February 17-18, 2010 R&D ERL Bob Lambiase R&D ERL Power Supplies Bob Lambiase February 17-18, 2010 Power Supplies.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
HA Power Supplies - Demonstration Criteria and Status February 23, ATF2 Project HA Power Supplies Demonstration System Evaluation Criteria And Status.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
ICS – Software Engineering Group 1 SNS Power Supply Control Sheng Peng.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supplies & Electrical Utilities George Ganetis, Electrical Engineering Group Leader Power Supplies & Electrical Utilities.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
LCLS Injector Power Supplies July 28, LCLS Injector Power Supplies for Purchase Paul Bellomo, Antonio de Lira, Dave Mac Nair.
EMMA Electrical Engineering July 06 EE & PS Group EE & PS Group – EMMA 06
Power Supply Controller Architecture
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Digital Interface for MCOR’s Stan Cohen Albuquerque, NM From the June 9, 2005 presentation by Dr. Stan Cohen - notes on slides 11 and 12 added.
Announcements For lectures 8 to 10 please be reading Chapter 3
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Modular Inverter.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
EBIS ARR Andrew McNerney May 4-7, 2010 Hazards and Controls for Electrical, Control, Instrumentation and Conventional Systems.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Control Group April 26, 2006 Progress of Control System Presented by C.H. Wang Control Group Accelerator Center of IHEP IMAC, April
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
Complex Circuits Notes Series Circuit + Parallel Circuit = Complex Circuit.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
September 19-20, 2007 R. Lambiase Power Supplies Bob Lambiase September 19-20, 2007 DOE Annual Review.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
1 BROOKHAVEN SCIENCE ASSOCIATES ASAC Meeting NSLS-II Project July , 2008 G. Ganetis Power Supplies & Electrical Utilities ASAC Meeting National Synchrotron.
LCLS Sector 21 - BC1 Power Supply Design September 15, LCLS Sector 21 and BC1 Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
Decay Solenoid – what do we have to do to make it work?
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
October, 2009 Magnet Electrical Systems Bob Lambiase October, 2009 Internal Review.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Bob Lambiase May 21, The purpose of eRHIC is to have the capability to collide heavy ions with leptons, such as electrons and polarized electrons.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
The power supply for magnetic elements at CR D.Senkov IWAPT 2015, BINP, Novosibirsk The power supply for magnetic elements at CR D. Senkov/
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
KEK ATF2 High Availability DC Magnet Power Supplies Phase 2 Progress and Specifications 31 May 2006 Paul Bellomo, Antonio de Lira, Briant Lam and Dave.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
Powering The RHIC EBIS at BNL (And a few words on other new projects within the Collider –Accelerator Dept.) Bob Lambiase 16 June 2019.
ELENA installation progress F. Butin / ELENA collaboration.
S A Griffiths CM42 June 2015 Electrical & Control.
CR Dipole Magnets Power converter concept
Electrical & Control.
Block Diagram Transmitter Receiver × 2 Transmitter Power Supply ADC
CLEX* Status and Plans CTF3 complex CLEX
ATF2 Magnet Power Supplies
The ELENA BPM System. Status and Plans.
Burst Test Test-Bed LHC120A-10V 4 Quadrant Converter: Burst Tests
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
Page Headline Splitters.
Yannick Dietrich François Bouvet SOLEIL
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Power Supply Control for BEPCII
ST800 Service Tester, 800 Amps.
Presentation transcript:

February 17-18, 2010 R&D ERL Bob Lambiase R&D ERL Power Supplies Bob Lambiase February 17-18, 2010 Power Supplies

February 17-18, 2010 R&D ERL Bob Lambiase Magnet Power Supply Overview 2 All of the magnet power supply requirements for ERL can be satisfied by five different models. The capsule specifications and quantities are shown in the table below. Model Voltage, Volts Current, Amps Precision, ppm Quantity UD320A35V, IE Power Shim Amplifier 892, Danfysik BOP 50-20GL, Kepco MCOR12 / 2A, BiRa MCOR12 / 6A, BiRa With the exception of the UD320A35V unit, all models are bipolar, even though not all loads require bipolar operation. But, by using standard off-the-shelf units, development costs were minimized. The total AC power requirements for all of these units are estimated at 13.2 KVA of 480 VAC, 3 phase and 25.3 KVA of 208 VAC, 3 phase.

February 17-18, 2010 R&D ERL Bob Lambiase Main Dipole and Magnet String Supplies 3 Powers all six main dipoles in series. IE Power UD320A35V Rated I = 320 Amps, Rated V = 35 Volts, Precision = 100 ppm, Qty 1. Control is by standard BNL Power Supply Interface and Power Supply Controller (PSI /PSC) connected by fiber optic cables Shown as left cabinet in photo. Main Dipole Power Supply Powers series strings of solenoids or chicane dipoles. Kepco BOP 50-20GL Rated I = 20 Amps, Rated V = 50 Volts, Precision = 100 ppm, Qty 5. Control is digital via RS-232 All five units shown installed into right cabinet in photo. Magnet String Supplies

February 17-18, 2010 R&D ERL Bob Lambiase Shim Power Supplies 4 Powers all 23 main quadrupoles individually, as well as individual small dipoles and solenoids. Danfysik Shim Amplifier 892 Rated I = 10 Amps, Rated V = 15 Volts, Precision = 100 ppm, Qty 34. Six regulators packaged in each 19 inch rack, along with a common bulk supply. There are three racks per cabinet. The two cabinets with 36 regulators is shown in the photo on the right. Control is digital via RS-485 A single controller, shown below, is capable of manually controlling up to 256 regulators.

February 17-18, 2010 R&D ERL Bob Lambiase Back Leg and Corrector Power Supplies 5 Powers the six main dipole back leg windings individually. These are used as horizontal correction elements. BiRa MCOR12 / 6A Rated I = 6 Amps, Rated V = 25 Volts, Precision = 1000 ppm, Qty 6. Analog control via VME DAC / ADC All six units, in one rack, shown installed into right cabinet in photo. Back Leg Power Supply Powers all corrector windings individually. BiRa MCOR12 / 2A Rated I = 2 Amps, Rated V = 25 Volts, Precision = 1000 ppm, Qty 32. Analog control via VME DAC / ADC All 32 units, in two racks, shown installed into left cabinet in photo. Corrector Power Supplies

February 17-18, 2010 R&D ERL Bob Lambiase Equipment Layout 6 Three standard 30” deep cabinets house the Danfysik Shim PSs and the Kepco BOPs. One 30”cabinet is available as a spare. Two 23” racks are used for the BiRa correctors and dipole back leg windings. They are located very close to the Power Supply Controls cabinet. Power Supply Controls are housed in a cabinet next to the vacuum system cabinets.

February 17-18, 2010 R&D ERL Bob Lambiase Construction and Commissioning 7 All of the magnet power supplies have been delivered, and are nearly fully installed mechanically. Work will continue with installing cables for AC power to the equipment, DC cables from the equipment to the magnets, and control cables from the control system to the power supplies. This work should be completed by June Construction Status All of the power supplies have been tested at the factory, and there are no technical complexities to commissioning these supplies. The control interface design will be tested prior to the actual magnet loads being connected and the final system testing will proceed as the magnet loads are connected. Commissioning Plans