FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
PANDA FAIR Guenther RosnerNuPECC, Prague, Nuclear Structure & Astrophysics (Rare-isotope beams) Nuclear Structure & Astrophysics (Rare-isotope beams) QCD-Phase Diagram (HI beams 2 to 45 GeV/u) QCD-Phase Diagram (HI beams 2 to 45 GeV/u) Hadron Physics (Stored and cooled anti-protons) Hadron Physics (Stored and cooled anti-protons) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Materials Science & Radiation Biology (Ion & antiproton beams) Materials Science & Radiation Biology (Ion & antiproton beams) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Accelerator Physics
Parallel Operation Guenther RosnerNuPECC, Prague,
Experiments Guenther RosnerNuPECC, Prague, NuSTAR PANDA APPA CBM
Guenther RosnerNuPECC, Prague,
Hadron Spectrocopy Guenther RosnerNuPECC, Prague, FAIR
Phases of Strongly Interacting Matter Guenther RosnerNuPECC, Prague, LHC FAIR
Staging Guenther RosnerNuPECC, Prague, Start Version Phase A (SIS100) Phase B (SIS300) Modularised Start Version Module 0Module 1Module 2Module 3Module 4Module 5 SIS100Exp. halls for CBM & APPA Super-FRS for NuSTAR Antiproton Facility for PANDA & options for NuSTAR LEB, NESR, FLAIR for NuSTAR or APPA RESR for PANDA, NuSTAR & APPA
Modularised Start Version Guenther RosnerNuPECC, Prague, APPA CBM/HADES NuSTAR PANDA Experiments M1: APPA M1: CBM/HADES M2: NuSTAR M3: PANDA M0 M1 M2 M3
MSV Timelines Guenther RosnerNuPECC, Prague, Submission of pre-planning documents to HBM Clarification of user requirements Modularised Start Version (MSV) Start revised pre-planning for MSV Expected approval of revised planning for MSV Preparation of documents for building permit Expected approval for (partial) building permit Start site preparation (clearing trees) Award contracts on civil construction work lot 1-4 Completion of civil construction work lot 1-4 Start installation of accelerators and detectors
MSV Costs Guenther RosnerNuPECC, Prague, Total accelerator and personnel Modules M€ Total civil construction Modules M€ FAIR contribution to MSV experiments costs*78 M€ FAIR GmbH personnel and running costs47 M€ Grand Total Modules M€ in 2005 € * Total MSV experiments costs ca. 170 M€ in 2011 €
Funding of FAIR Modules 0-3 Guenther RosnerNuPECC, Prague, Spain expected to join soon (11.87 M€) China and UK will contribute to experiments (6.6 M€)
FAIR Organigram Guenther RosnerNuPECC, Prague, Council Managing Directors B. Sharkov (Chairman), S. Richter Directors‘ Office Council Matters Office Legal Advisor 3 rd Party Funding Officer Technical Division Director: D. Kraemer Project Office Acc. Liaison Technical Follow-up In-kind Coordination Research Division Director: G. Rosner Exp. Coordination APPA CBM NuSTAR PANDA Site & Buildings Division (D. Kraemer, G. Rosner) Administrative Division Director: S. Richter Controlling & Resource Planning Finances
FAIR MSV Experiments APPA SPARC HEDgeHOBWDMBIOMAT CBMNuSTAR LEB Super- FRS HISPEC/ DESPEC MATSLASPECR3BR3BILIMA PANDA Guenther RosnerNuPECC, Prague,
Timelines Experiments Finish R&D phase2011 – Deliver prototypes of all essential parts Submit complete sets of TDRs2011 – Take decisions on alternative technical solutions Co-ordinate with2011 – Civil construction requirements – Accelerator setup schedule Identify critical pathways2011 – Milestones, timelines, deliverables Submit risk management plan2011 Secure funding2011/12 Negotiate MoU with FAIR2011/12 (Europe-wide) tendering2012 Build detector Commission detector2017 Initial period of data taking Guenther RosnerNuPECC, Prague,
Commissioning & Operation Commissioning MSV, Modules 0-3 – Top priority: Module 0 – SIS100 – Sequence of experiments depends on Civil construction Progress in – Prototyping & building of accelerators (storage rings) – Prototyping & building of production targets (RIB & anti-proton targets) – Prototyping & setting up of large-scale experimental equipment Funding (majority from outwith FAIR MSV budget) Operation MSV, Modules 0-3 – Signing of agreement on financing the FAIR operation budget three years after project has started Development of model for fair share of costs for operating FAIR Explore – Contributions from countries that are not shareholders, but participate in exploiting the facility scientifically – Set up common collaboration funds for running the experiments (cf. DESY & CERN) Modules 4 & 5, Phase B – Secure funding for civil construction, accelerators and experiments of Modules 4 & 5 – Continue R&D, in particular for SIS300, HESR Electron Cooler and NESR Electron Ring Guenther RosnerNuPECC, Prague,
Thank you very much Guenther RosnerNuPECC, Prague,