MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.

Slides:



Advertisements
Similar presentations
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael.
Advertisements

Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
© THALES NEDERLAND B.V. AND/OR ITS SUPPLIERS THIS INFORMATION CARRIER CONTAINS PROPRIETARY INFORMATION WHICH SHALL NOT BE USED, REPRODUCED OR DISCLOSED.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
Author Name Page 1 CNES’07 Peer Review 4/17/02 CNES’07 Mars Premier Peer Review Rendezvous and Sample Capture OS Beacon Electronics And Power System Mark.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Stuart D. BaleFIELDS iCDR – Science Requirements Solar Probe Plus FIELDS Instrument CDR Science and Instrument Overview Science Requirements Stuart D.
THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
Monaural Input Channel An in-depth look at a single channel on the Mixing Console in the Main Stage.
Single Ended Measuring Modes of ELQ 30A To learn more click on the selected topic! ELEKTR NIKA Receiving Modes Impulse Noise Measurement Spectrum Analyzer.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
Copyright 2005 International EMC Standards Activity 1 EMC International Standards Update CISPR SC A and I Activity Don Heirman Don HEIRMAN Consultants.
NON-IONIZING RADIATION MEASUREMENTS IN VOJVODINA Istvan Bikit, Dusan Mrda,Nebojsa Krstic, Nikola Jovancevic, Mile Ugarcina, Slavko Todorovic Department.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
DO Rev B & SVDO Arnab Chakrabarti, Vikram Gupta, Tao Chen 1/12/2016QUALCOMM Confidential and Proprietary1.
Jun 4, SPP FIELDS Updated block diagrams Fault Tolerant Design.
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley.
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
V f λ.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
THEMIS SRR Mission Requirements - 1 UCB July MISSION REQUIREMENTS Ellen R. Taylor Mission Systems Engineer Space Science Laboratory University.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Single Ended Measuring Modes of ELQ 30A+
Solar Probe Plus – FIELDS Main Electronics Package
Entrance to EMI.
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Solar Probe Plus – FIELDS Main Electronics Package
THEMIS MISSION PRE-SHIP REVIEW
FIELDS SCM Thermal iPER
THEMIS Mission Confirmation Readiness
THEMIS MISSION PRE-SHIP REVIEW
Introduction of energy, including underwater noise, is at levels that do not adversely affect the marine environment Mark Tasker for TG11.
Radio Astronomy Spectrum Management in practice – Australia (ATNF)
Manual Measuring Modes of ELA 10
Manual Measuring Modes of ELA 10
Presentation transcript:

MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley

MPEREMC 2 UCB, June 23, 2006 Probe 2 EMC Test Results Launch Site Requirements Test in Launch configuration with instruments off RE02, RS03 per THEMIS ICD with Boeing Self Compatibility Requirement Test in plugs-out configuration with instruments on RE02, RE04, RS03 per THEMIS Environmental Spec Limit RE02 to science sensitivity band, 20Hz-1MHz, plus the probe receiver band GHz Limit RS03 to probe transmitter band. Also power up transmitter to verify self-compatibility. Test passed – see JPL test report Test report reviewed and approved by KSC

MPEREMC 3 UCB, June 23, 2006 Probe 2 EMC Test Results Launch Configuration RE02 Test Results Well below spec udBV/m Dominated by EGSE Tallest peak ~56dBuV/m – see next page Below spec at special frequencies: MHz, ~30dBuV/m, spec = 38dBuV/m – 5.693GHz, ~54dBuV/m, spec = 95dBuV/m

MPEREMC 4 UCB, June 23, 2006 Probe 2 EMC Test Results

MPEREMC 5 UCB, June 23, 2006 Probe 2 EMC Test Results Launch Configuration RS03 Test Results (20-40V/m) The only sensitivity was the IRU, which saw significant fluctuations at 80MHz, 160MHz, 300MHz, 900MHz, and 1.108GHz (see next page) At 1.108GHz found that IRU response returned to nominal at 7V/m. IRU functionality is not important on the launch pad. Further, these frequencies do not correspond to any known frequencies at the Cape JPL equipment could not test above 18GHz (spec was to 40GHz). 18GHz agreed to by KSC. Post test functional showed no performance degradation in any system

MPEREMC 6 UCB, June 23, 2006 Probe 2 EMC Test Results IRU RS03 sensitivity:

MPEREMC 7 UCB, June 23, 2006 Probe 2 EMC Test Results Operational Mode (plugs out) RE02 test: 20Hz-1MHz test indistinguishable from facility background Facility significantly above spec line below 100Hz, as expected (below 14KHz measurement did not have a hard requirement) Receive band ( GHz) did not show anything above the test equipment noise floor, which was below the THEMIS receiver sensitivity level. Self compatibility tests indicate no problems in the probe receiver

MPEREMC 8 UCB, June 23, 2006 Probe 2 EMC Test Results Operational Mode RE02 test

MPEREMC 9 UCB, June 23, 2006 Probe 2 EMC Test Results Operational Mode (plugs out) RE04 test: See exceedances at harmonics of 60Hz, etc. see same exceedances in ambient measurement Between chamber background peaks, easily meet THEMIS requirements, even at 0.5m from the probe.

MPEREMC 10 UCB, June 23, 2006 Probe 2 EMC Test Results

MPEREMC 11 UCB, June 23, 2006 Probe 2 EMC Test Results Operational Mode (plugs out) RS03 test: Only interested in probe transmit band. See no effect from either the probe transmitter or from an external source at 30V/m

MPEREMC 12 UCB, June 23, 2006 THEMIS PROBE MISSION PRE-ENVIRONMENTAL REVIEW EMC/POWER Peter Berg University of California - Berkeley

MPEREMC 13 UCB, June 23, 2006 EMC/BATTERY/SOLAR ARRAY CONDUCTED EMISSIONS TEST BATTERY TRENDING SOLAR ARRAY TEST

MPEREMC 14 UCB, June 23, 2006 Conducted CM Common Mode Conducted Emissions Through Umbilical

MPEREMC 15 UCB, June 23, 2006 EMC SNIFF

MPEREMC 16 UCB, June 23, 2006 Sample EMC Sniff Probes 1- 5 BAU + IDPU + FGM + EFI + SCM + SST + ESA at J321 ESA HARNESS TO ESA

MPEREMC 17 UCB, June 23, 2006 Battery Trending Probe12345 Δ V Starting at 32 Volts, 850 mA was drawn from each battery for one hour.

MPEREMC 18 UCB, June 23, 2006 SOLAR ARRAY TEST A pair of 500 Watt Halogen Lamps was Placed orthogonally centered to each of the four flanking solar arrays at approximately 2 feet. The increase in solar array current from ambient light by string in mA was noted, and averaged below.