Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.

Slides:



Advertisements
Similar presentations
STREGA C1:Cryogenic Last Stage Suspension (10 MIN) Task -C1: thermal conduction investigation of final stage suspension; This part of the suspension system.
Advertisements

STREGA M2:Advanced materials and techniques for resonant detectors (5 MIN) Participants: INFN * -Istituto Nazionale di Fisica Nucleare IFN-Istituto di.
Istituto Nazionale di Fisica Nucleare Sezione di Padova Sede: Dipartimento di Fisica Galileo Galilei Via Marzolo 8, Padova - Italy Daniele Corti.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
Detector Systems Update MICO April 23, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
LHCb-VELO evaporator CoBra Calculation and feed through ideas. 18 February 2015 Bart Verlaat 1.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
JHCBC AUTO A/C PERFORMANCE TESTING CHAPTER 3 Page
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
1 S. Coelli, M. Monti - INFN MILANO Istituto Nazionale di Fisica Nucleare Sezione di Milano LHCb – UT TRACKER UPGRADE 30 September 2013 UT TRACKER DETECTOR.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
© Swagelok Company, 2003 Swagelok confidential. For internal use only. © Swagelok Company, UW Series Bellows Valve BPVC ASME III Classes 1,2,3 Canada.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 24/9/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
ILIASN4 Cascina, November 3rd, 2005Dominique Lalanne.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
UT evaporator concept and performance Review of the suggested evaporator and manifold designs and results of performance measurements Istituto Nazionale.
Overview WG4 Meeting - 16th October 20121M. Gomez Marzoa, E. Da Riva Maximum ΔT admissible at cooling system T_1 T_2 T_1+0.5*ΔT Stave  If T_2 – T_1 =
Detector cooling system Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting Simone Coelli For the Milano UT Group INFN.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Installation of the T600 at Fermilab CSN2, September 22,
Manifolds optimization and pressure drops in the ATLAS TRT CO 2 cooling system Joël Grognuz.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Stave thermal analysis Cooling connections CO2 warm Test
ATLAS Internal ID Service Integration
DT-LHCb coordination meeting 18 April 2016
Feedback on transfer line sizing and flow calculations for UT
Installation of the T600 at Fermilab
Mock-up and integration status
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
Technical Design for the Mu3e Detector
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
Performance of an Automated Water Based Cooling System for CBM MuCh
Tracker cooling loop “check out” draft for discussion
ALICE PD group meeting Andrea Francescon.
Services Layout – Update
Flexible lines assembly
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
IBL activities ATLAS Meeting Milano, 14 May 2012 S. Coelli,
Status of CO2 Cooling tests at CERN for Pixel phase 1
Presentation transcript:

Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto Nazionale di Fisica Nucleare Sezione di Milano

Work in progress DETECTOR COOLING TEST LHCb UT central stave characterization measurement have been done full power applied Work in progress to extract information from test and create a useful output The preparation of a calculation note with the technical details is in progress cooling measurement, after pc and other refurbishment, will restart this week

Work in progress We are working on a new design hypothesis of the stave inlet and outlet connections using a 1/16” ‘flexible’ pipe from the manifolds, to cope with the space and mechanical problems. The relevant material, 1/16 “ pipes and calibrated orifices to be mounted on the cooling test have been ordered, together with needle valves, arriving 10 September. The VCR connections on the pipe will be glued for the test but welding joint is considered for the detector. A dummy line using real components according to this design will be mounted and tested using the TRACI system. More details in next presentations.