Ultra-Compact Electrical Machines for Wind Energy DE-FOA-0000978: Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.

Slides:



Advertisements
Similar presentations
1. Instrument Clusters Theory Support Automotive – Displays & Accessories 1 of 13 Instrument Clusters Topics covered in this presentation: Analog Instrument.
Advertisements

Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
3. ARMATURE VOLTAGE AND GOVERING EQUATIONS
Physics 12 Direct Current Motors. Joke of the day: An object at rest stays at rest and an object in motion stays in motion with the same speed and in.
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
Transformer SONNY P. DE LEON MT 1.
AC Review Discussion D12.2. Passive Circuit Elements i i i + -
Lesson 33 AC Generators.
ET 332a Dc Motors, Generators and Energy Conversion Devices 1.
Electrical Machine-I EE 2107 Dr. Md. Sherajul Islam
Generators and Power Production By Scott ChonisterBy Scott Chonister.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Muons, Inc. AAC Feb. 4, 2009 V. Kashikhin 1 Fermilab AAC  V. Kashikhin for Superconducting Magnet Team Superconducting Helical Solenoids.
Chapter 22 Alternating-Current Circuits and Machines.
Electromagnets!Electromagnets! By Jack and Bella.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
BEX – Basic Electricity – Unit 13 Magnetic Motors REF: Delmar’s Standard Textbook of Electricity, Unit 13.
DC Machines.
Forging new generations of engineers. DC Motors and Generators Instruction Plan.
Welcome to Physics Jeopardy Chapter 18 Final Jeopardy Question Magnetic fields 100 Electro magnetic Induction Motor Transformers
II. Uses of Magnetic Fields (p ) Electromagnet Speaker Motor
ELECTROMAGNETISM. ELECTROMAGNETISM ????? ELECTROMAGNETISM THE BRANCH OF PHYSICS THAT DEALS WITH THE RELATIONSHIP BETWEEN ELECTRICITY & MAGNETISM.
1 Institute of Mechatronics and Information Systems Control and Driving Systems.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
ELECTROMAGNETIC INDUCTION
15 ELECTROMAGNETIC MACHINES Magnetic field patterns Investigate patterns of magnetic fields lines around magnets, wires and coils.
They are broadly classified as:
Alternating and Direct Current Direct Current (DC) is the one way flow of electrical charge from a positive to a negative charge. Batteries produce direct.
Motors and Generators.
DC Machines and Drives . Books
APHY201 1/4/ Induced EMF   A changing magnetic field will induce an emf which produces a current.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
ELEC 3105 Basic EM and Power Engineering Rotating DC Motor PART 2 Electrical.
General power system. objective Review general energy and power system Application of fundamental knowledge of principal machines, transformer and other.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
1 MQXF(S) Magnet Interface Document MQXF(S) magnet interface document will describe electrical connection between the magnet and the header assembly Scope.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
HQ02A2 TEST RESULTS November 7, 2013 FERMILAB. HQ02 test at Fermilab 2  First HQ quadrupole with coils (#15-17, #20) of the optimized design o Only coil.
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
DC MACHINES Maxwell’s Cork screw Rule :
Instrument Clusters Topics covered in this presentation:
EE Iowa State University
PREPARED BY: Group-D Ramavat Nikunj ( )
CNC FEED DRIVES.
Chapter Electromechanical Systems 6. Chapter Electromechanical Systems 6.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Electricity and Magnetism
T5.2: Harmonization - Material and Component Reference
Different Types of Relays.
Produktentwicklung und Maschinenelemente
Superconducting Helical Solenoids
What is a Motor?
Faraday’s Discovery.
Producing Electric Current
Generators.
Presented By Abu Syed Md. Jannatul Islam Lecturer, Dept. of EEE
Experimental equipment Edgar L. Black February 17, 2019
Electricity and Magnetism
as a prototype for Super c-tau factory
II. Uses of Magnetic Fields (p ) Electromagnet Speaker Motor
Presentation transcript:

Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance Period (stage) and Institution General List of Tasks by Performance Period (stage) and Institution 5/1/2014 V11 Project is 18 months total, with 3 stages of 6 months each. Participating Institutions are Fermilab (FNAL) as principal, for ~60% of effort Brookhaven (BNL) for ~32% of effort Florida Institute of Technology (FIT) for ~8% of effort Project is 18 months total, with 3 stages of 6 months each. Participating Institutions are Fermilab (FNAL) as principal, for ~60% of effort Brookhaven (BNL) for ~32% of effort Florida Institute of Technology (FIT) for ~8% of effort

FNAL Stage 1: Order SC / cable and parts for the field coils. Prepare engineering drawings for the field coil assembly and demo device. Start the winding and vacuum impregnation of the field coils. Prepare progress report. BNL Stage 1: Order SC / cable for the inner and outer armature coils. Order temperature sensors and required instrumentation for data acquisition. Prepare engineering drawings for winding the inner & outer armature coils (to include temperature sensors. ) Program the direct wire machine for winding the armature coils. Prepare progress report. FIT Stage 1: studies and planning listed on next slide FNAL Stage 1: Order SC / cable and parts for the field coils. Prepare engineering drawings for the field coil assembly and demo device. Start the winding and vacuum impregnation of the field coils. Prepare progress report. BNL Stage 1: Order SC / cable for the inner and outer armature coils. Order temperature sensors and required instrumentation for data acquisition. Prepare engineering drawings for winding the inner & outer armature coils (to include temperature sensors. ) Program the direct wire machine for winding the armature coils. Prepare progress report. FIT Stage 1: studies and planning listed on next slide 5/1/2014 V12

FIT Stage 1: (months 1-6) a. Create finite element models of demonstration machine for electromagnetic, mechanical and thermal analysis. b. Electromagnetic study: magnetic field, coil inductances, Lorentz forces on coils, flux linkages, generated power. c. Initial thermal model study: Using empirical values of the expected energy deposition due to AC losses in the specified armature conductor at various frequencies, compute temperature profiles in armature coils. d. Test plan: Develop the portion of the test plan required to obtain the temperature gradient data from the testing at the FNAL VMTF and processing the data. d. Test equipment: Establish requirements and specify equipment for mechanical drive required for testing the generator at various rotational speeds. Develop circuitry to measure and absorb output power from generator test. Include requirements for mounting the test equipment on the top plate of the VMTF at FNAL. e. Coordinate efforts with Goodzeit and Ball as required for demonstration machine design, temperature dependent materials properties, initial energy deposition estimates and documentation. f. Prepare Progress Report. FIT Stage 1: (months 1-6) a. Create finite element models of demonstration machine for electromagnetic, mechanical and thermal analysis. b. Electromagnetic study: magnetic field, coil inductances, Lorentz forces on coils, flux linkages, generated power. c. Initial thermal model study: Using empirical values of the expected energy deposition due to AC losses in the specified armature conductor at various frequencies, compute temperature profiles in armature coils. d. Test plan: Develop the portion of the test plan required to obtain the temperature gradient data from the testing at the FNAL VMTF and processing the data. d. Test equipment: Establish requirements and specify equipment for mechanical drive required for testing the generator at various rotational speeds. Develop circuitry to measure and absorb output power from generator test. Include requirements for mounting the test equipment on the top plate of the VMTF at FNAL. e. Coordinate efforts with Goodzeit and Ball as required for demonstration machine design, temperature dependent materials properties, initial energy deposition estimates and documentation. f. Prepare Progress Report. 5/1/2014 V13

FNAL Stage 2: (months 7-12) Complete the winding and vacuum impregnation of the field coils. Assemble field coils onto strong back fixture. Test field coil assembly for quench properties, transfer function, inductance. Fabricate components for demo device. Design and fabricate components for test stand. Start assembly of the demo device. Liaison with FIT re device test equipment. Prepare progress report. BNL Stage 2: (months 7-12) Wind the inner and outer armature coils. Test armature coils for quench properties, transfer function, inductance. Test armature coils for performance of temperature sensors. Ship completed armatures to FNAL. Prepare progress report. FNAL Stage 2: (months 7-12) Complete the winding and vacuum impregnation of the field coils. Assemble field coils onto strong back fixture. Test field coil assembly for quench properties, transfer function, inductance. Fabricate components for demo device. Design and fabricate components for test stand. Start assembly of the demo device. Liaison with FIT re device test equipment. Prepare progress report. BNL Stage 2: (months 7-12) Wind the inner and outer armature coils. Test armature coils for quench properties, transfer function, inductance. Test armature coils for performance of temperature sensors. Ship completed armatures to FNAL. Prepare progress report. 5/1/2014 V14

FIT Stage 2: (months 7-12) a. Thermal model study: Complete temperature profile studies. Prepare analytical models to compute the energy deposition in a unit volume of the armature coils from temperature sensor data at the specific locations in the armature coils. This will be used to compare the predicted and measured results. b. Participate in testing the armature coils at BNL for involvement in data acquisition and processing data of the temperature sensors. c. Complete the fabricating and in house testing of the generator test equipment and deliver to FNAL. d. Coordinate efforts with Goodzeit and Ball for technical support and documentation services. e. Prepare progress report. FIT Stage 2: (months 7-12) a. Thermal model study: Complete temperature profile studies. Prepare analytical models to compute the energy deposition in a unit volume of the armature coils from temperature sensor data at the specific locations in the armature coils. This will be used to compare the predicted and measured results. b. Participate in testing the armature coils at BNL for involvement in data acquisition and processing data of the temperature sensors. c. Complete the fabricating and in house testing of the generator test equipment and deliver to FNAL. d. Coordinate efforts with Goodzeit and Ball for technical support and documentation services. e. Prepare progress report. 5/1/2014 V15

FNAL Stage 3: (months 13-18) Complete assembly of the demo device. Set up demo device in vertical test facility dewar. Perform designated test plan, with FIT assistance. Implement market/commercialization plan Prepare progress report. Prepare final project report. BNL Stage 3: (months 13-18) Participate in demo device tests at FNAL. Prepare progress report. FNAL Stage 3: (months 13-18) Complete assembly of the demo device. Set up demo device in vertical test facility dewar. Perform designated test plan, with FIT assistance. Implement market/commercialization plan Prepare progress report. Prepare final project report. BNL Stage 3: (months 13-18) Participate in demo device tests at FNAL. Prepare progress report. 5/1/2014 V16 FIT Stage 3: (months 13-18) a. Generator testing: Participate in the testing program at FNAL for the acquisition and processing of the temperature sensor data using the supplied equipment according to the developed test plan. b. Data processing and analysis: Combine analytical and measured test results in a final report form with conclusions relating to the results of this research. c. Coordinate efforts with Goodzeit and Ball for technical support and documentation services. FIT Stage 3: (months 13-18) a. Generator testing: Participate in the testing program at FNAL for the acquisition and processing of the temperature sensor data using the supplied equipment according to the developed test plan. b. Data processing and analysis: Combine analytical and measured test results in a final report form with conclusions relating to the results of this research. c. Coordinate efforts with Goodzeit and Ball for technical support and documentation services.