THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY UKNF RF: Status Cockcroft Institute (Dept. Engineering, Lancaster University, UK) January.

Slides:



Advertisements
Similar presentations
Conventional e+ source: 300 Hz linac R/D Beam loading compensation study at ATF ECFA LC2013 at DESY KEK Junji Urakawa ICS Chamber including Laser.
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Nick Walker KEK-DESY meeting 7 th March 2005.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Proposed Button Design for a Series of High Power Button Tests Arash Zarrebini-Esfahani 22 nd August 2007.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
US Cavities Status and Plan Mark Champion 01 October 2009.
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
Latest Design of ILC ( RDR). 1.3 GHz technology developed by TESLA Collaboration, R&D from 1992 to reduce the cost per MeV by a factor of 20 from current.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Accelerator R&D status in cooperation with CERN and KEK 1.BSM, BHM (T. Mitsuhashi) 2. Crab Cavity (Y. Morita) 3. X-band Acc. Structure (T. Higo) 10 th.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
1 Eiji Kako (KEK) in cooperation with Japanese Industries IPAC-2010 Satellite Workshop, Kyoto, May 23, A Satellite Workshop at IPAC Superconducting.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
1.3GHz Input Coupler for ILC
Topical workshop on The Neutrino Factory and Muon Collider Oct 2007 RF Systems for a Neutrino Factory Rebecca Seviour Cockcroft Institute Lancaster University.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Advanced Accelerator Association (AAA) Promoting Science and Technology - Activities with Technology Group : A. Yamamoto AAA Activities, Japan.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
Page 1 F. Peauger High Gradient preparation - Team Meeting – CERN – 12/12/07 High Gradient Preparation of a 30 GHz HDS-Thick structure 1.Physical arguments.
Modify Existing Scanning Electron Microscope (SEM) SEM FE Probe Surface Science Study L. Laurent, S. Tantawi, R. Kirby *This research is funded by the.
JRA1 – SRF report CARE Steering Committee meeting,
D EVELOPING A N U NDERSTANDING O F B REAKDOWN I N NF C U C AVITIES Arash Zarrebini UKNF Meeting– 8 th January 2010 U.K Cavity Development Consortium.
RF Breakdown Study Arash Zarrebini MuCool RF Workshop 15 th October 2008 U.K Cavity Development Consortium.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
Vacuum RF R&D in UK Arash Zarrebini MuCool RF Workshop – 8 th July 2009 U.K Cavity Development Consortium.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
COPPER PHOTOCATHODES DEVELOPMENTS AT ASTEC R. Valizadeh Accelerator Science and Technology Centre Science & Technology Facility Council, UK.
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
Annual Meeting CERN - November 2005 Bernard V ISENTIN.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
State of ECR Plasma Test & Measurement of Ferrite Materials Permittivity Summer student meeting August 27, 2007 Ivan Pechenezhskiy, MIPT. Supervisor: Genfa.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
WG2 discussion Conveners: G. Ciovati, D. Kostin, Y. Yamamoto.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
26 October 2010IIFC meeting, RRCAT Indian Institutions and Fermilab Collaboration Activities at IUAC Presented by D. Kanjilal Inter-University Accelerator.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
Summary of STF-EP facility at KEK.
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
ILC-SCRF Test Facilities considerations
STF Plan of gradient improvement
Complementary ISTC Projects #3888, 3889p
Activities of Cavity Fabrication Facility at KEK
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Superconducting Cavities: Development/Production
Novel Accelerator and Detector Systems
Presentation transcript:

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY UKNF RF: Status Cockcroft Institute (Dept. Engineering, Lancaster University, UK) January 2007 Rebecca Seviour

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY Objectives Complement the US research programme Investigate surface topology & Chemistry How preparation effect topology & Chemistry Try to determine reproducibility Try to determine which dominates performance Investigate alternatives to Electropolishing Modularised approach

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY …… positively impressed by the systematic and scientific approach … considers [this activity] to be very important it deserves continuous and increasing support. Junji Urakawa KEK; Roland Garoby CERN; Ilan Ben-ZviBNL; F. Willeke DESY

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY WP4 – still waiting decision FP7 – CERN SCRF Facility - SCRF Research (CARE) - Novel Acc Systems - MUON Cooling UK NF RF Collaboration (Establishing) - Cockcroft/ IC/ Brunel Status

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY UK NF RF Collaboration Shell Manufacture - OFHC Cu Spec 101 vs 103 !! - fabrication Technique - Spining - Hydroforming - Welding - EBW - TiG - Laser Welding - Position of Weld - Port pulling - Tuning system - Cooling Surface Prep & characterisation - Electropolishing - Different chemical Specs - Auger - Develop statistical map of impurities - Topology Mapping (AFM) - Develop statistical map of defects

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY (Defects) (Defects/Surface) (Shape/Defects/Surface) Elctropolishing

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY 201 MHz Cavity Simulation

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY Issues: Quality of E Beam weld EB vs TIG

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY Plasma Spots Hot Spots (2004) Cracking Field Emission Workshop on High Gradient RF Argonne National Laboratory October 7-9, 2003 Issues: Surface Finish

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY Electro Polishing Pump (0-1 L/min) (Need) Heat Exchanger DC Supply (0-32 V, A, ripple ~35 mV (rms)) (Need) + R. Rimmer, and own mix

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY Currently just going to try deionised filtered water Rinse

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY Electro Polishing Issues

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY Clean Room Assembly Class 100

THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY