ILC Trigger & DAQ Issues - 1 ILC DAQ issues ILC DAQ issues By P. Le Dû

Slides:



Advertisements
Similar presentations
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
Advertisements

Sander Klous on behalf of the ATLAS Collaboration Real-Time May /5/20101.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
27 th June 2008Johannes Albrecht, BEACH 2008 Johannes Albrecht Physikalisches Institut Universität Heidelberg on behalf of the LHCb Collaboration The LHCb.
ACAT 2002, Moscow June 24-28thJ. Hernández. DESY-Zeuthen1 Offline Mass Data Processing using Online Computing Resources at HERA-B José Hernández DESY-Zeuthen.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
E. Pasqualucci Software needed (H8) DAQ-1 –BE installed ROD emulator Beam crate readout process Crate controller and message system –Inherited by tile-cal.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
5 Feb 2002Alternative Ideas for the CALICE Backend System 1 Alternative Ideas for the CALICE Back-End System Matthew Warren and Gordon Crone University.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Data Acquisition for an LC Detector Report from the extended ECFA/DESY LC Workshops Cornell, Jul. 15 th.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: “DOM MB to Event Builder”
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Data Acquisition for the ILC G. Eckerlin DESY LCD Group meeting, SLAC, Jan 27 th 2005 Outline Conditions.
DAQ Issues for the 12 GeV Upgrade CODA 3. A Modest Proposal…  Replace aging technologies  Run Control  Tcl-Based DAQ components  mSQL  Hall D Requirements.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
Snowmass P. Le Dû Next generation of Trigger/DAQ Where are we today? Evolution On/off line boundaries What next ? LC’s Triggers.
David Bailey University of Manchester. Overview Aim to develop a generic system –Maximise use of off-the-shelf commercial components Reduce as far as.
6-10 Oct 2002GREX 2002, Pisa D. Verkindt, LAPP 1 Virgo Data Acquisition D. Verkindt, LAPP DAQ Purpose DAQ Architecture Data Acquisition examples Connection.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Data Acquisition Issues at the International Linear Collider Front End Readout Issues ● Large channel counts require low power consumption power cycling.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
LCWS05 Stanford - P. Le Dû 1 What next  Snowmass Menu Basic parameters and constraints Detector concepts Front end electronics and read out issues Data.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
2003 Conference for Computing in High Energy and Nuclear Physics La Jolla, California Giovanna Lehmann - CERN EP/ATD The DataFlow of the ATLAS Trigger.
LHCb DAQ system LHCb SFC review Nov. 26 th 2004 Niko Neufeld, CERN.
CHEP March 2003 Sarah Wheeler 1 Supervision of the ATLAS High Level Triggers Sarah Wheeler on behalf of the ATLAS Trigger/DAQ High Level Trigger.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
Niko Neufeld, CERN/PH. Online data filtering and processing (quasi-) realtime data reduction for high-rate detectors High bandwidth networking for data.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
Data Acquisition, Trigger and Control
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
ATLAS TDAQ RoI Builder and the Level 2 Supervisor system R. E. Blair, J. Dawson, G. Drake, W. Haberichter, J. Schlereth, M. Abolins, Y. Ermoline, B. G.
Kostas KORDAS INFN – Frascati 10th Topical Seminar on Innovative Particle & Radiation Detectors (IPRD06) Siena, 1-5 Oct The ATLAS Data Acquisition.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
EPS 2007 Alexander Oh, CERN 1 The DAQ and Run Control of CMS EPS 2007, Manchester Alexander Oh, CERN, PH-CMD On behalf of the CMS-CMD Group.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
MPD Data Acquisition System: Architecture and Solutions
LHC experiments Requirements and Concepts ALICE
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
TELL1 A common data acquisition board for LHCb
Electronics Issues & challenges for future linear colliders
DAQ upgrades at SLHC S. Cittolin CERN/CMS, 22/03/07
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Toward a costing model What next? Technology decision n Schedule
VELO readout On detector electronics Off detector electronics to DAQ
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
Example of DAQ Trigger issues for the SoLID experiment
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
John Harvey CERN EP/LBC July 24, 2001
LHCb Trigger, Online and related Electronics
The CMS Tracking Readout and Front End Driver Testing
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

ILC Trigger & DAQ Issues - 1 ILC DAQ issues ILC DAQ issues By P. Le Dû

ILC Trigger & DAQ Issues - 2 Trigger concept  No hardware trigger ! Software Trigger concept  No hardware trigger ! Sub-Detectors FE Read-out Signal processing – digitization, no trigger interrupt Sparcification,cluster finding and/or data compression Buffering Sub-Detectors FE Read-out Signal processing – digitization, no trigger interrupt Sparcification,cluster finding and/or data compression Buffering Data Collection is triggered by every train crossing Trigger :Software Event Selection using partial information of a complete train (equivalent to L1) Select ‘Bunches Of Interest’ Event classification according to physics, calibration & machine needs (HLT) Data Collection is triggered by every train crossing Trigger :Software Event Selection using partial information of a complete train (equivalent to L1) Select ‘Bunches Of Interest’ Event classification according to physics, calibration & machine needs (HLT) Monitoring & on-line processing S1S2S3S4Sn 1 ms 200 ms Few sec Data streams Read-Out Buffer Network Detector Front End Processor Farm(s) Storage 3000 Hz Few Hz 1 MBytes Average event size Data Flow up to 1 ms active pipeline (full train) Dead time free

ILC Trigger & DAQ Issues - 3 ILC DAQ conceptual (GLD) Architecture VFD VTX ECAL TPC HCAL MUON PPPPPPPPPPPPPPPP Data Steams Logger and Mass Storage Event building Network Gbit/sec Processor farm (one bunch train per processor) Event manager & Control Detector Buffering (per bunch train in Mbytes/BT = 140 MB/s) Links Select Bunch Of Interest (200 Hz) SiT Machine 1 G2.6 M5 M5K4568 K12K9215K 10k 5MB1MB 110 MB 20 MB3 MB1 MB 1GB/s = 100 PB/year

ILC Trigger & DAQ Issues - 4. About systems boundaries …..moving due to !  evolution of technologies,sociology ….. Subdetectors FE Read Out Signal processing Local FE Buffer Machine Synchronization Detector feedback Beam BT adjustment Data Collection (ex on-line) Bunch Train data collection from Buffer RO Bunch Of Interest selection SW trigger & algorithms Event Building Control - supervisor On line Processing Global calibration,monitoring and physics Local (temporary) Data logging (Disks) Full Integration of Machine DAQ In the data collection system NEW ! Global Detector Network (worlwide) Detector Integration Remote Control Rooms (3?) –Running modes Local stand alone Test Global RUN –Remote shifts Slow control Detector Monitoring Physics & data analysis (ex On- Off line) –Farms –GRID … Final Data storage Read out Node Partitionning (physical and logical) Read out Node Partitionning (physical and logical) Uniform interface

ILC Trigger & DAQ Issues - 5 Cosmic trigger ????? –Very useful during installation and debugging –Compatibility with power cycling ???? Clock, machine synchronization and timing distribution – with experts from LHC ! (Ph. Farthouat) Somes Issues To be discussed in specific meetings

ILC Trigger & DAQ Issues - 6 Current view of a uniform RO architecture Preampli Shaper Digitizer VTX CCD MAPS DEPFET ….. TRK Si TPC ECAL Si W Scint W HCAL Digital Analog Muon RPC Scint … VFD Sensor technology FPGA Receiver Digital Processing MUX RO Buffer Local Data Management GDNGDN Local/Global Controls & Services Partition Running mode (Stand alone, test, RUN) Synchronization & machine interface Databases : Calibration & Monitoring …… Integration To be studied! On detector Very Front End Local Signal Processing and buffer Common/uniform Interface Front End (On / Near detector) Commercial standardDedicated ASIC and/or SOC* Read Out Node/Hub *System On Chip Global Detector Network

ILC Trigger & DAQ Issues - 7 ILC ‘today’ Data Collection Network model Run Control Monitoring Histograms Event Display DCS Databases... Analysis Farm Mass storage Data logging Config Manager  Local/ worldwide Remote (GDN) Synchro NO On line – Off line boundary Local/Global Network(s) Wordlwide! Machine Bx BT feedback Local partition Data collection Sw triggers Sub Detector Read-Out Node FPGA receiver Buffer FPGA receiver Buffer FPGA receiver Buffer Proc receiver Buffer Data link(s)Services Networking Hub On/Near Detector Front End FPGA Direct network accessFrom Detectors Trigger Farms & Analysis Controls &Storage servers EVENT BUILDER NETWORK Multi Terabit/s

ILC Trigger & DAQ Issues - 8 Trigger & Event Analysis COMPUTING MODEL Sec. Temporary storage Monitoring Calibration Alignements Physics monitoring “Gold Platted“ events Physics samples Bunch Train Processing (ex L1) Database “Garbage” Final storage Candidates Storage Calibration Constants Sub-Detector performance “Analysis” farm Sample Prescale Compress Fast Analysis Stream Physics streams 200 ms Hours Days Year S1 S2 Sn Bunch Of Interest & classification Simple signatures : e/g, µ, taus,Jet Detector matching Complex signatures : PFA Missing Et, scalar Et Invariant and transverse mass separation … vertices, primary and displaced Selection: Thresholding Prescaling “Intelligent formatting “ Bunch train Software Trigger (equivalent to L1) using fast and/or simple information at the bunch level Machine Infos Event Classification (HLT) ON LINE OFF LINE 200 Hz

ILC Trigger & DAQ Issues - 9 Computing and communication trends 1000Gbit/I N 2 10Mbit/I N Gbit/IN 2 Mass storage Bandwidth

ILC Trigger & DAQ Issues - 10 Read Out evolution LHC --> ILC Subdetector Read Out Crate (VME 9U) Read Out Driver Read Out Buffer (3 ROBin) ROS (150 PCs) Gbit Link to Gbe Switch (60 PCs) 92 SLink Subdetector 400 Robin (PCI) AMC ATCA Module ATCA Crate Digital Buffer  C  CTA

ILC Trigger & DAQ Issues - 11 What next Common work with Machine CTRL group –ATCA – GAN –(Slow) Controls Look for EUDET 2 ???? Workplans – ATCA experience – Global (Test beam) Detector networking Between DESY/CERN,FNAL/SLAC,KEK ????