THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Program Schedule and Status Stewart Harris.

Slides:



Advertisements
Similar presentations
Councillor Egli Ward 9 Knoxdale- Merivale June 5, 2014.
Advertisements

THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 GROUND MAGNETOMETER GBO DESIGN.
Special Programs Presentation Nano-Satellite Program Exploring Frugal Engineering in India Living Lab in the Communities.
Superconducting Spoke Resonator Cavities and Cryomodules
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) All Sky Imager Design Stewart Harris - UCB.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Engineering Peer Review Oct. 17, 2003 Data Retrieval and Software.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
THEMIS/GBO Engineering Peer Review CTR - 1 UCB, Oct 17, 2003 GBO/EPO Magnetometers: Overview C. T. Russell.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Magnetometer David Pierce UCLA.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
Control Software Integration German Schumacher T&S Software Lead.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
( ELR) - 1 STEREO - Solar Terrestrial Relations Observatory Mission STEREO SWG STEREO OBSERVATORY Status Edward Reynolds APL STEREO Project Manager.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 GBO Deployment Plans and Status Canada Sites Mike Greffen THEMIS Canada Site Operations.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Alaska Ground Based Observatories (with E/PO involvement) GBO Peer Review April 27, 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
LIGO-G D LIGO R&D1 Advanced LIGO R&D Review The PSL Peter King & Rich Abbott October 8, 2002.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
VENµS MISSION STATUS VENµS users meeting – Jan 2010 Pierric FERRIER, CNES.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
Work Breakdown Schedule. Components Research and find all components  Pressure Sensor  Micro controller  LED Display  Operational Amplifier Order.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
THEMIS/GBO 1 Banff, March 29, 2006 Agenda – GBO Review.
Focusing Lens for PXIE SSR1 Cryomodule Summer 2012 Status 7/10/2012I. Terechkine1.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Based Observatories (GBO) MCDR Stewart Harris.
THEMIS/GBO Review 1 Banff, March 29, 2006 Ground Based Observatories (GBO) System Design Overview Operational Status Lessons Learned S. E. Harris University.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
THEMIS/GBO Site Tour 1 January 2006 Ground Based Observatories (GBO) Tour of Current Sites (Jan ‘06) Stewart Harris.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Status of ATF Fast Kicker Experiment
Dec
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Aerospace Engineers Power Point by: Blaise Shack.
Ground Based Observatories (GBO) All Sky Imager Design Stewart Harris - UCB _101220_ATHA.
THEMIS/GBO KickOff 1 UCB, June 2, 2003 Ground Based Observatories (GBO)
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Engineering Peer Review Oct. 17, 2003 Field Site Deployment/Operations.
全面推开营业税改征 增值税试点政策培训. 什么是营改增? “营改增”中的“营”指的是营业税,“ 增”指的是增值税。对大多数企业来说,增 值税所带来的税负远低于营业税。 减税本身就是积极的财政政策。营改增所 实现的减税,不仅规模大、范围广,它本质 上是一种“结构性减税”,从而构成“结构 性改革”攻坚战中的实招。
Fall 2006P7305: Freshman Practicum AM Receiver P7305: Learning Module for EE Freshman Practicum Chris Urban: Lead Engineer Hans-Christian Rotmann: Project.
Cryoplant Controls Installation
“Estimated” Corn Field Drying
Jan 2016 Solar Lunar Data.
SPF MAG Quarterly Report – Feb 2015
LDF “Highlights,” May-October 2017 (1)
Average Monthly Temperature and Rainfall
ECAL electronics schedule
Software Development Process
2K Cold Box Cost, Schedule & FDR Summary
2017 Jan Sun Mon Tue Wed Thu Fri Sat


Jan Sun Mon Tue Wed Thu Fri Sat

Globus-M2 will be constructed by the end of 2015
Presentation transcript:

THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Program Schedule and Status Stewart Harris

THEMIS/GBO Engineering Peer Review 2 UCB, Oct. 17, 2003 Test Philosophy Lab testing where necessary and possible For instance, testing of temperature limits on cameras Cold limit testing on commercial components Get in the field early and often Establish network of GBOs well before satellites launched Prototype to be deployed this winter 5 Units deployed in winter ’04-05 Additional 15 Units deployed in winter ’05-06

THEMIS/GBO Engineering Peer Review 3 UCB, Oct. 17, 2003 Schedule

THEMIS/GBO Engineering Peer Review 4 UCB, Oct. 17, 2003 Status GBO Procurement ASI Cameras / Lenses on order, due 4-6 weeks Prototype Deployment Currently scheduled Jan ’04 Enclosure (ASI and CE) fabrication, est. delivery ~ late Dec. System integration, est. completion ~ early Feb. Pushes deployment into late Feb. Open Issues Computer selection Sun shield design USB cable length extender testing