CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

January 6. January 7 January 8 January 9 January 10.
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Chubaka Producciones Presenta :.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
BE-CO work for the TS Nov 8 Nov 11P.Charrue - BE/CO - LBOC1.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CCC status report 14/12/2004D.Manglunki AB/OP 1 Status of the CERN Control Centre D. Manglunki AB/OP.
CERN IT Department CH-1211 Genève 23 Switzerland t Tier0 Status - 1 Tier0 Status Tony Cass LCG-LHCC Referees Meeting 18 th November 2008.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
R. Bailey, PS/SPS days, January 2005 Towards the CCC.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
2006 PS&SPS days Summary of key issues and Action Plan.
LEADE Meeting, February 6 th 2006 Highlights from the Chamonix Workshop Divonne, January 2006 D. Macina TS/LEA.
Marine Pace Technical Committee -12 Dec DRY RUNS COMMISSIONING & EARLY BEAM OPERATION STABLE OPERATION.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
D.Manglunki - AB/OP CCC Ergonomics D.Manglunki - AB/OP.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Console Status Erik Gottschalk. Status Network - installed, upgrade switch to add more “external” ports Wireless network - available, upgrade to improve.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
Access system LHC-SPS M. Gruwé and J. Ridewood OP days March 18 th 2008.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre AB/CO review D.Manglunki / AB-OP CERN Control Centre.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
(Access system for HWC)
ABT-EC EYETS Activities 2nd reports
Gantt Chart October November December Step One Step Two
R. Denz, A. Gomez Alonso, AT-MEL-PM
P. Charrue on behalf of AB/CO/IN
Installations, modifications, consolidation in 2005:
Olof Bärring LCG-LHCC Review, 22nd September 2008
The Control System For LHC Hardware Commissioning
James Ridewood BE-OP-SPS
2017/2018 – SAP/Kinder Calendar
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
McDonald’s Kalender 2009.
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP2 Outline Constraints and boundary limits Reminder of room and consoles layout Project status as of today Schedule/Resources for TI, PS complex, SPS, Cryogenics, LHC HWC Conclusions

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP3 Constraints and boundary limits Restart of existing accelerator chain and technical services TI operates 24/7 LEIR early February LHC sector test mid- November

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP4 Room layout: 4 similar but not identical islets ~50 19”screens for controls, local fixed displays, administration and access on outer tables 4 large 46” screens for general purpose fixed displays 3 19”screens for laptops and mail/web on central tables 19” cabinet for rackable HW (access, intercom, beam inhibits, radiation alarms …) 5 IP-touch phones 1 colour printer

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP5 Project status as of today TS works finished except: –Finishing paint (27/1) –Heating/AC (27/1?) –Blinds and lighting controls (20/1) –CCC Access control operational but administration needed (cards distribution + EDH authorizations) Picture January 16 th 2006Simulation December 3 rd 2004

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP6 Project status as of today (2) CO works: –Most hardware installed –Configuration in progress, TI islet will be delivered 19/1 –Other islets to follow; end January 27 th Video signals –Last HW delivery mid February –System operational end February Communications –All phones installed, operational –Server configuration started 13/1, finishing 27/1, tests start with TI 30/1 –SPS intercom February Fast analog signals –First HW batch delivered last week (11/1) –Observation of signals mid-April

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP7 Project status as of today (3) PS complex access –Configuration and test under way –Switch control from CSA on week-end February 4-5 (LEIR starts February 6 th !) –Radio protection alarms: Hardware being installed SPS Access –racks in 867 for configuration;move to CCC 20/1 –Test access control from CCC 2 nd fortnight March

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP8 Schedule/resources for TI CCC Cold checkout starts January 23 rd –Configure and test application programs –Configure and test room functions (lighting and blinds controls…) –Configure and test communications (30-31/1) –Additional 2 TI technicians 8 hours/day Move in from MCR on February 1 st –1 TI + 1 PS/PSB 24/7 until PS shifts start

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP9 Schedule/resources for PS complex CCC Cold checkout starts February 13 th –Configure and test application programs –Configure and test communications –2 PS/PSB technicians 8 hours/day –Until PS/PSB shifts start, access given by PSB technician on TI shift PS magnet tests start 20/2 PSB/PS closed 6/3 –PSB HW tests –Additional 2 PS/PSB tech 8 hours/day PS shifts start 20/3 –3 tech on shift 24/7 –Only 1 TI tech

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP10 Schedule/resources for SPS CCC Cold checkout starts March 6 th –Configure and test communications –Configure and test application programs –Test access control Give access only during working hours –2 SPS technicians 8 hours/day SPS shifts start 3/4 for HW tests –2 tech on shift 24/7 Request of SPS OP in February –for TI8/CNGS tests!

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP11 Schedule/resources for Cryogenics CCC Cold checkout starts March 6 th in parallel with operations/tests from local control rooms –Configure and test application programs –Configure and test communications –1 AT/ACR technician + 1 AB/CO 8 hours/day First operation from CCC expected in June

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP12 Schedule/resources for LHC HWC CCC Cold checkout starts September 4 th –Test access control –Configure and test application programs –Configure and test communications –3 LHC OP or EiC, 16 hours/day HWC gradually moves from FCR to CCC in October/November Sector test from CCC end November

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP13 Overall schedule January – April 2006

CCC Commissioning PS-SPS DAYS 18/1/ 2006D. Manglunki, AB/OP14 Conclusion Good collaboration needed between all parts (AB/OP, AB/CO, TS/CSE, TS/EL, TS/CV, AT/ACR, TS/HDO, IT/CS…) for validation of CCC functionalities So far so good, February 1 st is still the delivery date: 14 days to go!