Power Application Software UPDEA - Workshop. What are Power Application Tools? Name as many of the Power Application Tools as you can Power Application.

Slides:



Advertisements
Similar presentations
Use of Node-Breaker Model in POM Suite/ROSE Software
Advertisements

Arsalan A Rahim EED, UET Lahore. The Edit Mode is used to create a new case or to modify existing cases. In Edit Mode: Create a new case Create a.
Performance Testing - Kanwalpreet Singh.
Software Analysis Tools
January TSS J. Gronquist, S. Kincic
Marianna Vaiman, V&R Energy
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
and Trend for Smart Grid
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
System Strength Discussion
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Real-Time Transmission Congestion Management & Market Effects
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
NERC Lessons Learned Summary
 Network Management  Network Administrators Jobs  Reasons for using Network Management Systems  Analysing Network Data  Points that must be taken.
Supervisory Systems.
SCADA and Telemetry Presented By:.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
G650 Generator Protection & Control System
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Optimization for Operation of Power Systems with Performance Guarantee
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
Golden Valley Electric Assoc. Inc © 2012 GVEA. All rights reserved. GVEA BESS Expected and Actual Performance Dan Bishop Golden Valley Electric Assoc Fairbanks,
Peak RCCo Performance Metrics Draft –November 2013.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Gestionnaire du Réseau de Transport d 'Electricité 2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation Experiences and practices.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
FREQUENCY CONTROL AND AUTOMATIC GENERATION CONTROL
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
Managing Reliability and the Markets with PI
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Optimal Power Flow- Basic Requirements For Real Life Their Problems And Solutions.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
Dillon: CSE470: ANALYSIS1 Requirements l Specify functionality »model objects and resources »model behavior l Specify data interfaces »type, quantity,
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
Transmission Planning in ERCOT- Overview
PSCAD models.
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Economic Operation of Power Systems
ISO New England System R&D Needs
Presented by: LADWP November 14, 2017
Project WECC-0100 Update Load Modeling Task Force
DEC System Voltage Planning - June 2018
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Palo Verde-COI RAS Retirement
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

Power Application Software UPDEA - Workshop

What are Power Application Tools? Name as many of the Power Application Tools as you can Power Application Software (1) –State Estimator (SE) –Operator Load Flow (OLF) –Optimal Power Flow (OPF) –Contingency Analysis (CA) –Short Circuit Analysis (SCA) –Automatic Generation Control (AGC) –Historical Information System (HIS)

Power Application Tools (2) Power Application Software (2) –SCADA Topology Determination –Plausibility Check of Measurements –Power System Model Adaptation –Power System Security Analysis –Study Base Case Initialisation –Transient Stability Analysis (TSA) –Voltage Stability Analysis (VSA) –Available Transmission Capacity –Complete Model Estimator (CME) –Dynamic Security Assessment (DSA) –Dynamic Stability Analysis

PAS Applications The PAS subsystem consists of applications that support : –Real ‑ time and study mode network analysis –Determining the state of a power system network –Level of security, –How the security and economics of the network might be improved. The PAS applications run automatically using data originating from SCADA Study applications are run by the operator or planning engineers, to study the effects of changes in the power system. Study data can be initialized from a real ‑ time network solution, or from archive files.

PAS Tool Data flow Where do the Power Application tools get their data? What is data path from the substation to the PAS tools Live SCADA Data State Estimator Power Flow Contingency Analysis Short Circuit Analysis Power Application Software Network connectivity models RTU Host I/O

PAS Applications Control Staff Workstations HMI x SCADA Data Base AGC Alarm Processing Export to Dispatcher Training Simulator Export data to Corporate Users Fire Wall Rear Projection System Power Application Software State Estimator Power Flow SC Security Enhancement Voltage VAR Dispatch Voltage Security Transient Security CA Load Forecast Real Time SCADA What are the two primary sub tasks of the State Estimator?

Real ‑ Time Network State Estimation ‑ (RTNET) 1.Performs topology processing 2.Estimation the network state Includes busload forecast and transmission loss sensitivities calculation State Estimation

Instantaneous SCADA values Bus kV, Line MWs and MVAr limit values exceeded Estimated values based on Kirchoff’s and Ohm’s Laws State Estimator Avon 1 2 Mersy kV395 kV Z = 100 ohms 300 MW Loads at a bus = 0  Produce valid topology and real time network solutions for all network apps. More reliable and more accurate than raw SCADA When and how often will the State Estimator run?

State Estimation Runs on a periodic basis, i.e. Usually every 5 minutes Each time a switching device such as a breaker or isolator changes state 1.What is the output of a State Estimator run ? 2.What is the output used for?

State Estimation 1.RTNET produces an Estimated State of the power system based on SCADA measurements using a least squares fit algorithm. 2.Once RTNET has run to completion the following applications can run: –Power Flow (PWRFLOW) –Optimal Power Flow (OPF) –Contingency Analysis (RTCA) –Dynamic Stability Analysis (VSAT / TSAT) –Voltage VAR Dispatch (VVD) –Short Circuit Analysis (RTSCT) –Security Enhancement Analysis (SENH) 1.What is the purpose of Study Power Flow?

Power Flow Allows control staff and planners to study the steady-state operation of the power network under hypothetical and postulated conditions Study how the power flows through the network before taking lines out for maintenance and what - if future scenarios Generation Load Gen Load Avon 1 2 Mersy kV395 kV Z = 100 ohms 300 MW 0 300

Error Iterations Power Flow The solution is a MWs and Mvar balance of Load against Generation. MW Fixed Instantaneous System Load MVAr Load MVAr Load MW Solved System Generation Load MW Gen MW Gen Mvar Load Mvar 1.How do control staff make changes Study Power Flow? 2.How are the results of the study seen?

Changes to the network topology can be made by changing the status of circuit breakers on one-line diagrams or tabular displays. Results of Power Flow analysis can be displayed either on one-line diagrams or in tabular form. What PAS tool makes recommendations on how to optimise the grid?

Optimal Power Flow Optimal Power flow ‑ The primary purpose of optimal power is to provide control staff with network configuration recommendations that will eliminate or reduce violations and/or move the network to a more economical operating state. The primary function of OPF is to determine and present optimal, feasible device settings. These settings are calculated based on the network model, control model, objective function model, and operating limits. The presented control settings should correct (or, if not possible, reduce) any violations of operating limits and optimize the objective function while maintaining feasibility.

Contingency Analysis Contingency Analysis ‑ Assesses the impact of potential changes in the network, such as equipment outages, on the state of the power system. The application runs in the real time and study environments. Mersy Gen Load 1 Avon kV 397 kV 150 MW MW Load MW 160 MW 395 kV Rabbit Load MW Illovo 400 kV Line Outages Avon – Mersy1Mustrun Avon – MersyMustrun Mersy_RabbitMustrun Avon_IllovMustrun Illovo_ MersyMustrun 400 kV Load Outages Mersy Load 1Mustrun Rabbit Load 2Mustrun Rabbit Load 3Mustrun

Outage Scheduler Outage Scheduler – –The Outage Scheduler provides the capability to schedule equipment outages or derations. –The outage schedules are used by the study applications to study system conditions at a particular time, taking into account the necessary topological or rating changes.

Security Enhancement Security Enhancement ‑ –A set of optimization algorithms that recommend operator actions for moving the system to the most secure and efficient operating point given the specified constraints. It includes Constrained Dispatch, Contingency Planning, and Preventive Action. –The application runs in the real ‑ time and study environments.

Voltage ‑ Var Dispatch Voltage ‑ Var Dispatch – –Runs as part of the real ‑ time sequence. –Recommends reactive/voltage control changes to minimize MW losses, or to correct voltage violations.

Voltage ‑ Var Dispatch Voltage-Var Dispatch (VVD) is a real-time version of the study Optimal Power Flow application. It runs as part of the real-time network sequence, uses only reactive power and voltage controls, and is initialized from the results of the state estimator. If the state estimator found voltage violations, VVD will attempt to correct the violations with minimal reactive power control changes. If no voltage violations were found, then VVD will attempt to minimize MW losses using reactive power controls. Resulting control change recommendations are presented to the dispatcher as advisory recommendations.

Short Circuit Analysis Short Circuit Analysis – –Calculates short circuit currents that result from specified faults. –The Short Circuit analysis program requires a set of fault definitions in the FAULTS database before execution can begin.

Study Network Sequence Study Network Sequence ‑ –The Study Network Sequence is an integrated environment for in- depth studies. –It includes Economic Dispatch, Power Flow, Optimal Power Flow, and Contingency Analysis functions that can run in sequence. –The Study Network Sequence is initialized either from the real- time system, from other study mode functions, or from archive.

Online Dynamic Security VSAT – Voltage Security Assessment Tool TSAT – Transient Stability Assessment Tool

VSAT Purpose VSAT is a tool to assess power system voltage stability It allows the user to specify multiple scenarios on the network to analyze Inputs are power flow data, contingency definitions, security limits, transfer definitions. The outputs are MW transfer limits, critical contingencies, PV curves

VSAT Features Part of an automatic run sequence to cater for changing loads High speed analysis on a dedicated server Event driven such as change of system state (equipment failure, generator redispatch) Manual such as on instruction from an operator Transfer limit or base-case security analysis using the following criteria: – Voltage stability margin – Voltage decline – Reactive power reserves – Thermal overloads

TSAT Purpose TSAT is a tool to assess power system transient stability It allows full time-domain simulations of large, complex power systems Inputs –Powerflow data –Contingency definitions –Transfer definitions –Security criteria –Analysis and solution options Outputs –Transient stability index –Damping Index –Voltage duration index –Frequency duration index –Relay margin index

TSAT Features Quick screening of contingencies, in order to minimize number of contingencies to be analyzed in detail Security analysis using the following criteria: – Transient stability – Damping – Transient voltage – Transient frequency – Relay margins

VSAT and TSAT Uses Helping the operator in deciding whether or not to run a power station in Emergency Level 1 due to its impact on the transfer limit Deciding on the next worst contingency that could lead to a voltage collapse during an outage and the amount of load that must be shed to mitigate this after implementation of all remedial measures. Determining safe generation limits due to an outage of a line at a power station

State Estimator Problem On Load – caring MWs and Mvars Off Load – caring Mars only Problem: Due to the way in which the topology model is evaluated, the line was seen to be in service It was carrying Mvars only and thus deemed to be in service even though the breaker was open. Lesson – add logic that can differentiate between open lines and Mvar only states

Turbine Steam flow Normal speed is 50 revolutions a second (+/-) GEN Power sent to Transmission Auto/Man Set point High Low Control Plate Unit Control System Dead Bands Hz: – ACE : +/- 70 Spinning :1000 MW 10 minute: 500 MW Steam flow valve Principles of Automatic Generation Control TEMSE AGC HV yard ERTU CPU 12 v Memory Instantaneous Output & Hz readings Error = Desired - Instantaneous AGC ERTU CPU 12 v Memory New set point target sent to Generator

Questions