Status reports M. Antonelli ISR and f decay simulation S. Dell’AgnelloDC geometry review P. de SimoneDC s-t relations with new sag model A. AntonelliDC.

Slides:



Advertisements
Similar presentations
Status reports: Production environment Trigger simulationM. Palutan, B. Sciascia EmC responseS. Miscetti Background selectionS. Miscetti, M. Moulson DC.
Advertisements

Status reports/Discussion items S. DellAgnello DC geometry review DC wire sag measurements P. de SimoneDC s-t relations with new sag model S. Miscetti.
John Pietras 16 October 2008 Berlin Tracking Data Cross Support Transfer Service Status.
Status reports Trigger simulationM. Palutan, B. Sciascia DC GeometryA. Antonelli, S. Dell’Agnello DC wire sag measurementS. Dell’Agnello, C. Forti DC s-t.
“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”
KLOE GM Capri May 2003 K charged status report DE/Dx development vs PiD (next talk by E.De Lucia) →K e3 studies: initial design of efficiency measurement.
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Wing Attack - Plan R or How I learned to stop worrying and love the Monte Carlo 06/06/06.
Offline Status Report M. Moulson, 20 December 2001 Summary presentation for KLOE General Meeting Outline: Processing of 2001 data History of datarec executable.
Status report on EMC simulation... Part 3 The plan is to:  SURVEY the existing situation over the runs - Validation of plots using  and.
Measurement of the absolute BR(K  +  -  + ) : an update Patrizia de Simone KLOE Kaon meeting – 21 May 2009.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s M. Palutan et al.Trigger simulation parameters S. GiovannellaGEANFI.
Offline Code for Next Beam Test Jianchun Wang 08/06/01.
Introduction to Single-Top Single-Top Cross Section Measurements at ATLAS Patrick Ryan (Michigan State University) The measurement.
Notes on offline data handling M. Moulson Frascati, 29 March 2006.
KLOE Offline Status Report Data Reconstruction MonteCarlo updates MonteCarlo production Computing Farm C.Bloise – May 28th 2003.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Realistic, large-scale MC production M. Moulson, 20 December 2002 Summary presentation for KLOE General Meeting Outline: Production proposal Refinements.
Chapter Five Advanced File Processing. 2 Objectives Use the pipe operator to redirect the output of one command to another command Use the grep command.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Time of Flight Analysis Progress on TOF Software Frank Geurts for the TOF group.
MC/Offline Planning M. Moulson Frascati, 21 March 2005 MC status Reconstruction coverage and data quality Running time estimates MC & reprocessing production.
KLOE Computing Update Paolo Santangelo INFN LNF KLOE General Meeting University of Rome 2, Tor Vergata 2002, December
Status report from T2K-SK group Task list of this group discussion about NEUT Kaneyuki, Walter, Konaka We have just started the discussion.
Progress on BR(K L  p + p - ) using a double-tag method A. Antonelli, M. Antonelli, M. Dreucci, M. Moulson CP working group meeting, 25 Feb 2003.
STATUS OF KLOE F. Bossi Capri, May KLOE SHUTDOWN ACTIVITIES  New interaction region  QCAL upgrades  New computing resources  Monte Carlo.
DST status Ready for production Analysis of sample ksl DST’s in progress for ~1 week ksl DST event size: 2.8 MB/nb GB for 200 pb -1 Other streams.
K  group activities K + K - retracking features New vs Old : resolution future planning. Conclusion and outlook K + K - retracking features New vs Old.
V.Patera – KLOE GM – Otranto – 10 June 2002 K  reconstruction status K + K - retracking features New vs Old : resolution New vs Old : efficiencies Conclusion.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
1 Calorimeter in G4MICE Berkeley 10 Feb 2005 Rikard Sandström Geneva University.
What is in my contribution area Nick Sinev, University of Oregon.
Status of the KLOE experiment M. Moulson, for the KLOE collaboration LNF Scientific Committee 23 May 2002 Data taking in 2001 and 2002 Hardware and startup.
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
Status of K S   e analysis C. GattiT. Spadaro Selection on data Selection on MC Efficiencies from data, K L   e, K S    ,      , bhabha.
The KLOE computing environment Nuclear Science Symposium Portland, Oregon, USA 20 October 2003 M. Moulson – INFN/Frascati for the KLOE Collaboration.
Dead or alive ??!! … Erika & Patrizia …. … this story begins when … … we were trying to produce the KMP dst’s for 2004 data … reproduce the List oh the.
Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires.
Offline meeting  Status of MC/Datarec  Priorities for the future LNF, Sep
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
Barbara Sciascia July,29 th - LNF 1 Barbara Sciascia K  semileptonic decays Charged Kaon Meeting July, 29 th - LNF Single photon efficiency in KPM events.
Status report of the KLOE offline G. Venanzoni – LNF LNF Scientific Committee Frascati, 9 November 2004.
Status of the hadronic cross section (small angle) Federico Nguyen February 22 nd 2005  the 2002 data sample and available MC sets  trigger efficiency.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s.
Status of vertex efficiency evaluation Fabio Ambrosino, Patrizia de Simone, Paolo Massarotti, Vincenzo Patera the idea is to look for events where the.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Offline Status Review M. Moulson, P. Valente, for the Offline Group 16 March 2001 Outline: Status update FILFO: new developments (G. Finocchiaro) Questions.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
GlueX Software Status + Framework Development David Lawrence JLab September 19, /19/081Software Status -- David Lawrence, JLab.
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
Status report on analysis of BR(K S  p + p - p 0 ) A. Antonelli, M. Moulson, Second KLOE Physics Workshop, Otranto, June 2002.
1 Reminder: Why reprocess? data Reconstruction: DBV DSTs: DBV data DBV-19 for reconstruction & DSTs, Run < DBV-20 for.
Data vs MC … issues of the K +- group 1.Accidentals … contribution from Erika & Roberto 2.DC background.
M. Brooks, 28-Mar-02 Heavy/Light meeting 1 Muon Analysis Work Getting Code ready for first data pass - DONE Get ready for second pass on DSTs - muon identification.
Paolo Massarotti Kaon meeting March 2007  ±  X    X  Time measurement use neutral vertex only in order to obtain a completely independent.
DST data structures: Status report M. Moulson, CP working group 25 October 2001.
KLOE general meeting December 2002 Tor Vergata K charged status report DST production status New analysis items:  K + K - cross section/  line.
M. Martemianov, ITEP, October 2003 Analysis of ratio BR(K     0 )/BR(K    ) M. Martemianov V. Kulikov Motivation Selection and cuts Trigger efficiency.
Status Report on Data Reconstruction May 2002 C.Bloise Results of the study of the reconstructed events in year 2001 Data Reprocessing in Y2002 DST production.
Status of the measurement of K L lifetime - Data sample (old): ~ 440 pb -1 ( ) - MC sample: ~125 pb -1 ( mk0 stream ) Selection: standard tag (|
Calorimeter Status Electronics Installation and Commissioning
Update on the false-dead DC wire problem
KLOE offline & computing: Status report
Migration of reconstruction and analysis software to C++
MC ’04-’05 objectives                                                       
Large scale MC production II
Offline Report Outline: Status update DST Proposal P. de Simone
Global PID MICE CM43 29/10/15 Celeste Pidcott University of Warwick
Installing the HI 6600 into the CompactLogix System.
KLOE General Meeting - LNF March,
Presentation transcript:

Status reports M. Antonelli ISR and f decay simulation S. Dell’AgnelloDC geometry review P. de SimoneDC s-t relations with new sag model A. AntonelliDC response validation S. MiscettiEmC response validation M. MoulsonBank-reduction code for DST’s S. MiscettiBackground insertion for DST’s F. BossiTrigger simulation parameters S. GiovannellaGEANFI on IBM C. BloiseOther MC tuning I. SfiligoiDB modifications for DST’s

MC DST’s: A/C path If an identified K L tag, recalculate t 0 and re-run NVR code: talk kloe_drop DROP VNVO 0 DROP KNVO 0 DROP INVO 0 talk eclsfilt sel kltag yes ret ret use/path=1 kbkmdd emcdbini dcdbini eclsfilt kloe_drop t0_find/par=2 clufixtim/par=2 eclmod/par=2 filter/path=1 eclsfilt on Compress banks (all events, including unclassified events and K L tags) use/path=2 mc_dst clu2trig track_dst trig_dst output select event/path=(1,2) Zip output (level 4) Specify bank list output select drop output select kept

MC DST’s: banks currently dropped Bank drop is handled with output select drop **** Partial list of banks not retained in MC DST’s: TriggerTCOE TMON TELE TPIE PZZA TCAF TPAS EmC recon.MCEL CELE CWRK CPPS CPLS DC recon.MDTC DTCE DHRE DPRS DHSP DCHD DCHN MC run init.PART MATE TMED MC truthDHIT CHIT DTKA DTHA QIHI Additionally, all lower-case MC banks compressed with sqzlib

MC DST’s: banks currently present Headers, etc.LRID HEAD EVCL BRIN RUNG MC truthKINE VERT t 0 -relatedT0MC T0GL TriggerTDST CTRG EmC recon.CLPS CLLS CSPS EmC truthCFHI CEKA CEKE QCALQCAE QWRK QCKA DC recon. DTFS DVFS DC truthMDKI MDTF MDCN TCATCLO Event class.ECLS ECLO VNVO INVO KNVO

MC DST banks: general considerations Code for creating new MC DST banks in MCT library New offline library, fully incoroporated in KLOE setup Also contains background insertion module Not worthwhile to move existing code (preserve CVS tags) Banks defined in standard KLOE style with header files and descriptions in $K_IMCT Bank structures must accommodate presence of background hits Existing code in TLS (PROD2NTU) must work out of the box

MC DST summary banks for tracking MKIN: MC details for KINE tracks One bank per charged KINE track, 20 words: Number of DHIT hits and layers x, p at first and last DHIT hits Path length and TOF MDTF: MC truth for DTFS tracks One bank per DTFS track, 28 words: Indices of 3 main KINE contributors Number of hits and number consecutive hits contributed by each Index of KINE at first DTFS hit; layer, x, p for first hit Index of KINE at last DTFS hit; layer, x, p for last hit PROD2NTU routines to be modified: getdhitval, tfmctrue, tfmchit, mainkineintrk, getfirstlastdhit

MC DST banks for tracking MDKI name changed (was MKIN), format revised Added innermost/outermost layer, number of layer crossings MDTF format revised Added Layer, x, p for first hit from major KINE contributor Layer, x, p for last hit from major KINE contributor MDCN (MC DC hit count summary bank, new) Substitutes DCNH for MC DST’s Separate counters for: Small/big cells Generated/background hits DHIT hits, DHRE hits, hits used by PR, hits used by TF

MC DST banks for trigger Format of TDST bank same for MC/data DST’s: Torta wordL1 type (EmC/DC/both) LET/Cosmic multiplicities E/B/W Cosmic veto T1C time T1D time T2D time Injection clockNot filled in MC DST’s FiducialNot filled in MC DST’s Number of L2 DC hits Other routines modified: tskt to extract trigger times into (modified) TCOE gettrigger to fill PROD2NTU block

MC DST banks for EmC MC information for EmC relatively compact as is Only need to discuss whether to keep/drop CHIT CEKE bank created as possible alternative Composition and weight of KINE contributions to elements clusters DC banks give similar composition for tracks Address/NoteCEKACELE CELE #1Number of KINE contributors Total energy of KINE contributors KINE contrib #1Energy contrib by KINE #1 KINE contrib #2Energy contrib by KINE #2 …… CELE #2Number of KINE contributors Total energy of KINE contributors

MC DST’s: status and size estimate Output size estimate: 1000 K S  all, K L  all events Generated and reconstructed on AIX w/ standard path.mcr23.9 MB (i.e., KB/evt).dst4.1 MB Very close to a final figure, to compare with 6 KB/evt pessimistically estimated last time 500 pb -1 = 500 M evts  2 TB Variations: Standard w/CHIT instead of CEKE4.7 MB (KB/evt) Standard + QIHI4.4 MB Standard + QIHI and CEKE  CHIT4.9 MB