1 July 11, 2008Mike Barnes, AB/BT Present Status and Future Plans for the MKD Beam Dump Kickers Acknowledgements: input gratefully received from Fritz.

Slides:



Advertisements
Similar presentations
Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
Advertisements

SPS impedance work in progress SPSU meeting August 11 th 2011.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
PS-SPS days, January 18 th, 2006AB/BT Kicker and Septa status and expected performance at the 2006 start-up With input from: B. Balhan, E. Carlier, F.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Update on MKI Performance: TS3 to 02/10/2012 M.J. Barnes Acknowledgements: P. Adraktas, V. Baglin, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Caspers,
Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi,
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
Agenda: General kickers analysis Wang-Tsutsui method for computing impedances Benchmarks Conclusions Bibliography Acknowledgments: E.Métral, M.Migliorati,
Status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, N. Mounet, T. Rijoff, B. Salvant.
Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,
Updated status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, B. Mikulec, N. Mounet, T. Rijoff,
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Electrostatics #5 Capacitance. Capacitance I. Define capacitance and a capacitor: Capacitance is defined as the ability of an object to store charge.
11 Update of the SPS impedance model G. Arduini, O. Berrig, F. Caspers, A. Grudiev, E. Métral, G. Rumolo, B. Salvant, E. Shaposhnikova, B. Spataro (INFN),
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
1 EuroTeV High Bandwidth Wall Current Monitor Alessandro D’Elia AB-BI-PI.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
Feasibility of, and options for, the new MKE kicker concept M.J. Barnes, T. Kramer Acknowledgements: L. Ducimetière, B. Goddard, B. Salvant, J. Uythoven,
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
1 Update on the impedance of the SPS kickers E. Métral, G. Rumolo, B. Salvant, C. Zannini SPS impedance meeting - Oct. 16 th 2009 Acknowledgments: F. Caspers,
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Elias Métral, LHC collimation working group meeting, 17/07/061/26 E. Métral for the RLC team LATEST ESTIMATES OF COLLIMATOR IMPEDANCE EFFECTS u Reminder:
4/11/2014 LIU-SPS ABT review1 M.J. Barnes, L. Ducimetiere, T. Kramer, W. Weterings Acknowledgements: E. Carlier, G. Rumolo, B. Salvant, C. Zannini.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Update on the TDI impedance simulations and RF heating for HL- LHC beams Alexej Grudiev on behalf of the impedance team TDI re-design meeting 30/10/2012.
Heating and Outgassing from MKP- L Magnet M.J. Barnes & L. Sermeus Acknowledgements: M. Beck, H. Bartosik, G. Bregliozzi, C. Pasquino, G. Rumolo, L. Vega.
Injection/Extraction Kicker CR Aleksey Kasaev BINP-FAIR-GSI workshop
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
HP-PS injection and extraction status W. Bartmann, B. Goddard HP-PS meeting, 20-November 2013.
Brennan Goddard CERN AB/BT LHC LUMI th October 2006 Beam transfer considerations The various mooted upgrades of the CERN accelerator complex up to.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
MKI Performance During 2016 and Plans for EYETS
Present Status and Future Plans for the MKE Kicker Magnets
LINAC4 ADVISORY COMMITTEE
Status of the CLIC DR wiggler design and production at BINP
The LHC Beam Dumping System
Longitudinal impedance of the SPS
Updated status of the PSB impedance model
Follow up on SPS transverse impedance
CTF3 kicker activities at CIEMAT
FCC hh dump kicker - switch topologies and impact on beam
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
FCC Kicker Systems M.J. Barnes, T. Kramer CERN TE-ABT
TRANSVERSE RESISTIVE-WALL IMPEDANCE FROM ZOTTER2005’S THEORY
FCC-hh injection group 7
Also on behalf of V. Senaj & L. Ducimetière
LHC COLLIMATOR IMPEDANCE
Status of the EM simulation of ferrite loaded kickers
MKI Operational Experience and Future Plans
KICKER STATUS G-2 meeting March 5, 2014
Review of ferrites used at CERN to damp HOMs: TE/ABT equipment
TRANSVERSE RESISTIVE-WALL IMPEDANCE FROM ZOTTER2005’S THEORY
Elias Métral ( min, 19 slides)
C. Zannini, G. Rumolo, V.G. Vaccaro
Status of the EM simulations and modeling of ferrite loaded kickers
Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens
Current impedance issues
PS KFA45_17 Wire Measurements and Simulation
Presentation transcript:

1 July 11, 2008Mike Barnes, AB/BT Present Status and Future Plans for the MKD Beam Dump Kickers Acknowledgements: input gratefully received from Fritz Caspers, Enrique Gaxiola, Tom Kroyer, Viliam Senaj & Jan Uythoven. M.J. BARNES, AB/BT

July 11, 2008Mike Barnes, AB/BT CERN SPS & LHC Kicker Magnet Systems PS LHC SPS PS ComplexPS LHC SPS PS Complex 4 x MKI 2 x MKDV 3 x MKDH 4 x MKI 2 x MKDV 3 x MKDH

3 July 11, 2008Mike Barnes, AB/BT  When the beam can not be extracted: dumping of the beam using the MKD beam dump system (MD, emergencies...)  The system consists of:  Horizontal (MKDH) and vertical (MKDV) kicker magnets  Beam-dumps TIDV (E > 105 GeV/c) and TIDH (E < 37 GeV/c)  Function of the kicker magnets:  Sweep the beam to distribute the beam energy over a large volume of the absorbed block.  Function of the beam dumps:  Absorb the beam. II. MKD Beam Dump System

4 July 11, 2008Mike Barnes, AB/BT II. Principle of Beam Dumping

5 July 11, 2008Mike Barnes, AB/BT MKD Kicker Magnets  The MKD Beam Dumping System kicker magnets are installed in SPS LSS1;  Two MKDV magnets & three MKDH magnets provide vertical & horizontal deflection, respectively;  ~30 year old equipment;  No transition pieces between vacuum tank and kicker magnet. MKDV1 MKDV2MKDH1MKDH2MKDH3 Beam Simplified schematic of MKD magnet layout in LSS1 MKDV magnet in lab Ferrite PT100 sensor

6 July 11, 2008Mike Barnes, AB/BT MKD Magnet Parameters MKDV1MKDV2MKDH1MKDH2MKDH3 Kick direction Vertical - downwards Horizontal – inwards # Magnets # PFNs 3111 Magnet length 2.56m 1.256m Tank length 3.052m (~2.89m int.) 3.052m (~ 2.89m int.) 1.76m Horizontal aperture 75mm83mm96mm 105mm Vertical aperture 56mm 60mm Sections per mag Kick rise time (2%  98%) 1.1μs1.0μs23μs Magnetic material 8C11 Ferrite Laminated steel (0.35mm)

7 July 11, 2008Mike Barnes, AB/BT MKDV  MKDV1 & MKDV2 are 5 cell, transmission line, magnets constructed from (8C11) ferrite:  Each cell ~50cm long;  Above about 120  C, 8C11 ferrites loose their magnetic properties.  Three parallel PFN’s (3 Ω each) feed two, electrically parallel, magnets (2 Ω each) – this implies a failure in one magnet has an impact upon field in another;  Thyratron and ignitron switches are used for MKDV:  Thyratrons provide fast rise-time capability & the ignitrons conduct a significant duration of the high current;  Three PFNs were necessary for current sharing between switches;  Limited dynamic range of ~4.3 (~11 kV to ~46 kV on PFN) – for PS2 it will be necessary to dump at 50 GeV/c (or maybe even 26 GeV/c – TBD). Hence a dynamic range of 9 (or maybe 18) will be required.  Temperature probes not fitted to magnets installed in LSS1 (PT100’s fitted to magnet in lab);  No measures taken to reduce beam coupling impedance to ferrite;  No transition pieces, between magnet tank and magnet frame, installed in LSS1.

8 July 11, 2008Mike Barnes, AB/BT MKDH  MKDH1, MKDH2 & MKDH3 are lumped inductance magnets constructed from 0.35mm thick (or thinner), C-shaped, steel plates:  Thickness of the plate is parallel to the beam direction.  No problems with Curie temperature. Temperature limit will be due to mechanical constraints (150  C ??).  In the early 2000’s, ignitron switches were replaced with Fast High Current Thyristors (FHCT’s):  The FHCT’s permit magnet current to be proportional to the beam energy over a dynamic range of 30 (from injection at 15 GeV/c to a top energy of 450 GeV/c);  Each magnet has its own capacitor bank (precharge of 10 kV produces a magnet current of 21 kA amplitude);  Temperature probes not fitted to magnets installed in LSS1;  No measures taken to reduce beam coupling impedance to steel;  No transition pieces, between magnet tank and magnet frame, installed in LSS1.

9 July 11, 2008Mike Barnes, AB/BT Beam Induced Heating  Kicker magnets are heated by the beam due to their beam coupling impedance. Heating is caused by coupling between beam and real part of impedance.  High intensity beam can result in high power deposition.

10 July 11, 2008Mike Barnes, AB/BT Aperture Longitudinal Impedance: Analytical Calculation (1) From CERN-SL AP, by H. Tsutsui, pp7-10: Above equation is for 2D (infinite length) geometry. Analysis appears to allow for complex permeability and permittivity. Longitudinal impedance per unit length

11 July 11, 2008Mike Barnes, AB/BT Longitudinal Impedance: Analytical Calculation (2) Coding equation 27 (slide 10) in Mathematica format: Longitudinal impedance per unit length Longitudinal impedance depends upon frequency, horizontal aperture, vertical aperture, relative permittivity and relative permeability. Ferrite X hap vap Aperture

12 July 11, 2008Mike Barnes, AB/BT Applying equations from slide 11: MKDV2: 150Ω MKE-S: 3.4kΩ MKE-L: 3.2kΩ MKDH1,2: 1.6kΩ c.f. ~2.6kΩ meas. c.f. ~200Ω meas. Notes: Equations on slides 10 & 11 are for ferrite and hence not really applicable to a laminated steel MKDH magnet …. smooth nature of curves. Longitudinal Impedance: Analytical Calculation (3)

13 July 11, 2008Mike Barnes, AB/BT Longitudinal Measurements MKI: 15 screen conductors MKDV2: no beam screen or transition pieces. Spikes due to cell length ??? MKE (L10): stripes on all cells MKE: no stripes MKE (S6): stripes on 2 of 7 cells From presentation to SPSU Study Team meeting on May 13, 2008:  MKE: serigraphy (painted stripes) reduces power deposition, in ferrite, by a factor of:  >4 for LHC beam;  ~7 for CNGS beam. MKI: no screen Apertures (hap x vap): MKE-L: x 35mm; MKE-S: 135 x 32mm; MKI: 54 x 54mm; MKDV2: 56 x 83mm. Cell Length: MKE: ~24cm; MKDV2: ~50cm. (Note: impedance data in following plot is scaled according to length of tank rather than magnet length; therefore actual impedance per metre is larger than shown in plot)  MKI: 15 screen conductors reduce power deposition, in ferrite, by a factor of ~40 for LHC beam.

14 July 11, 2008Mike Barnes, AB/BT CNGS Beam: Power Depositions  Use measured Real Impedance Longitudinal Data, for MKDV2 (see slide 13), without “spikes” (200 MHz intervals used):  “2 x” 7 W/m  Use analytical calculation for Real Impedance Longitudinal Data, for MKDH1,2 (see slide 12), (200 MHz intervals used):  “2 x” 32 W/m  Note: for MKE-L10, using measured Real Impedance Longitudinal Data, (see slide 13), scaled by 2.2/1.7:  “2 x” 25 W/m  Thottest-equilibrium=35  C (based on 26  C tunnel) Calculated power deposition based on: CNGS beam spectra measurements made by G. Arduini and T. Bohl (4.5 s period) – see Note ; 2.5x10 13 protons per pulse; A total cycle duration of 6 s.

15 July 11, 2008Mike Barnes, AB/BT MKE: Beam Coupling Impedance Reduction  Beam coupling impedance is reduced using conductive stripes (serigraphy), i.e. interleaved comb structure, directly printed onto the ferrite blocks and a reliable contact to the metallic HV plates at either side;  Capacitive coupling between stripes (stripes carry beam image current). Printed strips in MKE-L10 Interdigital comb structure 20mm spacing surface discharge

16 July 11, 2008Mike Barnes, AB/BT MKI: Beam Coupling Impedance Reduction Z Metallization – to give coupling capacitance Note: 0.7 x 2.7 mm conductors implemented for HV reasons.

17 July 11, 2008Mike Barnes, AB/BT Transverse Impedance Measurements  Information re Transverse Impedance, and measurement techniques, can be found in: Tom Kroyer’s presentation “Wire Measurements on the MKE Extraction Kicker Magnets” APC meeting 10/11/2006. Shielding increases transverse impedance at ~100MHz, but gives some reduction in transverse impedance above ~300MHz. MKE: no shielding MKE: stripes on all cells H V H V H V

18 July 11, 2008Mike Barnes, AB/BT Summary  MKDV2 longitudinal impedance, unshielded, is generally lower than that of MKE-L10 with full serigraphy (slide 13).  “Spikes” on measured longitudinal impedance (slide 13), which are not present in analytical calculation (slide 12), are probably attributable to magnet cell length.  Shielding increases MKE magnets transverse impedance at ~100 MHz, but reduces transverse impedance above ~300 MHz (slide 17).  No beam impedance measurements carried out on MKDH magnets: effect of laminated steel (permeability, permittivity, conductivity, plate thickness), versus ferrite, therefore not quantified.

19 July 11, 2008Mike Barnes, AB/BT Future Plans  Remove third PFN from MKDV installation, i.e. two PFN’s of 2 Ω each, each with an individual magnet (2 Ω each) [reliability issue];  For PS2 operation a dynamic range of 9 (or maybe 18) is required: development of a (fast) semiconductor switch for MKDV may be required;  What will be the available beam gap for field rise-time for the MKDV’s ?  Measure longitudinal and transverse impedance of MKDV magnet with transition pieces installed – measured impedance may be higher than without transition pieces, because of “bypass effect” without transition pieces;  Measure longitudinal and transverse impedance of MKDH magnet (effect of laminated steel ….);  Is beam shielding necessary for MKDV magnets since MKDV2 longitudinal impedance, unshielded, is generally lower than that of MKE-L10 with full serigraphy?  Beam shielding necessary for MKDH magnets?  Are transition pieces between magnet and tank necessary?

20 July 11, 2008Mike Barnes, AB/BT Bibliography  T. Bohl, “CNGS Beam in the SPS: Beam Spectra”, Note  F. Caspers “Impedance Measurement of the SPS MKE Kicker by means of the Coaxial Wire Method”, PS/RF/Note  F. Caspers, “A Retrofit Technique for Kicker Beam-Coupling Impedance Reduction”, CERN-AB  E. Gaxiola et al, “Experience with Kicker Beam Coupling Reduction Techniques”, PAC2005 E. Gaxiola, “SPS Extraction Kicker Performance with Impedance Reduction Measures”, div.web.cern.ch/ab-div/Meetings/APC/2006/apc061110/EG-APC pdf  P.E. Faugeras et al., “A Laminated-Iron Fast-Pulsed Magnet”, CERN-SPS/ABT/  T. Kroyer, “Wire Measurements on the MKE Extraction Kicker Magnets”, div.web.cern.ch/ab-div/Meetings/APC/2006/apc061110/TK-APC pdf  T. Kroyer et al, “Longitudinal and Transverse Wire Measurements for the Evaluation of Impedance Reduction Measures on the MKE Extraction Kickers”, AB-Note  H. Tsutsui, “Some Simplified Models of Ferrite Kicker Magnet for Calculation of Longitudinal Coupling Impedance”, CERN-SL AP,  J. Uythoven, “MKE Heating and Measured Power Spectra: CNGS BEAMS”, div.web.cern.ch/ab-div/Meetings/APC/2004/apc041210/uythoven.pdf  J. Uythoven et al, “Beam Induced Heating of the SPS Fast Pulsed Magnets”, EPAC2004