Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Energynetworks.org 1 PRESENTED BY MARÍA ISABEL LIENDO, SCOTTISH POWER, ON BEHALF OF WORKSTREAM 2 Cost and Benefit allocation to DG under the CDCM 11 December.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 05 April | Energy Networks Association - DCMF.
1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 3 December | Energy Networks.
EDCM update Mo Sukumaran (on behalf of CMG)
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 14 June | Energy Networks.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Update from DCMF MIG Simon Yeo Chair – DCMF MIG 01 December | Energy Networks Association - DCMF.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
DCUSA Change Proposals Elizabeth Lawlor DCUSA Panel Secretary 15 February | Energy Networks Association - DCMF.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Mod Proposal Prevention of "Timing Out" of Authority decisions on Modification Proposals Nick Reeves.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 02 February | Energy Networks Association - DCMF.
Structure of Charges: Update and next steps DCMF 10 September 2008.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Demand Side Management Andy Pace 6 October | Energy Networks Association - DCMF.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Customer Charge On behalf of all DNs 19 November 2010.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
CMG and Workstream Update
Review of UNC Section Q “Emergencies”
Document 2.2: ESS group structure working under the ITDG and the DIME
Generation Dominated Areas(GDA)
David Rogerson, ITU Expert
Mod 0621 Amendments to Gas Transmission Charging Regime
Gas Customer Forum 28 July 2008
Presentation transcript:

Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009

2 EHV charging Four options for EHV charges for 2010: Current DRM-type model for all EHV customers Current DRM-type model for EHV demand customers and average CDCM charges for generation Use CDCM end-to-end (for all customers) Use longer-term EHV charging method

3 Option 1 - Current model for all EHV customers Pros: No modification proposal other than CDCM needed (? – see comments) Potentially less price disturbances for EHV customers Cons: Two methodologies (and models) co-existing for one year, confusing to customers Existing models treat DG allowed revenue as a separate “pot”, no clear way of incorporating the decision of one revenue pot Comments: Price disturbances are expected in 2010 regardless, DPCR5 settlement Would a modification still be needed to “integrate” the CDCM and the exiting methodology? A modification proposal could still be needed to deal with the DG issue

4 Option 2 - Current model for EHV demand and CDCM for generation Pros: Potentially less price disturbances for EHV demand customers Able to deal with DG customers and merged pots of allowed revenue Cons: Two methodologies (and models) co-existing for one year, confusing to customers Two modifications needed. One (EHV) governed by the existing SC13 and one (HV/LV) governed by the new SC50 – how does this work? Comments: Price disturbances are expected in 2010 regardless, DPCR5 settlement

5 Option 3 - CDCM end-to-end Pros: Only one methodology applied, consistency Able to deal with DG customers and merged pots of allowed revenue Cons: There could be price disturbances to EHV customers Comments: Governance is not clear for a scenario of one modification proposal being governed by two standard conditions Ofgem has indicated to DNOs that they will need a “clear justification for two step changes” If moving to a “nodal” locational approach from 2011, frequent disturbances might be common

6 Option 4 - Use longer-term EHV charging method Ofgem’s LRIC guidance has been published Not the case for FCP, but March decision document mentioned a version” of FCP to be implemented – this does not exist yet This option is unlikely to be realistic by 2010