The Problem – Pre-Screen Loss at Clifton Court Forebay The Plan – A Multi-pronged Approach Bioenergetics Modeling : Models to be determined based upon.
Pilot Project Alternatives FRANKS TRACT San Joaquin River False River Old R i v e r Sacramento River Operable Gates in Three Mile Slough Alt #1 Operable.
U.S. Fish and Wildlife Service Cay Goude Ryan Olah Steve Detwiler Victoria Poage Derek Hilts U.S. Bureau of Reclamation Mike Chotkowski Lenny Grimaldo.
Exploring Regional Desalination as a Water Supply Option in the Bay Area The Who, What, When, Where, Why and How of Regional Water Supply Planning May.
Using the minimum distance as a metric for testing is ambiguous when fish have greater than two channels to move into. Fish GPS position during each day.
California State Water Project & MWD Tours. The Issue…..  The vast majority of water in the State of California falls in the top 1/3 of the state (north.
1 Water Planning & Stewardship Committee Item #6b Summary Subject: Review of Long-Term Delta Actions & Water Supply Planning Implications Purpose:To open.
Drainage District #7 Pump Station Retrofits for Safe Fish Passage Ryan Bartelheimer, P.E. Snohomish Conservation District.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Murphy 2012 Bruneau River and Murphy Flows Liz Cresto September 19, 2012.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Fresno County Water Crisis and Opportunities. The Delta And Our Water Supply In August 2007 the Federal Court ruled that the Delta Smelt was in danger.
Southern California Water Committee March 26, 2010 Ontario KARLA NEMETH, Natural Resources Agency.
Urban Water Institute Conference August 22,
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Periodic Review of the 1995 Water Quality Control Plan for the San Francisco Bay/Sacramento-San Joaquin Delta Estuary Comments of The Bay Institute on.
Two Years Old: Walking and Talking - Poised to Run? Urban Water Institute: August 25, 2011.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
Draft Recommendations of the San Joaquin Water Quality Management Group Plan for Achieving Salinity/Boron and DO Objectives Plan for Achieving Salinity/Boron.
Region Acceptance Process Draft Recommendations Workshop Department of Water Resources Sept 8, Sacramento Sept 9, Los Angeles Sept 10, Fresno.
Where to From Here Jerry Johns, DWR EWA Development of OCAP Proposal.
City-County Office of Metropolitan Water Planning 660 J Street, Suite 260 Sacramento, CA January IMPACTS ON LOWER AMERICAN RIVER SALMONIDS.
Delta Passage Model: A quantitative framework for integrating and understanding water project effects on migrating salmon Funded by Metropolitan Water.
Species or RunONDJFMAMJJAS Fall Chinook Late fall Chinook Winter Chinook Spring Chinook Steelhead Delta smelt Figure 1. Comparison of the timing of life.
New Science – New Regulations Bruce Herbold (EPA) IEP and POD Management Teams.
Recommendations on export limits San Luis & Delta-Mendota Water Authority.
UNDERSTANDING THE DELTA - AN ENGINEERING PERSPECTIVE.
California Water Dialog March 24, 2010 Jerry Johns Deputy Director California Department of Water Resources.
Digital Map from Dr. William Bowen California State University Northridge Sacramento- San Joaquin Delta San Joaquin River Sacramento River Suisun Bay San.
OCAP/SDIP Public Information Meeting Chet Bowling - Intro Ann Lubas-Williams – OCAP Andy Chu – SDIP Jerry Johns – EWA Ron Ott – Other CALFED Activities.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Deltakeeper Other Changes for the Program of Implementation (Issue 11) SWRCB D-1641 Workshop March 2005 Deltakeeper by Dan Bowman Odenweller Fishery Biologist.
Western Delta Diversion Gary W. Darling Delta Stewardship Council September 22, 2011 Delta Diablo Sanitation District.
Historical CVP and SWP Salvage and OCAP Loss Estimates Chinook Salmon, Steelhead Rainbow Trout, and Striped Bass Project Impacts in the southern Delta.
Project Status South Delta Improvements Program Project Status November 2003.
1. Digital Map from Dr. William Bowen California State University Northridge Sacramento- San Joaquin Delta San Joaquin River Sacramento River Suisun Bay.
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Slide 1 Drinking Water Subcommittee Greg Gartrell, Chair CALFED Bay-Delta Public Advisory Committee SWRCB Periodic Review Presentation January 2005.
DSM2 Analysis of Water Level and Water Quality in the South Delta Presented to California Water and Environmental Modeling Forum February 26, 2007 Fingerprinting.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
October NBA History Abshire-Kelly Salinity Control Act of 1955 Abshire-Kelly Salinity Control Act of 1955 Original authorization: Original authorization:
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
1 Delta Risk Management Strategy Delta-Suisun Marsh Branch Department of Water Resources SCWC/SCWD MEETING JUNE 27, 2007.
Drought Management Sheri Looper CVP Water Resource Specialist.
California Water Supply Overview Robert Shibatani CEO & Consulting Hydrologist The SHIBATANI GROUP, Inc.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Introduction Joint Presentation of State Water Contractors and San Luis & Delta-Mendota Water Authority.
Marin Greenwood ICF International 1. Chapter 6: Effects Analysis for Delta Smelt Appendix 5.A: CalSim II Modeling and Results Appendix 5.B: DSM2 Modeling.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
Proposed EPA Power Plant Cooling System Regulations.
Model Description Sample Results Next Steps Monitoring Data (Initial Conditions) Hydrodynamics Water Quality USGS; DWR Monitoring Data (Initial Conditions)
1 Delta-Suisun Marsh Branch Department of Water Resources CWEMF Annual Meeting – DRMS Discussion 02/27/2007 Delta Rick Management Strategy.
Water Resource Management Planning Update
Water Infrastructure Improvements for the Nation (WIIN)
In-Delta Storage Program
Issue 4b - Addressing Local Degradation -
California’s Plan to Deal With Once-Through Cooling At
Delta Risk Management Strategy
Water Resource Management Planning Update
Brackish Water Desalination Project
In-Delta Storage Program
Ajay Goyal Department of Water Resources August 9, 2007
Ajay Goyal Department of Water Resources August 9, 2007
Summary of COA and Addendum
Resource Management and Climate Protection Committee Meeting:
Presentation transcript:

Study for Fish Screens at Existing Delta Facilities Dr. Leah Orloff Water Resources Manager CUWA Board MeetingJuly 24, 2009

- 2 - July 24, 2009 Study Objective Analyze the feasibility of pilot fish screens in the Delta for existing export facilities.

- 3 - July 24, 2009 Near-term and long-term benefits –Existing Delta exports are adaptively managed based on salvage of delta smelt and salmon –Existing Delta facilities are still necessary with any size Isolated Facility, including 15,000 cfs 2,000 cfs pilot screens will provide water supply reliability The Need for Fish Screens

- 4 - July 24, 2009 Current Operations No screening means no reliability In 2009, FWS adaptively restricted exports based on combined delta smelt salvage. –FWS tightened constraints from mid-May through June because of high salvage levels. –Despite the restrictions, pumps were shut down for 1-2 days at the end of May to avoid exceeding take limits. 2,000 cfs pilot screens would have prevented almost all salvage in spring 2008 and 2009.

- 5 - July 24, : 2,000 cfs screens would have prevented nearly all salvage

- 6 - July 24, : Fish screens would have saved up to 186 TAF Number of days in this month when cumulative salvage exceeded FWS take limit Acre-feet pumped at Banks this month when cumulative salvage exceeded FWS take limit If current FWS smelt take limits had been in place in spring 2008, they would have been exceeded in May, June, and July.

- 7 - July 24, 2009 Long- term, fish screens are needed for dual conveyance BDCP modeling shows –Continued reliance on existing Delta exports –Over 50% of supply from existing facilities in drier years 20% 75% 30% 50% 40% Average Exports (TAF/year ) Wet Above Below Dry Critical Normal Normal

- 8 - July 24, 2009 Pilot Project Study Project Management: –Funding partners will enter into an MOU –Two-tier management: Policy Team and Technical Team Schedule: All work to be completed within 6 months of consultant selection. Budget: $200,000

- 9 - July 24, 2009 Pilot Project Study Objective: Analyze the feasibility of pilot fish screens in the Delta for existing export facilities. Determine the best: –location –way to limit predation –way to ensure sweeping velocity –way to move fish out of the South Delta –way to avoid indirect impacts –improvement in water supply reliability

July 24, 2009 Scope of Work Task 1:Review previous studies Task 2:Develop conceptual alternatives Task 3:Assess alternatives for feasibility and benefits Task 4:Perform a blocking analysis Task 5Prepare materials for scientific review panel

July 24, 2009 Potential Screen Locations Feasibility studies will examine the best placement and design of fish screens to limit predation Positive barrier fish screens and tidal barriers provide sweeping velocities for fish survival North CanalWest CanalItalian Slough Screen Tidal Barriers Screen Tidal Barriers Screen Channel Modification

July 24, 2009 Extra Slides

July 24, : 2,000 cfs screens would have prevented nearly all salvage

July 24, 2009 In the near term, fish screens may ensure water supply reliability Number of days in this month when cumulative salvage exceeded FWS take limit Acre-feet pumped at Banks this month when cumulative salvage exceeded FWS take limit If current FWS delta smelt take limits had been in place in spring 2008, take limits would have been exceeded in May, June, and July, costing up to 182 TAF at Banks Pumping Plant Data

July 24, 2009 Tides provide sweeping velocity in the South Delta 0.4 ft/s

July 24, 2009 Screens Work CCWD’s Old River Intake screen prevents fish entrainment –12 years of operation –982 TAF diverted –Negligible effect on listed fish  Collected 1 delta smelt (June 2000, 18mm)  Collected 1 longfin smelt (April 2002, 22mm)  Collected 0 Chinook salmon and 0 steelhead

July 24, 2009 Fish Screens May Provide Benefit now and in the future Source: Wim J. Kimmerer, Matthew L. Nobriga. Investigating Particle Transport and Fate in the Sacramento- San Joaquin Delta Using a Particle Tracking Model. San Francisco Estuary and Watershed Science, Vol. 6, Issue 1 (February 2008), Article 4. Now: OMR restrictions limit South Delta exports Future: Dual conveyance will lower South Delta exports Fish that are successfully screened from exports have a greater likelihood of escaping the Delta during low export conditions.

July 24, 2009 Drafting a review report – synthesis of previous studies is a first stepDrafting a review report – synthesis of previous studies is a first step However …However … –DWR report is not examining current conditions  Outmoded technology  OMR restrictions have changed Delta hydrodynamics - may increase fish screen effectiveness  Fish screens may prevent SWP from reaching take limits –DWR may not have resources to do further studies Current DWR Efforts

July 24, 2009