DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle Constructed Wetland Design at Sipaulovi Village.

Slides:



Advertisements
Similar presentations
JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Advertisements

Dam Construction Alternatives Site Specific Matrix
Omega & Associates Engineering Ltd. Chilliwack Providing professional services to our clients with quality, cost effective AND innovative engineering solutions.
1 B.C. Government’s Ministry of Environment Waste Authorizations for Slaughter and Poultry Processing Facilities September 23, 2006 Slaughter & Poultry.
Welcome to American #2 Wastewater Treatment Plant.
IPN-ISRAEL WATER WEEK (I2W2)
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
Techniques in post treatment of ABR effluents in treating municipal wastewater A literature review of appropriate technologies for Nepal Sanita Dhaubanjar’13.
Introduction to Environmental Engineering Code No. (PE389) Lec. 6.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
Conceptual Design of a Wastewater Treatment Plant for the Municipality of Cotorro, Province of Havana, CUBA 2009 Association for the Study of the Cuban.
The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
APEX Engineering Ian Braun Andrew Halley Jorge Hernandez Mohamad Haikal Bin Maamor PROPOSED HUALAPAI MUSEUM SITE DESIGN 1.
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
® (With apologies to George Lucas) City of Boulder.
ENVIRONMENTAL COMMITMENT COMPLIANCE. Mark Schrader – FHWA –Law and Process Review Findings Bill Bicknell – USFWS –Field Review Examples Sheri Lares -
1 Case Study Case Study Serenbe Palmetto, GA. 2 Project Summary Location:Palmetto, Georgia Acreage:900 Units:Approx. 165 residential units, 115 Live/work.
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
Connecticut Department of Energy and Environmental Protection.
Wastewater Management Why ?. Why are we concerned about wastewater? Public Health Protection Waterborne diseases Environmental Protection Our lands and.
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Engineering and Technical Plans Description, process and standards Dh 2005.
1 Lead Emissions from Piston-Engine Powered Aircraft: EPA Activities & Next Steps For National Tribal Forum on Air Quality Meredith Pedde May 21, 2015.
NYSDOT GreenLITES “ G reen L eadership I n T ransportation E nvironmental S ustainability” Modified from original by Mark Arner, PE, C&S Engr.
Water Treatment CE 326 Principles of Environmental Engineering Department of Civil, Construction and Environmental Engineering Iowa State University March.
Quyumta Community Sustainability Report Meeting Nelson Island.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
CE448 WATER AND WASTEWATER TREATMENT Department of Civil Engineering King Saud University.
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
Assessment of on-site sewage disposal systems after severe flooding Steven R. Tidwell, E.I. U.S. Public Health Service APHT3 – Disaster Engineer Presentation.
ROGUE RIVER GREENWAY TRAIL Gold Ray Road Solution Team Meeting February 19, 2009.
SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P.E. SOUTHEAST REGIONAL OFFICE SUPERVISOR TECHNICAL SERVICES UNIT.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
Anaerobic Digestion at Wastewater Treatment Plants Regulatory Issues Bureau of Resource Protection April 2011.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main Rachel Rausch, EIT.
How to Find a Water Project for The Community Engineering Corps J. Alan Roberson, P.E.Lindsey Geiger, ENV SP Director of Federal RelationsAssociate Engineer.
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
Harwich, Massachusetts Overview of Comprehensive Wastewater Management Plan (CWMP) East Harwich Planning Workshop June 4, 2014 East Harwich Planning Workshop.
Scoping Meeting April 20th 6:00 pm
Biosolids Public Workshop March 22, 2016
Analysis of Qabalan, Water Network , Design of Wastewater
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Wastewater Treatment.
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Davie Green Water Project
An-Najah National University
An-Najah National University
ChE 473K Plant Design R. Bruce Eldridge.
Specialized Short Course on for Water and Wastewater Treatment
Wastewater Management
DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle
Nina Manig Leibniz Universität Hannover Training financed by GIZ - BMZ
Propose, Recommend and Suggest
CENE Old Town Frame Company
Village of Naples New Sanitary Sewer System Final System Layout
Presentation transcript:

DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle Constructed Wetland Design at Sipaulovi Village

DCS Solutions Who are we? Don Jackson – Team Leader Don Jackson – Team Leader –Main client contact –Design & research Chen Kiat Yong Chen Kiat Yong –Main design research –Permitting & regulations Sarah Doyle Sarah Doyle –Main drafter –Design & research –Deliverable editing

Objective To design a centralized wastewater treatment system to meet current and future demand for the Village of Sipaulovi. To design a centralized wastewater treatment system to meet current and future demand for the Village of Sipaulovi.

External Consultants George Mase George Mase –Main Tribal Contact –Community Services Administrator John Mead John Mead –Wastewater Technical Specialist –Institute for Tribal Environmental Professionals Suzanne Jamison Suzanne Jamison –Liaison for DCS and Hopi Tribe Paul Gremillion, P.E. Paul Gremillion, P.E. –N.A.U Professor, Civil & Environmental Department Christine Laguna, P.E. Christine Laguna, P.E. –Grading & Drainage Specialist –CAD advisor Jason Nieto Jason Nieto –Certified Plant Operator –Sipaulovi Lagoons Erika Schoen, E.I.T. Erika Schoen, E.I.T. –Environmental Engineer –Indian Health Service Carl Seweyestewa Carl Seweyestewa –Land Information Systems Surveyor, Hopi Tribal Government Mike Stover, P.E. Mike Stover, P.E. –Technical Advisor –I.H.S. Environmental Engineering Consultant

Introduction Problems with current system Problems with current system –Future growth – population may double Projected calculations in Microsoft Excel Projected calculations in Microsoft Excel –Odors from existing facility –No central sewer system

Sipaulovi Village Proposed site

Aerial photo

What does the client want? Centralized WWTS for current and future users Centralized WWTS for current and future users Prefers Constructed Wetland Design Prefers Constructed Wetland Design Wants to reuse effluent for non-edible crops (gourds, livestock fodder, etc…) Wants to reuse effluent for non-edible crops (gourds, livestock fodder, etc…) Trees Trees Would like to attract birds and other wildlife Would like to attract birds and other wildlife

Design phases: 30% design proposal (completed) 30% design proposal (completed) –Includes research of design alternatives 60% design proposal (pending) 60% design proposal (pending) –Will be completed by April 6 –After 60% design proposal is completed, client representative (George Mase) will be consulted to select final design 90% design proposal (to be completed) 90% design proposal (to be completed) –Includes engineer’s construction cost estimates 100% design proposal 100% design proposal –To be completed by April 20 th –Capstone presentation April 27 th

Design Elements: Transport (not in scope of project) Transport (not in scope of project) –Flow equalization/settling tank –Bar screen –Flow meter (requires electricity) –Pump (requires electricity) –Pressure sewer & Gravity sewer Primary Treatment System Primary Treatment System –Oswald system OR lagoon –Lined or unlined Secondary Treatment System Secondary Treatment System –Constructed wetland (Oswald only) –Non-discharging OR effluent reuse

Questions? Comments? Suggestions?