ILC MDI Andrei Seryi JAI with input from many colleagues working on MDI IWLC2010 20 -10 - 2010.

Slides:



Advertisements
Similar presentations
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Advertisements

Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
Global Design Effort BDS updates SLAC 1:30 Monday meeting Andrei Seryi November 5, 2007 Previous update – August 20, 2007.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
Proposed machine parameters Andrei Seryi July 23, 2010.
Global Design Effort Beam Delivery System design and EDR, Introduction Andrei Seryi, SLAC BDS Kick-Off meeting, October 11-13, 2007.
BDS at reduced beam parameters 2nd Baseline Assessment Workshop on Reduced Beam Parameter set Andrei Seryi John Adams Institute 19 January 2011.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Optimization of L(E) with SB2009 Andrei Seryi, for BDS and other working groups LCWS 2010 / ILC 2010 March 28, 2010.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
November 07, 2006 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Beam Delivery system design and plans Andrei Seryi SLAC on behalf of BDS design team ILC08 and LCWS08 17 November 2008 Illustration of beam dump with double.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Beam delivery and ATF2 Andrei Seryi SLAC October 1, 2008.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
Accelerator WG 5 summary Interaction region, ATF2 and MDI Deepa Angal-Kalinin, Lau Gatignon, Andrei Seryi, Rogelio Tomas IWLC
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
Beam Delivery System Summary Andrei Seryi LCWS 2010 / ILC 2010 March 30, 2010.
Near IR FF design including FD and longer L* issues
Introduction and Meeting Objectives
ILC Interaction Region and Machine Detector Interface
Beam Delivery update Andrei Seryi December 12, 2005
CLIC Study Aim Conceptual design report in 2010
CLIC-ILC BDS & MDI work.
CLIC Civil Engineering Update
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Radiation Physics requirements for the IR
Beam Delivery System Schedule at ILC2010
Extract from today’s talk given to DCB
Barry Barish Paris ICHEP 24-July-10
Summary of Washington DOE Review
Presentation transcript:

ILC MDI Andrei Seryi JAI with input from many colleagues working on MDI IWLC

ILC MDI, A. Seryi, Beam Delivery & MDI elements 14mr IR Final Focus E-spectrometer polarimeter Diagnostics Tune-up dump Beam Switch Yard Sacrificial collimators Extraction with downstream diagnostics grid: 100m*1m Main dump Muon wall Tune-up & emergency Extraction IR Integration Final Doublet 1TeV CM, single IR, two detectors, push-pull Collimation: , E Very forward region Beam-CAL Lumi-Cal Vertex

ILC MDI, A. Seryi, Final Doublet

ILC MDI, A. Seryi, IR orbit & beam manipulation

ILC MDI, A. Seryi, IR feedback & crab-xing

ILC MDI, A. Seryi, Interaction Region challenge (old location) Break point for push-pull disconnect Provide reliable collisions of 5nm-small beams, with acceptable level of background, and be able to rapidly and efficiently exchange ~10kT detectors in a push-pull operation several times per year

ILC MDI, A. Seryi, Push-pull history The push-pull arrangement of detectors is not a new idea; however, it was never realised in practice to the extent required for ILC in terms of reliability and efficiency For ILC, the push-pull arrangement was evaluated on the conceptual level in 2006, and while it has been determined that the technical issues have conceptual solutions, it was deemed that “careful R&D and engineering studies will be needed during the TDP time to validate and optimize the proposed configuration”, as stated in the GDE push-pull Configuration Change Request (CCR) to the ILC baseline approved in early 2007.

ILC MDI, A. Seryi, detector B may be accessible during run accessible during run Platform for electronic and services. Shielded. Moves with detector. Isolate vibrations. Starting point (~2006) push-pull concept “Power-Point Engineering” detector A

ILC MDI, A. Seryi, IRENG07 Workshop

ILC MDI, A. Seryi, WG-A: Overall detector design, assembly, detector moving, shielding. –Including detector design for on-surface assembly and underground assembly procedures. Beamline pacman & detector shielding… Conveners: Alain Herve (CERN), Tom Markiewicz (SLAC), Tomoyuki Sanuki (Tohoku Univ.), Yasuhiro Sugimoto (KEK) WG-B: IR magnets design and cryogenics system design. –Including cryo system, IR magnet engineering design, support, integration with IR, masks, Lumi & Beamcals, IR vacuum chamber... Conveners: Brett Parker (BNL), John Weisend (SLAC/NSF), Kiyosumi Tsuchiya (KEK) WG-C: Conventional construction of IR hall and external systems. –Including lifting equipment, electronics hut, cabling plant, services, shafts, caverns, movable shielding; solutions to meet alignment tolerances... Conveners: Vic Kuchler (FNAL), Atsushi Enomoto (KEK), John Osborne (CERN) WG-D: Accelerator and particle physics requirements. –Including collimation, shielding, RF, background, vibration and stability and other accelerator & detector physics requirements… Conveners: Deepa Angal-Kalinin (STFC), Nikolai Mokhov (FNAL), Mike Sullivan (SLAC), Hitoshi Yamamoto (Tohoku Univ.) WG-A, conveners meeting, July 5 WG-D, conveners meeting, July 11 WG-A, group meeting, July 12 WG-B, conveners meeting, July 13 WG-C, group meeting, July 17 WG-B, group meeting, July 23 WG-C, group meeting, July 24 WG-A, group meeting, July 30 WG-C, group meeting, July 31 WG-D, group meeting, August 1 WG-B, group meeting, August 2 WG-A, group meeting, August 6 WG-C, group meeting, August 7 WG-A, group meeting, August 13 WG-D, group meeting, August 15 WG-B, group meeting, August 16 WG-A, group meeting, August 20 WG-C, group meeting, August 21 WG-A, group meeting, August 27 WG-C, group meeting, August 28 Conveners and IPAC mtg, August 29 WG-B, group meeting, August 30 WG-B, group meeting, September 13 Work in preparation for IRENG07

ILC MDI, A. Seryi, Example of design progress to date, showing in particular the radiation shielding systems (so called “pacman”) SiDILD

ILC MDI, A. Seryi, CMS platform – proof of principle for ILC Detector motion system with or without an intermediate platform Two different approached for detector motion are considered: with and without a platform Example of design progress to date: how to move the detectors

ILC MDI, A. Seryi, Interrelation of technical challenges for the push-pull system

ILC MDI, A. Seryi, Illustrations of interrelations Iron in the muon system also provides: radiation shielding magnetic field shielding The shielding requirements may affect the detector mass  Affect its vibration stability, motion system, etc. Such relation opens possibility for cost-value optimization Iron in the muon system also provides: radiation shielding magnetic field shielding The shielding requirements may affect the detector mass  Affect its vibration stability, motion system, etc. Such relation opens possibility for cost-value optimization

ILC MDI, A. Seryi, Shielding the IR hall Detector is self shielded even for the case of full beam power lost at IP Real geometry, with cable and cryo penetrations is presently being studied Shielding the “4 th “ with walls Evaluation of a continuous loss of 18MW beam at s=-8m on a hypothetical thick target Pacman has Fe: 1.2m, Concrete: 2.5m

ILC MDI, A. Seryi, Detector stability analysis First analysis shows possibilities for further optimization –e.g. tolerance to fringe field => detector mass => resonance frequency Global FE Model SiD first vertical motion mode, Hz 1nm 100nm Plot shows the absolute motion. The relevant relative motion may be smaller (is being studied).

ILC MDI, A. Seryi, Illustrations of interrelations Differences of approaches for detector assembly lead to differences in segmentation and rigidity, resulting in different assumptions on requirements for a detector platform The motion system and IR hall design need to mitigate the challenges and maximise compatibility of detectors Differences of approaches for detector assembly lead to differences in segmentation and rigidity, resulting in different assumptions on requirements for a detector platform The motion system and IR hall design need to mitigate the challenges and maximise compatibility of detectors

ILC MDI, A. Seryi, Stability and detector motion system Vibration stability will be one of the major criteria in eventual selection of a motion system design Both detectors without platformsBoth detectors with platforms

ILC MDI, A. Seryi, IR hall design IR hall dimensions, strength of the floor, size of shafts and service alcoves depend on the detector assembly approach, its motion system, geology, depth, etc.

ILC MDI, A. Seryi, Illustrations of interrelations CLIC Final Doublet requires fraction of nm stability. A solution may be to lengthen the IP-FD distance (L*), placing FD on a stable floor. This may affect detector size, shielding, IR hall configuration, etc

ILC MDI, A. Seryi, Doubled L* concept for CLIC, aimed to ease reaching the ~0.1 nm stability requirement Discussed at CLIC08 L*

ILC MDI, A. Seryi, New concept of CLIC push-pull IR hall New concept brings the stable tunnel closer to FD, helping to achieve its better stability

ILC MDI, A. Seryi, A plan for enhanced engineering efforts on push-pull design has been developed by MDI team in early 2010 This plan requires additional engineering resources The ways to realize the plan are being now developed

ILC MDI, A. Seryi, Details of the plan The Push-pull plan defines the tasks that need to be performed to arrive to a robust design A possible distribution of tasks among the participants (present and future) has been developed Detailed plan with intermediate milestones will be developed taking into account available resources

ILC MDI, A. Seryi, Elements of the plan… 1.Design an IR hall for three distinct configurations: a.Deep site as at FNAL or CERN; b. Deep site with inclined access shafts as in Japan; c. Shallow site with open IR hall as in Dubna. 2.For the considered detectors, optimize the detector layout, sizes, and segmentation iterating on radiation, external magnetic field, mechanical resonances, and other requirements. 3.For the considered three versions of the IR hall location and layouts, determine the optimal detector assembly procedure. 4.Study detector and its motion system vibration and stability characteristics, in Finite Element Analysis and experimentally, reaching sufficient predicting capabilities of the analysis for the entire system performance. 5.Evaluate and specify the sets of radiation, fire safety, seismic and other safety rules applicable for the IR designs. 6.Design and prototype the Final Doublet and verify its stability with appropriate set of measurements.

ILC MDI, A. Seryi, …Elements of the plan 7.Design IR vacuum system allowing sufficiently quick disconnection and providing suitable, from the background point of view, vacuum level. 8.Design and prototype the intra-train feedback system, taking into account its possible interference with FD stability and radiation effects on its electronics. 9.Design and prototype the FD-surveying interferometer network. 10.Design the alignment systems for the Final Doublet, vertex, and internals of the detector, so that they are capable of working in unison. 11. Design suitable cryogenics system allowing flexible vibration-free connections to the Final Doublet. 12.Design an appropriate radiation shield, taking into account relevant radiation, seismic safety, and other rules.

ILC MDI, A. Seryi, Parameters SB 2009 parameter development (end 2009 – early 2010) –Optimization of cost / performance Central region integration Lower current with tighter & travelling focussing Same Luminosity at nominal energy Challenge at lower E due to reduced collision rate LCWS10 – discussion of the parameter set and tentative evaluation of double rep rate at low E –A solution to restore Luminosity at low E was found Mid 2010 – development of the new parameters and finalization of a tentative set BAW-2 – January 2011

ILC MDI, A. Seryi, New parameters based on the following assumptions Starting point: parameters developed by the Physics Questions Committee (B. Foster, A. Seryi, J. Clarke, M. Harrison, D. Schulte, T. Tauchi) in December Take into account progress on 10Hz rep rate for low E achieved after LCWS10 There are issues with DR duty cycle that are being studied, however assume that they will be solved Assume that we will develop and use new universal FD that gives additional luminosity improvement (only) for 200 and 250 GeV energies Consider the following energies: 200, 250, 350, 500 GeV CM Assume single stage bunch compressor (min sigma_z=230um – will use 300um and consider 230 as an overhead or safety margin) Assume 10Hz and 1300 bunches Consider separately the cases with and without Travelling Focus Energy and rep rate: E= GeV CM IP rep rate5555Hz Linac rate101055Hz ( double pulsing )

ILC MDI, A. Seryi, BAW-2 Themes Formally agreed parameter sets across energy range ILC-EDMS document ID

ILC MDI, A. Seryi,

ILC MDI, A. Seryi, Obvious Conclusions MDI aspects to focus on –Push-pull, Final Doublet, Parameters, … Essential to connect accelerator and detector physics and engineering Most efficient would be to have frequent (~bi- weekly) events for tracking and coordination