Pre kick off meeting 1 1 NCHRP_22_24 January 22 2007 CME Activities 1.Define reporting procedures for simulations (data output, variables, etc) 2.Define.

Slides:



Advertisements
Similar presentations
Chapter 26 Legacy Systems.
Advertisements

Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Configuration Management
Environmental Management System (EMS)
Chapter 17 Design Analysis using Inventor Stress Analysis Module
System Design and Analysis
7.2 System Development Life Cycle (SDLC)
Chapter 11: Testing The dynamic verification of the behavior of a program on a finite set of test cases, suitable selected from the usually infinite execution.
PROPOSALS THE REVIEW OF THE 1958 AGREEMENT AND THE INTRODUCTION OF INTERNATIONAL WHOLE VEHICLE TYPE APPROVAL (IWVTA) IWVTA Informal Group WP th Session.
J. McPherson; October Sensitivity of Carbon/Epoxy Laminates to Void Content A Thesis Proposal Submitted to the Graduate.
Introduction to ISO New and modified requirements.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
CSI315 Web Applications and Technology Overview of Systems Development (342)
Chapter 2 The process Process, Methods, and Tools
Development of Verification and Validation Procedures for Computer Simulation use in Roadside Safety Applications NCHRP FUTURE WORK FOR TASK 8 Worcester.
Uganda Science Digital Library (USDL) Digitizing and publishing documents Bergen – Makerere visit February 2005.
Forty-second session of GRSP December REGULATION No. 94 (Frontal collision) Proposal for draft amendments Proposal submitted by France Informal.
Approaches to quality assurance TIPA’s perspectives Fatmir Demneri.
From membership to leadership: advancing women in trade unions Working groups ETUC workshop, Berlin 28 October 2010.
D1.HGE.CL7.01 D1.HGA.CL6.08 Slide 1. Introduction Design, prepare and present reports  Classroom schedule  Trainer contact details  Assessments  Resources:
Systems Analysis and Design
 System Development Life Cycle System Development Life Cycle  SDLC Phases SDLC Phases Phase 1: Preliminary Investigation Phase 2: Feasibility Study.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Formulating a Simulation Project Proposal Chapter3.
Data flow & information requirements.  Establishing IPSO  Recording information about the existing system  Identifying the problems with the system.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
Pre kick off meeting 1 1 NCHRP_22_24 January Time Frame CM/E finalised the vehicle and test object modelling documents (Parts 2&3) –These documents.
The Software Development Process
The techniques involved in systems analysis Explanation of a feasibility study:Explanation of a feasibility study: –economic, –legal, –technical, –time.
Austroads Bridge Conference 2004 Hobart May 2004 Bridge Deck Behaviour Revisited Doug Jenkins Interactive Design Services.
Systems Development The Kingsway School. Systems Development This is carried out when a company is having a problem. They usually employ an ICT Consultant.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Software Configuration Management SEII-Lecture 21
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 12 Exploring Information System Development.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
MANAGEMENT INFORMATION SYSTEM
Systems Development Life Cycle
Sample Fit-Gap Kick-off
ISO/IEC
Fundamentals of Information Systems, Sixth Edition
FIMCAR Global Strategy
Software Configuration Management
Systems Analysis and Design
Manage Project Costs Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG504A.
Brain Initiative Informational Conference Call
Chapter 27 Change Management
Lecture 3 Change Management
Chapter 27 Change Management
CAE-SCRUB for Incorporating Static Analysis into Peer Reviews
Outcome TFCS-11// February Washington DC
Chapter 27 Change Management
CLINICAL INFORMATION SYSTEM
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
Systems Analysis and Design
Development of guidance Meeting of the IED Article 13 Forum subgroup
Chapter 27 Change Management
New Assessment & Test Methods
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
Chapter 27 Change Management
European Commission, DG Environment Air & Industrial Emissions Unit
Building Valid, Credible, and Appropriately Detailed Simulation Models
Neopay Practical Guides #2 PSD2 (Should I be worried?)
Systems Development Life Cycle
PSS verification and validation
An overview of course assessment
Presentation transcript:

Pre kick off meeting 1 1 NCHRP_22_24 January CME Activities 1.Define reporting procedures for simulations (data output, variables, etc) 2.Define an objective validation procedure for simulations 3.Define model requirements for test vehicles and road equipment 4.Define requirements for Analyst Competence / Quality Control

Pre kick off meeting 2 2 NCHRP_22_24 January CM/E Structure Currently the CM/E proposes a computational standard structure parallel to EN1317 –Part 1: Common Reference Information and Reporting –Part 2: Vehicle Models –Part 3: Test Article Models –Part 4: Validation Procedures –Part 5: Accreditation

Pre kick off meeting 3 3 NCHRP_22_24 January CM/E Strategy The implementation of Computational Mechanics in standardisation is anticipated in the following manner: –1) Documentation and validation of test vehicle models –2) Documentation and proof of performance of test article models –3) Validation of test article model against full scale experimental data –4) Simulation of test article for standardisation Possible implementation of CM/E into a modified products approcal process is demonstrated in the following slide – at least 2 reports would be submitted to a notified body with supporting references (to establish the model suitability) NOTE: This is only a proposal for using CM/E and is not an approved standard for its implementation

Pre kick off meeting 4 4 NCHRP_22_24 January CM/E Overview N O TI FI E D B O D Y Vehicle model Vehicle validation report Test Article validation report Simulation report Modification of products Test article model Test article Documentation Proof of computation quality Type Approval Library of Pre-Approved Models Analogous to Test Vehicle Original Product Crash Test Model Report of Original Product Modified Product Crash Test Unique Model for Each Modification

Pre kick off meeting 5 5 NCHRP_22_24 January Work Plan (1): Validation Procedures Objective validation procedures are in development Marco (PoliMi) has been investigating the Round Robin Data collected in ROBUST and is proposing some validation procedures for comparing test and simulation output –Further development of the validation procedures is moving slowly and no draft document is available yet.

Pre kick off meeting 6 6 NCHRP_22_24 January Work Plan (2): Vehicle Modelling A document is being submitted to TG1. It contains general state of the art procedures as well as “proof of suitability” checks. State of the art – basic modelling techniques are presented so that a computer model can be assessed in terms of its construction. This is informative only as it is difficult read an input file. Component “Validation” tests are presented as a method to demonstrate that a model has the basic requirements to be used in a full scale crash test. Basic vehicle manoeuvring and suspension loading are used to demonstrate model stability and proper function. –The document is currently oriented towards Finite Element models and uses LS-DYNA as a reference example. Some Multi- body dynamics information is also presented.

Pre kick off meeting 7 7 NCHRP_22_24 January Work Plan (3): Test Article Modelling A draft document has been submitted to TG1. It contains general state of the art procedures as well as “proof of suitability” checks. State of the art – a questionnaire of current modelling practice was distributed to members. Information on the modelling techniques, as well as the component tests used to validate the models, was collected. This is informative only as it is difficult read an input file and cannot be generalized for all test articles (barriers, terminals, etc). Test article model suitability is assessed through component tests and documentation of model components. Stress contour plots must be presented to identify if any unrealistic material performance is present.

Pre kick off meeting 8 8 NCHRP_22_24 January Work Plan (4): Reporting –The reporting procedure for computer simulations is dependent on the final documentation developed for the validation process. –The type of reporting structure will be determined by the final implementation procedure for CM (as presented earlier) –An example of the information necessary is presented in the following slide

Pre kick off meeting 9 9 NCHRP_22_24 January Validation Reporting Simulation institute Report number Client Test item - Detailed description of the full scale tested item - Description of the test item model Simulation software Post-processing software Test type Vehicle model Results Result requirements Result discussion

Pre kick off meeting NCHRP_22_24 January Work Plan (5): Analyst Accreditation –Accreditation is an open issue that still must be addressed by the group –There is nothing to report at this time.

Pre kick off meeting NCHRP_22_24 January Time Frame CM/E finalised the vehicle and test object modelling documents (Parts 2&3) –These documents should be revised at regular intervals Validation procedures still require research –Further analysis of the Round Robin data in ROBUST is a necessary input –Difficult to predict the delivery of a draft procedure – possibly 2007