HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.

Slides:



Advertisements
Similar presentations
Barhale Procedure for Site Establishment
Advertisements

UNIVERSITY of NORTHERN COLORADO HOT WORK PROGRAM.
HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
WELD TEST SPECIFICATIONS TOPICS COVERED IN THIS PRE TEST BRIEFING: ASME SECTION IX CODE WELD TEST SPECIFICATIONS VISUAL INSPECTIONS SAFETY IN WELDING.
ABC Chemical Complex1 Pipeline Repair ABC Company ABC Chemical Complex Engineering Specification.
East Carolina University Compressed Gas Safety Training Program
Railroad Commission of Texas Railroad Commission of Texas Pipeline Safety Division Damage Prevention Program.
COMPRESSED GASES. Compressed Gases Chemicals include oxygen, argon, nitrogen, helium, acetylene, hydrogen, nitrous oxide, carbon dioxide, ammonia, chlorine,
1 Personal Protective Equipment Module 6. 2 DISCLAIMER This material was produced under grant number SH from the Occupational Safety and Health.
Oxygen/ Fuel Cutting and Welding By Ryan Saucier.
PHMSA Perspectives Construction Process & Standards
Postal Responsibility/Contractor responsibility 1.Serial number of fire extinguisher 2.Number found on fire extinguisher and panel 3.Date extinguisher.
Review of ASME Guidance Articles on Repair Strategies
What we do and why we do it. Know how to inspect an SCBA bottle for damage prior to fill Know how to use the compressor Know how to document problems.
TRENCHING AND EXCAVATIONS
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
N.F.P.A. 13R Justin Bohlmann FIR-204.
OXYFUEL WELDING. INTRODUCTION Oxyfuel welding is a welding process where the heat for fusion is supplied by a torch using oxygen and a fuel gas. Several.
1 Hot Work Permits Corporate Environment Safety & Health.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
Gas Transmission Pipelines
1 Welding Module 10. 2Objectives After this module you should be able to – identify the most common welding hazards – take the necessary steps to avoid.
1 Personal Protective Equipment Module 6. 2Objectives After this module you should be able to – identify the most common PPE-related hazards – take the.
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Update Kenneth Y. Lee Engineering & Research Division
Lumbermen’s Underwriting Alliance
HOUSTON, TEXAS1 Corrosion Control and Monitoring ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
ABC Chemical Complex1 Maintenance of DOT Regulated Valves ABC Company ABC Chemical Complex Engineering Specification.
Safety Unit II.
Tools, Fire Extinguishers and Explosives Section E of the Forest Activities Code.
Hazardous Liquid Pipelines
Unit 2 Terms & Definitions.  Legal requirements designed to protect the public by providing guidelines for structural, electrical, plumbing, and mechanical.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
HAZARD COMMUNICATION (HAZCOM) Environmental Health, Safety, and Risk Management Stephen F. Austin State University.
SAFETY OBJECTIVE Without reference, identify basic facts about hospital safety practices pertaining to biological, chemical and fire hazards with at.
Safety Training Presentation
BASIC AUTO HAZARDOUS REGULATIONS. WASTE STREAMS RIGHT TO KNOW LAW n Hazard Communication Act of 1983 n Places some responsibility on Employer n Places.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
HOUSTON, TEXAS1 Hazardous Liquid Pipelines ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Hot Work Procedure Training
Rulemakings. Change in Derating Factor for PA-11 From.32 to.40.
Hazardous Materials Subpart H. Subpart H Standards Compressed Gases Acetylene Hydrogen Oxygen Nitrous Oxide Flammable.
HOUSTON, TEXAS1 Maintenance of DOT Regulated Valves ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
PIPELINE SPECIFICATIONS
Pipeline design in high consequence areas
Arc Welding Basics SECTION OVERVIEW:
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
METAL LOSS IN-LINE INSPECTION SURVEYS LIMITS AND INACCURACIES.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Subpart F - Fire Protection & Prevention ( ) Flammables/combustibles - Approved containers Fire protection program/equipment 2A fire extinguishers.
Hot Work Permit Osan AB Fire Emergency Services.
Flammable Liquids Directorate of Training and Education
Excavation & Trenching Awareness Plus
Rev. 1 © Chevron 2009 Hot Work Awareness Plus. Rev. 1 © Chevron Training Objectives  To explain the type of work which may constitute Hot Work.
Maintenance of DOT Regulated Valves
PIPELINE SPECIFICATIONS
Goodyear Napanee Contractor Safety
Flammable and Combustible Liquids
Oxygen/ Fuel Cutting and Welding
TRENTON Casing Filler Presentation
PIPELINE SPECIFICATIONS
Gas Transmission Pipelines
Maintenance of DOT Regulated Valves
Presentation transcript:

HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification

HOUSTON, TEXAS2 Pipeline Repair u PURPOSE –Provides repair guidelines on above ground and buried pipelines. u GENERAL –When a pipeline is determined to be leaking, an immediate temporary repair will be made to insure public safety, minimize damage to property, and avoid damage to the environment.

HOUSTON, TEXAS3 Pipeline Repairs u REFERENCES –API 1104 » Welding of Pipelines and Related Facilities –API 1107 »Pipeline Maintenance Welding Practices –ASME B31.8 »Gas Transmission and Distribution Piping Systems –ASME B31.4 »Liquid Transportation Systems for Hazardous Chemicals and Hydrocarbons

HOUSTON, TEXAS4 Pipeline Repair u DEFINITIONS –CGI: Combustible Gas Indicator –HVL: Highly Volatile Liquid –LEL: Lower Explosion Level –MAOP: Maximum Allowable Operating Pressure –MSDS: Material Safety Data Sheet

HOUSTON, TEXAS5 Pipeline Repair u Consult MSDS for the pipeline product during a pipeline repair. Determine personal protective equipment specific to the chemical and request from person in charge of the repair. u The following table summarizes the minimum required safety equipment for pipeline repairs.

HOUSTON, TEXAS6 u Material or Chemical –Ethylene –Hydrogen –VCM Vapors –VCM Liquids –Kerosene –Ethylene Dichloride –Natural Gas u Safety Equipment –Fire extinguisher –Combustible Gas Ind. –Fire Retard. Clothing –Eye goggles –Ear plugs –Full or air face mask –Slicker suits and boots –Non-Sparking Tools

HOUSTON, TEXAS7 Pipeline Repair –Check for gas presence prior to welding in or around an area containing flammable gas or liquids. –Maintenance craftsman have the final authority for work to be performed. –Post warning signs at the entrances of the right- of-way during repair work.

HOUSTON, TEXAS8 Pipeline Repair u PROCEDURE –Leak Repairs »Leak Classification »Pinpointing the Leak - Aboveground Gas and HVL »Pinpointing the Leak - Underground Gas and HVL »Excavation »Precautions »Preliminary Failure Analysis »Initial Leak Arrest

HOUSTON, TEXAS9 Pipeline Repair –Methods of Repair - Corroded Areas »Repair, if possible, by cutting out a cylindrical pipe section and replacing it with a pipe of equal or greater design strength. »Do not weld on hydrogen or ethylene pipelines before shutdown/purging operations are complete. »Acceptable repairs on a pipeline during operation: u Weld a nipple over a small leak and install fitting. u Install a leak clamp over a corrosion pit. u Use a patch with rounded corners for pipe with <40K SMYS. u Repair with full encirclement welded split sleeve.

HOUSTON, TEXAS10 Pipeline Repair –Leak Repair - Cracks or Tears »Replace a cylindrical section containing the crack or tear with an equivalent pipe section. »Reduce the pressure to 20SMYS equivalent or less if the line cannot be removed from service. u Determine the pipe condition by visual and NDE methods. u Stop welding or heating operations on the pipe. u Drill the ends of the crack and test by NDE u Repair with a full encirclement welded split sleeve. u Request Unit Manager approval to return to service.

HOUSTON, TEXAS11 Pipeline Repair –Leak Repair - Gouges, Grooves, and Dents »Repair by cutting out a section of the pipeline containing the defect and replace with a new section of equivalent or higher strength and composition. »Reduce pressure to 20%SMYS or less if line cannot be removed from service. Use one of the following methods for repair: u Install a full encirclement welded split sleeve. u Repair with installation of a full encirclement welded hot tap sleeve providing the entire defect can be removed with the hot tap coupon.

HOUSTON, TEXAS12 Pipeline Repair u RECONDITIONING OF PIPE –Pipelines that cannot be removed from service »Repair with replacement of an equivalent section. »Repair cracks in welds by grinding and rewelding. »Repair small corroded areas by weld metal overlay. »Repair small pitted areas with a welded patch. »Repair large corroded area with a full encirclement welded split sleeve. »Repair all gouges or grooves deeper than 10% wall thickness. Use a full encirclement welded sleeve.

HOUSTON, TEXAS13 Pipeline Repair »Repair dents deeper than 1/4” on pipe to NPS 12 or more than 2% greater than NPS 12. »Repair dents that affect the curvature of the pipe with removal of a cylindrical section containing the defect and replacement with an equivalent section. »Repair dents not meeting the above restrictions by filling the dent with a hardenable material and installing a full encirclement welded split sleeve.

HOUSTON, TEXAS14 Pipeline Repair –Initial Inspection »Determine soundness of the pipe adjacent to the defect prior to work »Inspect external surface of the pipe by one of the following methods: u Inspect exterior of pipe visually aided by a pit gage. u Use magnetic particle inspection if cracking is suspected. u Determine pipe wall thickness with ultrasonic testing. u Use radiographic inspection as required for definition.

HOUSTON, TEXAS15 Pipeline Repair –Welding »Check for hardness on hydrogen lines and maintain a hardness equal to or less than BHN 235. »Welding Procedures u Perform all weld repairs by Company employees using Company Welding Procedure Specification (WPS) 1.2. u Perform all weld repairs by Contract employees using Company-approved welding procedures provided by the Contractor.

HOUSTON, TEXAS16 Pipeline Repair »Welder Qualifications u Use Company welding procedure for qualification of Company employees to make weld repairs. u Use Contractor welding procedure (Company approved) for qualification of Contract employees to make repairs. »Burn through control u Burn through during welding is not expected when welding parameters do not exceed 20 volts and 100 amperes, if the remaining wall thickness is greater than inches (See ASME/ANSI B31.8, paragraph f). Welding performed outside these limits must be approved by the Plant Engineer.

HOUSTON, TEXAS17 Pipeline Repair –Coating Repair »Repair pipe coating damaged during pipeline repair activities in accordance with the original coating manufacturer’s recommendations. »Hydrotest pipe replacement sections to 1.5 times MAOP prior to installation. Hold for one hour. »Test all field welds with 100% NDE coverage using the best method for the weld configuration. »Grade and repair weld defects in accordance with API 1104 and API 1107 requirements.

HOUSTON, TEXAS18 Pipeline Repair –Documentation »Include the location of the leak, location class, grade of the leak, and action taken when writing leak reports. »Add repair reports to the original equipment file, the inspection file, and the DOT coordinators file. »The DOT Coordinator shall determine if the leak is classified as an incident that requires reporting to the regulatory authorities.