Richard Catherall EN-STI CERN, 1 st February 2012 ISOLDE Technical Report for the INTC.

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Radioactive Ion Beam (RIB) Production at ISOLDE by the Laser Ion Source and Trap (LIST) Sven Richter for the LIST-, RILIS- and ISOLDE IS456 Collaborations.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 An EBIS-based RHIC Preinjector - Test EBIS Results Ed Beebe Preinjector Group Collider-Accelerator.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
Nuclear physics: the ISOLDE facility
Richard Catherall EN-STI CERN, 6 th July 2011 ISOLDE Technical Report for the ISCC.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
28/01/2013 Gerrit Jan Focker, BE/BI/PM 1 Isolde SGIU Beam Instrumentation Remarks on status and possible development.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Technical Report for the ISCC Meeting 23 rd June 2010 Richard Catherall EN-STI-RBS.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the INTC.
Nuclear physics: the ISOLDE facility Magdalena Kowalska CERN, PH-Dept. on behalf of the CERN ISOLDE team Lecture 2:
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the ISCC.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Technical Report for the ISCC Meeting 23 rd June 2010 Richard Catherall EN-STI-RBS.
Update on the PSB Cooling and Ventilation Systems
ISOLDE Technical Report for the ISCC
Richard Catherall EN-STI 2nd February 2011
Technical Report for the ISCC Meeting 23rd June 2010
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
AD consolidation activities in LS2
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Technical Report for ISOLDE
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
RF operation of REX-ISOLDE
How to run ions in the future?
ISOLDE Technical report for INTC 21/5/2007
Technical Report ISCC Meeting 16th February 2009
Magdalena Kowalska, CERN PH-SME-IS
Technical report for ISOLDE INTC 19 May 2007
Technical Report for ISOLDE
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

Richard Catherall EN-STI CERN, 1 st February 2012 ISOLDE Technical Report for the INTC

Agenda Targets REX RILIS Shutdown work 2011/2012 Water cooling Access INCA Timing Safety

Targets A third target nanomaterial (SiC, Y 2 O 3, CaO) for ISOLDE 35 Ar from CaO469-VD7 for Proprietary CERN technology J. Nucl. Mat. 416, 99 (2011) Yields on 31,32 Ar measured by ISOLDE experiment IS476 – H. Fynbo and B. Blank. Turrion, M.; Urszula, H.-I. ISOLDE Yield Database. (accessed December 1st, 2011) TRIUMF. ISAC Yield Measurement. (accessed December 5th, 2011) GANIL. SPIRAL Beams. (accessed December 5th, 2011) Ions per second 31 Ar (15.1ms) 32 Ar (98ms) 33 Ar (174.1ms) 34 Ar (844ms) 35 Ar (1.78s) ISOLDE6.3E+013.6E+032.0E+052.6E+063.0E+08 TRIUMF--7.0E+022.9E+046.5E+06 T. Stora

1. Addition of FC readout channels  Avoid having to move cables between XL65 and XL20 line when reading out Miniball and beta-NMR FCs - XEBS.FC20: new FC installed at the same location as EBIS.BO10 - XL65.FC100: new PAM for the Miniball FC - XL20. FC100: new PAM for the beta-NMR FC 2. REX controls upgrade Discussion about an upgrade of a number REX controls items have started. Four work packages identified. WP1: PLC/RS422 Controlled Power-supplies WP2: REX magnetic field regulation WP3: REX Linac RF Controls WP4: REX EBIS pulsed power-converters Work to be carried out between now and end of LS1 REX improvements 3. Increased performance of the new REXTRAP RF excitation (e.g. reduced loading time) F. Wenander

REX consolidation and improvements Linac cooling water Several trips during 2011 Flow can be reduced on the BTY line magnets -> Install flow regulators (gain ~7 m3/h) Vacuum upgrade in RFQ section (high losses with highly charged ions) New Hi-pace pump installed in front of RFQ Renovation of DB2 (this shutdown) Enable 2 ms RF pulse length on all amplifiers for slow extraction (this shutdown) Max rep rate: 50 Hz without 9-gap / Hz with 9-gap Need reduced power for the 9-gap -> lower max energy D. Voulot

9-gap amplifier upgrade Upgrade of 9-gap amplifier to ensure stable operation during the period Replace final stage tube, 130 kW, 2 ms pulse length Estimated cost 300 k€ Commissioning early 2014 D. Voulot, H. Broere

New IrCe cathode Modified Wehnelt electrode Courtesy of T. Berg TwinEBIS testbench Project 2. Detect low-intensity stable beam contamination using an MCP * Install the equipment (2 dedicated MCPs and vacuum chamber) * Set up electronics for particle counting of low-energetic (30-60 keV) ions * Evaluate the setup, i.e. test efficiencies, counting rates etc * Estimated time 3 months Contact persons: F. Wenander, M. Kowalska and B. Marsh Call for support by external students Project 1. Setup the TwinEBIS testbench a. Finalize design and installation of mechanical parts, 6 months b. Re-commission superconducting solenoid c. Produce a control system for power supplies, current readouts, vacuum control system, interlocks. Labview experience, 6-9 months d. Commission the source, test alternative cathode and gun types, increase electron beam current and energy. Electron beam simulations. >12 months Experienced student(s) Contact person: F. Wenander

8 BeamSmGaMgAtPbDyNdPrAgTlCdMnNiYbZn Planned Real RILIS operation  2756 h – Total  2527 h – On-line > 50 % of the Total running time of ISOLDE facility Laser ON time in 2011: Ion beams of 15 elements were produced V. Fedosseev, B. Marsh

9 New ion beam - Astatine May 2011 (b, c) : 6 ionization schemes were compared up to 150 pA of 205 At was obtained August 2011(d) : A series of Rydberg states observed At ionization potential measured precisely ISOLDE RILIS development Dye laser scan, At-205 ion current measured with a Faraday cap

Shutdown Work Beam instrumentation Exchange of double scanner unit in HRS separator zone Displacement of PAM’s externally to HRS separator zone. Migration of PLC software for PAM’s Grids and FNBS to IEPLC standard General maintenance Electricity, ventilation, robots, water, vacuum, laser window exchange….etc Controls applications Upgrade of various applications TIMBER traceability on-going Front End maintenance Faraday cage pistons to be replaced with “nuclearized” pistons & new cabling New HT cable to be pulled through HT transfer tube Target ramping cards Installation of controlled current reduction cards (ramping cards) for GPS & HRS target & EBIS cathode power supplies

Water cooling system Modifications of the existing target cooling system Refilling of reservoir with “clean” demineralized water from another circuit. Previous filled from target station closed circuit Diversion of water drainage Modification of controls to implement a delay before switching to reservoir Independent pressure regulation of GPS and HRS water circuits Tests on cavity cooling using 27C water cooling New HIE-ISOLDE specs for cooling tower. May need a water cooling sub-station?

Access to ISOLDE Following report by RP on the evaluation of the shielding at ISOLDE EDMS Fencing to be put up before start up. Turnstile will be moved to new sas in E. Siesling

IN jector C ontrol A based protocol System INCA Application server Control room workstation Working setKnob Specific applications CMW (middleware) FEC (Front End Computer) FESA server Real Time tasks 3-tier Architecture Advantages: Better performance thanks to centralised computing Settings history logged in DB Better scalability Better security INCA deployments status: PSB & LINAC 2 PS LEIR & LINAC 3 SPS ISOLDE 2012 Why at Isolde? Control system uniformity within the accelerators complex More flexibility and customization capabilities E.Piselli (BE-OP-PSB)

Timing Signals Renovation T. Giles, P. Fernier

General Safety ISOLDE Primary area inspection by the French and Swiss authorities  Few minor remarks Web based safety course will be requested to get the access rights of the primary area A-P Bernardes

Safety Supervised area Existing Building 170 Date to be discuss with RP (D < 6mSv/year) Controlled area Supervised area  Controlled area: -No more VCT (Short term visitor) -Medical certificate mandatory to get the dosimeter -No visitor allowed (only technical visits) A-P Bernardes

Thank You To the ISOLDE team and all the supporting groups …and for your attention