Does Goldratt Understand the “Theory” of Constraints? Evaporating the “Do not balance”cloud.

Slides:



Advertisements
Similar presentations
An Example of Quant’s Task in Croatian Banking Industry
Advertisements

Chapter 9 Maintenance and Replacement The problem of determining the lifetime of an asset or an activity simultaneously with its management during that.
1-1 Copyright © 2015, 2010, 2007 Pearson Education, Inc. Chapter 21, Slide 1 Chapter 21 Comparing Two Proportions.
G. Alonso, D. Kossmann Systems Group
Testing Hypotheses About Proportions Chapter 20. Hypotheses Hypotheses are working models that we adopt temporarily. Our starting hypothesis is called.
McGraw-Hill Ryerson Copyright © 2011 McGraw-Hill Ryerson Limited. Adapted by Peter Au, George Brown College.
Bertrand Model Matilde Machado. Matilde Machado - Industrial Economics3.4. Bertrand Model2 In Cournot, firms decide how much to produce and the.
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
Introduction to Hypothesis Testing
Constrained Maximization
Copyright © 2009 Pearson Education, Inc. Chapter 16 Random Variables.
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
Copyright © 2010 Pearson Education, Inc. Chapter 19 Confidence Intervals for Proportions.
Determining the Size of
Inferential Statistics
1 10. Joint Moments and Joint Characteristic Functions Following section 6, in this section we shall introduce various parameters to compactly represent.
Chapter 19: Confidence Intervals for Proportions
Hypothesis Testing – Introduction
Statistical Techniques I
Review of Statistical Inference Prepared by Vera Tabakova, East Carolina University ECON 4550 Econometrics Memorial University of Newfoundland.
F OUNDATIONS OF S TATISTICAL I NFERENCE. D EFINITIONS Statistical inference is the process of reaching conclusions about characteristics of an entire.
1 Chapter 5 Flow Lines Types Issues in Design and Operation Models of Asynchronous Lines –Infinite or Finite Buffers Models of Synchronous (Indexing) Lines.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 11 th Edition.
Theory of Probability Statistics for Business and Economics.
Linear Programming An Example. Problem The dairy "Fior di Latte" produces two types of cheese: cheese A and B. The dairy company must decide how many.
Introduction to inference Use and abuse of tests; power and decision IPS chapters 6.3 and 6.4 © 2006 W.H. Freeman and Company.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Pearson Prentice-Hall, Inc.Chap 8-1 Statistics for Managers Using Microsoft® Excel 5th Edition.
 Dr.Eliyahu Goldratt applied his theory of constraints(TOC) to the pratice of project mgt producing called critical chain.
1 Chapter 16 Random Variables. 2 Expected Value: Center A random variable assumes a value based on the outcome of a random event.  We use a capital letter,
Random Variables Chapter 16.
Chapter 7 Sampling and Point Estimation Sample This Chapter 7A.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Copyright © 2008 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 20 Testing Hypotheses About Proportions.
Chapter 7 Sample Variability. Those who jump off a bridge in Paris are in Seine. A backward poet writes inverse. A man's home is his castle, in a manor.
Inferential Statistics A Closer Look. Analyze Phase2 Nature of Inference in·fer·ence (n.) “The act or process of deriving logical conclusions from premises.
Copyright © 2010 Pearson Education, Inc. Chapter 19 Confidence Intervals for Proportions.
The Theory of Constraints
Statistical Inference for the Mean Objectives: (Chapter 9, DeCoursey) -To understand the terms: Null Hypothesis, Rejection Region, and Type I and II errors.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Chapter 16 Random Variables.
Naïve Set Theory. Basic Definitions Naïve set theory is the non-axiomatic treatment of set theory. In the axiomatic treatment, which we will only allude.
Demand: The Benefit Side of the Market. 2 Law of Demand  Law of Demand  People do less of what they want to do as the cost of doing it rises  Recall.
Copyright © 2009 Pearson Education, Inc. Chapter 19 Confidence Intervals for Proportions.
Review of Statistics.  Estimation of the Population Mean  Hypothesis Testing  Confidence Intervals  Comparing Means from Different Populations  Scatterplots.
Joint Moments and Joint Characteristic Functions.
Copyright © Zeph Grunschlag, Induction Zeph Grunschlag.
Framework. Notation r=vector of excess returns –Bold signifies vectors and matrices. We denote individual stock excess returns as r n. –Excess above risk.
Statistical processes ENMA 420/520 Statistical Processes Spring 2007 Michael F. Cochrane, Ph.D. Dept. of Engineering Management Old Dominion University.
Statistical Inference for the Mean Objectives: (Chapter 8&9, DeCoursey) -To understand the terms variance and standard error of a sample mean, Null Hypothesis,
Reliability of Disk Systems. Reliability So far, we looked at ways to improve the performance of disk systems. Next, we will look at ways to improve the.
Generating Random Variates
Multiple Regression Analysis: Inference
Comparing Two Proportions
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Chapter 15 Random Variables
Introduction to inference Use and abuse of tests; power and decision
The Theory of Constraints
Testing Hypotheses About Proportions
Cost Concepts for Decision Making
Synchronous Manufacturing
Hypothesis Testing – Introduction
Testing Hypotheses about Proportions
Differential Analysis: The Key to Decision Making
Testing Hypotheses About Proportions
Lecture 7 Sampling and Sampling Distributions
Confidence Intervals for Proportions
Goldratt's Theory of Constraints (TOC)
Chapter 16 Random Variables Copyright © 2010 Pearson Education, Inc.
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

Does Goldratt Understand the “Theory” of Constraints? Evaporating the “Do not balance”cloud

Agenda Originality Correctness The correct balance approach A graphic presentation of economic balance Conclusion

MBC & PERT/CPM 1. Identify the binding constraints 2. Decide how to exploit it (focus on it) 3. Subjugate everything else to that decision 1. Identify the critical path 2. Focus on the critical path 3. Start all non-critical activities early to ensure critical path won’t be compromised

MBC and PERT/CPM 4. Elevate the binding constraint 5. Return to Step 1 4. Crash the critical path 5. Recalculate the critical path (return to step 1)

MBC and PERT/CPM For projects, step 3 is too conservative and not recommended, but that’s how it was taught and it does “subjugate” For “pre-Goldratt” sources of a better approach, see author. In effect, this talk argues that this better approach applies to MBC as well

Interim Conclusion When Goldratt “discovered” that MBC (or however he calls it) applies to projects, it was chutzpah of a magnitude that even he had not reached before When he changed the name “critical path” to “critical chain” nobody in their right mind should have accepted it The chutzpah might be more palatable if we could trust the “theory.” Can we?

MBC and Balance Consider Step 4 in MBC: Elevate the binding constraint Clearly if we repeat it again and again, without waste, new bottlenecks arise and the system can’t help but become more balanced “More balanced” means that the bottleneck shifts over time, randomly [& it’s fine]

MBC and Balance Since it is derived from PERT/CPM, MBC, as presented above, is a commendable management approach The balance we talk about is similar to what’s observed in projects during crashing: it becomes more and more likely that the nominal critical path will not prove to be the true critical path in the realization

MBC and Balance But Goldratt is on record stating that balance should be avoided In the book Critical Chain he even proves this mathematically The proof is based on his own hallowed principle: “an hour lost on the bottleneck is an hour lost to the system”

MBC and Balance He proceeds to show that it is impossible to protect the throughput of the bottleneck without excess capacity on all other resources Will this maximize throughput? Goldratt is believed to be the “throughput guru,” so let’s study the correct balance for throughput maximization

Economic Balance The correct balance of a system is defined as the set of capacities that maximizes the expected throughput after taking into account the cost of said capacity Assume a system with n resources such that the potential capacity of each is an independent random variable, X i

Economic Balance The throughput of the system is defined by the minimum of these r.v.’s Assume that by doubling R i we also double X i Let the cost of doubling R i be C i In practice we can calculate it as 100 times the cost of increasing R i by 1%. WLOG normalize such that Σ i C i =1.

Economic Balance Assuming continuous capacities, only one resource can be critical at the same time. R i is critical with probability p i and Σ i p i =1. define difference random variables of the form X=X 1 ‑ X 2. More generally, X 1 may be the minimum in a subset of resources and X 2 is then the minimum of the complement of this subset.

Economic Balance We call a difference distribution well- behaved if it does not change its shape when R i is changed infinitesimally. I.e., a small change in R i involves a small parallel shift along the CDF of the difference distribution. E.g., the difference between two normal random variables is well- behaved.

Economic Balance Numerical experience suggests that typical systems are approximately well-behaved Otherwise we may require slight modification, involving increasing or decreasing C i by a small percentage. (C i should be decreased if increasing R i reduces the variance of the system’s throughput.)

Economic Balance Theorem 1: In a well-behaved system, optimal economic balance is achieved when p i /C i =1,  i. The proof is by a newsboy argument for any two subsets Define the service level of resource i, SL i, as the complement of the criticality, 1 ‑ p i, then SL i *, the optimal SL i, is given by 1-C i

Graphic presentation |∆| |w| C1C1 p1p1 0 w Figure 0: Calculating the potential benefit by balance

Economic Balance The same result, essentially, can be derived by a linear programming model where Δ i =ΔR i /R i.

Economic Balance The marginal gain associated with a small investment in balance for a resource is E 0 |C i ‑ p i |/min(p i,C i }, where E 0 is the current value of the system in ΣC j units (a profitable system implies E 0 >1, but we’ll assume E 0 =1).

Graphic presentation Figure 1: A Basic Diagram p1p1 p2p2 p3p3 C1C1 C2C2 C3C3

Graphic presentation Figure 2: Adding Flags to the Diagram p1p1 C1C1 p2p2 C2C2 p3p3 C3C3

Goldratt’s “balance” Let the main bottleneck resource, R 1, have C 1 =0.66 (Figure 3). A starvation probability of 0% on it implies p 1 =100%. Impossible! So assume a 1% probability of starving the bottleneck (the criticality is 99%). This allows all other resources combined to be critical 1% of the time.

Therefore… Figure 3: An Example of Gross Imbalance

Calculating the waste In this example, 97 cents out of the last dollar invested in the supporting resources was wasted. The red flag is 3300% tall (about 15 screen sizes). Of course, if the criticality of the BN would indeed reach 100% the waste of the last dollar would be 100 cents, with an infinitely tall flag!

Evaporating the cloud Unlike balloon-bursting, which may be done with a pin or a cigarette, proper “cloud evaporation” involves exposing erroneous assumptions Where then is the wrong assumption?

Evaporating the cloud The culprit here is the “rule” that an hour lost on the BN is an hour lost to the system. It is simply wrong if we measure the system by throughput

Conclusion The answer to the title question is that he doesn’t (or at least there is no official evidence that he does) By the way, anybody here in the market for a used car?

Thank you very much Any questions?