TRACI V3 Status and material for discussion Feb 6 th 2014.

Slides:



Advertisements
Similar presentations
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
Advertisements

WETSIDE DESIGN © Copyright 2008 HVAC Design Solutions1 Essential Design Programs with Accurate Sizing Calculations help to “Streamline Your Design” Essential.
Project Control Techniques
CS 5150 Software Engineering
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
NH GFOA Annual Conference 5/7/ This presentation is intended for informational purposes only, and is not a substitute for seeking professional.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
P. Tropea for the PH-DT CO 2 team CO 2 CERN 11 March 2015 CO 2 cooling activities in PH-DT.
Save time and money by purchasing a remanufactured pump. Quality and performance delivered from Ampco pumps.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Transmission Oil Pump Audit Test Stand Project Overview.
Automated OUTLAY REPORT. The is an Excel spreadsheet which is used to track all funds related to the project, from beginning to end.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Bart Verlaat 2 nd October 2013 Development of a portable CO 2 cooling system for CO 2 R&D in HEP.
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
1 Engineering Design - A general approach. 2 Outline Form a group Proposal (Presentation and 1 st Mandatory Meeting) Milestone A (Demo A and 2 nd Mandatory.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
INDIANA STATE LIBRARY 2010 LSTA Grants The Project Budget Worksheet.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Worldwide Protein Data Bank Common D&A Project Sequence Processing Modular Demo May 6, 2010 Project Deliverable.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
A two-stage system for the future cooling system.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Buy A&M Requisitions Training TARLETON STATE UNIVERSITY.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
CMS LEWA LDE1/M500 CO 2 pumps N° N°
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
S A Griffiths CM42 June 2015 Electrical & Control.
Chris Booth Sheffield 29th March 2006
Relocation Services and Equipment Modification Services
Buy A&M Requisitions Training Version 14 Upgrade
Systems Analysis and Design
Pixel upgrade CO2 cooling plants – 3D modelling
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
CEDAR Detector Ventilation System Review
Brainstorming on how to best proceed with LESS
PHASE I AND PHASE II PROCESSES
Agenda Introductions ModernBiz Technical Series changes
Estimating Capital Costs
CO2 Cooling IPNL Nick Lumb, 28/01/09.
PHASE I AND PHASE II PROCESSES
East Hall under construction
Presentation transcript:

TRACI V3 Status and material for discussion Feb 6 th 2014

Model of the main “pressure” part completed by Milano for the version with the “large” HNPM pump Annular gear pump HNPM mzr hs Flexible transfer line to the “local box” Connections to the chiller via the HEX

-pdf drwaings: TRACI_V3_DRAWINGS_(INFN-MILANO) -stp model: TRACI_PRESSURE_PARTS_REVO.stp Drawings and model from Milano available at: Technical content already checked. Now verifying part list and item naming in order to 1)Match the list of components to be ordered 2)Allow for production in a workshop Drawings and model of the “local box” (connection to the experiment) expected ~now. Drawings and model of the Frame/Foam box immediately after (Time? 1-2 weeks? Carlo?) Updated model of the electrical cabinet can come later (mainly for records)

UNITS TO BE PRODUCED: 1) As per present model, with HNPM mzr hs pump 2) Modified version with SMALLER HNPM pump (mzr-7255-hs) 3) Modified version with volumetric 2-stage pump VA MODULAR 01/2S from M-Pumps 4) Modified version with remote head membrane pump from LEWA + dumper 1)Ready for construction as soon as the model of the “local box” is completed 2)Minimal modification: the pump has the same kind of interface, but it’s just much smaller: lengthen the right/left connections and modify the support flange 3)Moderate modifications: one of the connection pipes must “exit the plane” + the pump support must be modified 4)Non-negligible modifications: find space and support for the pump body on the top part of TRACI (beside the electrical cabinet) + modify the circuitry to host the damper on top of the remote head

COSTS Present best estimate of hardware excluding pumps (see excel file) 100W/Shared%20Documents/Forms/AllItems.aspx?RootFolder=%2fCO2%2d 100W%2fShared%20Documents%2fParts&FolderCTID=0x B E CD71D22EB4151 ~ 20 kEUR (hydraulic + mechanic + electrical/control) COST OF PUMPS -HNPM mzr hs -> 17 kEUR !!! -HNPM mzr-7255-hs -> 7 kEUR -M-Pumps VA MODULAR 01/2S -> 3-4 kEUR (depending on options) -Lewa LDB-1 M910S/Ø17 -> 7-8 kEUR (remote head to be exactly quoted)

PROPOSAL OF SHARING: 1)CERN/NIKHEF have previously purchased all components for a full assembly (something has been used elsewhere) and NIKHEF has residual funds to purchase the 17 kEUR HNP pump and is willing to start IMMEDIATELY the assembly of the first unit with it in the frame of the agreed AIDA deliverables. The first electrical cabinet is ready at CERN. This unit would then be shared between NIKHEF and CERN and would be used to pre-commission the controls for all the units 2)The cost of the pumps for the three other units is equally shared between the different unit owners, i.e. : Milano; Oxford; Sheffield+Liverpool 7+4+8=19 kEUR / 3 = 6.3 kEUR each 3)This cost has to be added to the cost of the remaining hardware of each unit, i.e. 20 kEUR. Bringing the investment requested from every partner to 26 kEUR (or ~21 kGBP) 4)Order for the big expensive pump through CERN/NIKHEF 5)Order for the three other pumps equally shared on 3 “unit owner” budget codes via CERN IMMEDIATELY (6-8 weeks delivery time for all – including M-pumps) 6)Order for the hardware of the three units in the same way as soon as things are ready -> Chillers: ready to order Electrical/ control components: almost ready to order (minor mods for versions) Mechanics/frames/foam: as soon as drawings and part list ready Hydraulics: as soon as drawings and part list ready

OPEN POINTS: Funds: are all existing? Pledged? Available? When can they be spent? Small modifications on model and drawings for V.2 and V.3: is Milano available? Large modifications on model and drawings for V.4: is Oxford available (Bart as consultant) Production of mechanics/hydraulics for V.2 and V.3: is Sheffield available? Production of mechanics/hydraulics for V.4: Oxford or Sheffield? ATTENTION: for V.2, V.3 and V.4 there is quite some knowledge cumulated about the pump performances: before making the final choices and launching the order, please make up your mind about the level of performance you expect from your TRACI: Flow rate? Temperature? Pressure drop on the circuit?