© Siemens Energy, Inc. 2008 Energy Automation CIM Model Management Kurt Hunter 2009 IEEE Power System Conference & Exposition March 18, 2009.

Slides:



Advertisements
Similar presentations
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Advertisements

Configuration management
iStar How to Create an Amendment
Creating and Submitting a Necessary Wayleave Application
Doc.: IEEE 802 EC-12/0026r2 Submission July 2012 Jon Rosdahl, CSRSlide 1 Meeting Manager - Proposed Changes to OM and Chair’s Guideline Date:
TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
Psych 499 A-B-C Important Information Friday Sept. 13 th, 2013.
Doc.: IEEE /0348r0 Submission March 2015 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 Proposed Tiger Team actions Date: Authors:
Best Practices Wiki Ruth Duerr NSIDC, IEEE Jay Pearlman, IEEE Siri Jodha Singh Khalsa, IEEE Report to GEO Committees February 2008.
1 © 2006 by Smiths Group: Proprietary Data Smiths Group Online Performance Review Tool Training.
AUDITS Process and Corrective Actions OIG RolesGAO ROLES – OIG –OIG Lead Auditor –OCFO – owner of MATS and Agency Audit Process –OEI AA – Designated OEI.
Change Management Demo for IT 11/06/2013 Change Management, IT Meeting 11/06/
Claim Tracking System. Why was the Claim Tracking System Built? Mandated by the 2002 Legislature Automated Monthly Summary Reports Track and Ensure Construction.
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall.
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP m-session-62-closing-report Title: m Session #62 Closing Report Date Submitted:
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
Lorie Stolarchuk Learning Technology Trainer 1 What has changed with the 2.7.X Upgrade to CLEW?
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
School Forms for the Common Application Online.
Preceptor Orientation
Discipline, Crime, and Violence August New DCV Application The DCV application and submission process has been revised beginning with the
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT three UNIT Four Project UNIT Five Preview Project Status Summary.
UCTE Viewpoint towards CIM – project report Chavdar Ivanov, Ph.D. UCTE Secretariat, Convenor of AhG UCTE format CIM User Group meeting, 12-15th May 2009,
Author Instructions How to upload Single Abstract to the paper management system.
IRB Electronic Submission. IRB Definition Committee formally designated to approve, monitor, and review biomedical and behavioral research involving human.
IEEE-SA myBallot TM myBallot ™ IEEE Standards Association New Electronic Balloting System Sponsor Tools.
Home NEW INNOVATIONS Resident/Fellow Introduction NEW INNOVATIONS Resident/Fellow Introduction This presentation includes the following topics: Login Notifications.
1 Faculty Center for Instructors and Roster Contacts Accessing Faculty Center Class Roster Grade Roster Request Grade Changes Grade Approval Process Next.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
Networking the World TM IEEE: Networking the World.
Project Portfolio Management MaestroTec, Inc. Project Portfolio Management Providing the tools and resources necessary to effectively.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
Setting Up TGO User Accounts. Creating User Accounts for Other Users If your company has other users who need to use the Active Orders system, your company’s.
Student Quick Start Guide Prepared by: Information Services Division Perpustakaan Sultan Abdul Samad Universiti Putra Malaysia
TTI Performance Evaluation Training. Agenda F Brief Introduction of Performance Management Model F TTI Annual Performance Review Online Module.
Ver. 02/13/  Registration  New Studies  Continuing Reviews  Amendments  Reportable Events  Tips & Tricks  Questions 2.
> Title of presentation - Date - References11 Model Exchange and Naming -- Activity  Standard  New draft of standard has been created.
The ABA and SIL Take Policy Positions Policy pursued as a matter of civic duty. SIL uniquely positioned to provide technical input and to influence policy.
Project Manager (CTM) Training – What’s New ePIP Phase II.
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
Thesis Defense and Submission 1 Spring  Register for Spring semester  Deadline to submit thesis to GPS: Friday, April 22 nd at NOON  Deadline.
Copyright © 2002 Open Applications Group, Inc. All rights reserved Open Applications Group Core Components WG Overview January 30, 2003.
TC CIM Model Manager Summary Kendall Demaree AREVA T&D Inc. March 2009.
Project management Topic 8 Configuration Management.
Doc.: /0036r0 SubmissionSlide 1 11/03/2016 Slide 1 IEEE White Space Radio Opening Report Notice: This document has been prepared to assist.
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.
SDA Formulas Online Webinar Please use the mute button or press #6 on your phones to mute the teleconference line If you have questions or technical problems.
SDA Formulas Online webinar Tomika Moore Senior Chemist, Nonbeverage Products Laboratory September 13, 2012.
Quarterly Geo/SIG Coordinator Webinar June 25, 2014.
eIRB Training IRB Committee Members
GMAS Proposal Entry and Proposal Homepage Enhancements
Declaring intent in leo
Tulare County Youth Commission
TGn Editor Report Jan 2009 Date: Authors:
Global Grid Forum GridForge
Proposal Transmittal Form (PTF)
ICOTS Helpdesk Training
Uploading Data in the Staff Interchange
SUNY Pre Award and Compliance Systems Institutional Review Board (IRB)
CIM Model Manager Report
IEEE C /48 Project IEEE Working Group on Mobile Broadband Wireless Access Title New Business Item/
Agenda and minutes TGn PHY ad hoc
Agenda and minutes TGn PHY ad hoc
Agenda and minutes TGn PSMP ad hoc
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Patty Orndoff RN, MEd IRB Education Coordinator
Presentation transcript:

© Siemens Energy, Inc Energy Automation CIM Model Management Kurt Hunter 2009 IEEE Power System Conference & Exposition March 18, 2009

Page 2 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management Topics o Background o Responsibilities of CIM Model Manager o CIM Issues Process o CIM Issues for 2009

Page 3 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management Background Background o Prior to the formation of the CIM Users Group in 2005, the CIM UML model was passed between volunteers from WG 13 and 14 to make necessary changes o To assist with the establishment of the CIM Users Group, Siemens, ABB, and Areva agreed to fund the position of CIM Model Manager for the first three years.  Kurt Hunter, Siemens  2007 – Lars-Ola Osterlund, ABB  2008 – Kendall Demaree, Areva oFor 2009, Siemens agreed to fund the position again.

Page 4 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management Responsibilities of CIM Model Manager Responsibilities of CIM Model Manager o Manage and maintain the integrated CIM UML model o Coordinate model changes with WG 14 and WG 16 o Manage the CIM issues list o Facilitate WG 13 Issues discussions o Produce the IEC document o Assist CIM UG in answering questions from users o Report to WG 19 and other IEC working groups

Page 5 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process CIM Issues UML Model and Profile Changes Interoperability Tests

Page 6 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process CIM Issues Process consists of three primary components: o Issues Submission o Issues Resolution o Issues Tracking

Page 7 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Submission CIM Issues Submission o In the past issues have been written second hand from information in s, discussions at Interop Tests, etc. o Consequently, issues that could not be resolved quickly are frequently difficult to interpret when coming back to them. o Currently requiring issues to be written by the submitter, preferably using the CIM Users Group website.

Page 8 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Submission CIM Users Group Website:

Page 9 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Submission Model Issues Summary

Page 10 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Submission Submitting a New Issue

Page 11 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Submission New Issue Submission Form

Page 12 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Submission Tips for CIM Issues Submission o Be as specific and detailed as possible. o If possible, include a detailed proposed resolution to the issue. A UML model or UML class diagram can be submitted with the issue as an attachment. o For proposed model extensions include a detailed use case. o Review the CIM issues spreadsheet before submitting to determine is the issue has been submitted previously.

Page 13 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Submission Current CIM Model Files o Available as a.zip file on CIM Users Group site that includes five files:  UML model (iec61970cim14v05_iec61968cim10v21_combined.eap)  CIM Issues list (CIM_issues_ xls)  CIM Changes log (CIM_changes_ xls)  WG 13 Issues Report (WG13_CIM_Issues_Report_ doc)  WG 14 Change Log (WG14-change-log.txt)

Page 14 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Submission CIM Issues Spreadsheet includes fields for: o Working Group (WG 13, WG 14, WG 16 or combined) o Issue No. (Unique # assigned by CMM) o Author / Contact Information o Date Submitted o Package (Wires, Core, Assets, etc.) o Description of Issue o Proposed Resolution o Decision o Person Assigned o Due Date Status

Page 15 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Resolution CIM Issues Resolution o Simple issues may be resolved by the CMM and then sent to WG 13 members for approval. o More complex issues will be discussed during WG 13 and WG 14 CIM issues conference calls. Resolution of an issue may be reached during calls or may be deferred to the next WG 13 or WG 14 meeting. o Complex or controversial issues will be discussed face to face at WG 13 and WG 14 meetings. o All WG 13 CIM changes are tracked in a spreadsheet.

Page 16 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues Process - Resolution CIM Changes Spreadsheet includes fields for: o Change Number (assigned by CMM) o Action (New, Change, Delete) o Package (Wires, Core, etc.) o Subject (Affected class, attribute, or association) o Subject Type (Class, Attribute, or Association) o Description o Issue Reference Number (from CIM Issues List) o New CIM Revision o Author o Date of Change o Comments

Page 17 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues for 2009 CIM 2009 Yearly Cycle 2009 Jan FebMarAprMayJunJulAugSepOctNovDec 2010 CPSM Interoperability Test Dynamics Interoperability Test UCTE Interoperability Test Finalize UML And Produce CIM 14 Release Resolve Issues from Interoperability Tests

Page 18 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management CIM Issues for 2009 CIM Issues for 2009 oCompound Datatypes oDC Models oState Variable oEPRI CIM-for-Planning Dynamics Models oDisplay Layout Exchange oEquivalents Enhancements oLoad Model Clean-up WG13/14 oWG16 Integration oMultiple Inheritance

Page 19 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Management Questions?