Construction u Halogen free material u Safety regulations u CE certification u Reliability u MTBF > hours (excluding ventilators)

13 Spec: QA, documentation u Quality assurance u Production tests u Functional tests u Load tests u Documentation u User’s guide u Reference manual u Test and calibration reports

14 Target devices u Wiener u PL500 F8:product exists; water cooling; some control limitations u PL500 F12:prototype exists; might not be commercialized u Marathon:Prototype exists; should replace F8, F12 u Caen u SY1527:product exist; no water cooling u Easyprototype exist; B-field tolerant u Sasyprototype exist; high B-field tolerant u Arem Pro u DeviceH/W prototype exists; no water cooling

15 LVPS overview I DetectorPS chan [n o ] Target deviceModule [A] Crates [n o ] When required Common purchase SPD20Wiener PL500 F85044Q05Yes? or240 Caen Easy94 SDD216Arem Pro664Q05? SSD448Caen SY1527 or3.65?? orArem Pro TPC72Wiener PL500 F Q05yes or72Wiener Marathon5022 TRD180Wiener PL500 F Q05yes TOF?Caen Sasy???no HMPID100Wiener PL500 F830143Q05Yes, commit before 05

16 LVPS overview II DetectorPS chan [n o ] Target deviceModule [A] Crates [n o ] When required Common purchase PHOS & CPV 11Wiener PL500 F ?yes FMD?????? T04Caen Easy?1?yes V0?Caen Easy?1?? PMD?Wiener PL500 F8???yes ZDC?????? MTK364Wiener PL500 F Q05yes MTG16Wiener PL500 F811524Q04yes TOTAL ? 3 manufacturers - 7 types ? 4Q04- 4Q05 9 yes; 5 ?; 1 no

17 Procurement u Individual: TOF u Handled by the detector – non-CERN purchasing u Recommended to use the common technical specification – at least for the remote control u Common: SPD, TPC, TRD, HMPID PMD, PHOS & CPV, T0, MTK, MTG u Handled by ESS group – CERN tendering u No FI committee required u Market Survey out end June u Tender out early September u Close mid October u Small quantities mid November to end 04 u Not decided or no answer: SDD, SSD, FMD, V0, ZDC

18 Action summary u Send out market survey u PH/ESS group by end June 04 u Finalize the requirements u Electrical characteristics, granularity of control (size and amount of modules), control functions: detectors before mid August 04 u Radiation policy: TC mid August 04 u Issue the tender u Merge ALICE requirements with other experiments and send out tender TC + ESS group early September