P-bar d-cel: keV antiproton pulses David Lunney CSNSM (IN2P3-CNRS) Université de Paris Sud, Orsay  introduction and concept  p-bar d-cel simulations.

Slides:



Advertisements
Similar presentations
What is the ISOLDE cooler RFQ CB - ISCOOL H. Frånberg.
Advertisements

H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS.
PSSC Space Instrument Laboratory Plasma instrument calibration system provides an ion beam of energy range up to 130keV/charge in a clean room To develop.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Carbon Injector for FFAG
TRImP in-flight separator, ion catcher and RFQ cooler/buncher
16 – 17 Jul 02Andrew Werner TRD Monitor Tube Readout Electronics: Shaping Peter Fisher, Bernard Wadsworth, Andrew Werner MIT 1.
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 An EBIS-based RHIC Preinjector - Test EBIS Results Ed Beebe Preinjector Group Collider-Accelerator.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
L. Liszkay IRFU CEA Saclay, France GBAR collaboration
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
CERN ISOLDE facility 1 HIE ISOLDE – Workshop 2013 Targets and Front Ends “A new modulator system” Contribution: by T.Fowler, J.Schipper, B.Bleus, T.Gharsa/TE-ABT-EC.
Mass measurements using low energy ion beams -1- C. Thibault 31 mars 2004 Motivations to measure masses Present status Experimental methods for direct.
MR-TOF at ISOLDE Frank Wienholtz - University of Greifswald - for the ISOLTRAP Collaboration GUI –
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
Power Supply System for DRFS
A new RFQ cooler: concept, simulations and status Trapped Radioactive Isotopes:  icro-laboratories for Fundamental Physics E. Traykov TRI  P project.
A mass-purification method for REX beams
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
Summary of MM meeting at CEA Saclay, 25/26 Jan 2010 Some selected topics.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
ELENA Fast Deflectors Generators N.Voumard, T. Gharsa.
RF source, volume and caesiated extraction simulations (e-dump)
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
22 Set 2009 EPPC 09 CERN September /14 Solid-State MARX Type Circuit for the ISOLDE Target Voltage Modulator L.M. Redondo*, J. Fernando Silva.
Developments of the FETS Ion Source Scott Lawrie.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
TRI  P RFQ design, simulations and tests E. Traykov TRI  P project and facility RFQ tests and design Simulations Conclusion TRI  P Group: G.P. Berg,
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
KIT - The cooperation of Forschungszentrum Karlsruhe GmbH and Universität Karlsruhe (TH) Florian Fränkle EPS HEP 2009 Krakow 1 KATRIN: An experiment to.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
Kévin Pepitone 1CLIC workshop, CERN, January 2016 Kevin PEPITONE, BE-RF LEETCHI: Drive Beam Electron Source.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
Proposal to the INTC, 21. May 2007
Traps for antiprotons, electrons and positrons in the 5 T and 1 T magnetic fields G. Testera & Genoa group AEGIS main magnetic field (on axis) : from Alexei.
Calorimeter Mu2e Development electronics Front-end Review
A. Martynov on behalf of accelerator division.
Options and Recommendations for TL and Dumps
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Physics design on Injector-1 RFQ
Technical Session CERN ISOLDE – Workshop 2016
Development of the DC Electronics for the TAMUTRAP RFQ Cooler/Buncher Louis Cooper Cyclotron Institute Texas A&M University.
CTF3 kicker activities at CIEMAT
Junji Urakawa (KEK) for ATF International Collaboration
H- Ion Source Development
a) For the trace, determine
Advanced Research Electron Accelerator Laboratory
Physics Design on Injector I
(Beam) Commissioning Plan
Cooling of C6+ ion beam with pulsed electron beam
Improvement of a dc-to-pulse conversion efficiency of FRAC
Presentation transcript:

p-bar d-cel: keV antiproton pulses David Lunney CSNSM (IN2P3-CNRS) Université de Paris Sud, Orsay  introduction and concept  p-bar d-cel simulations   consequences on GBAR layout With crucial help from: V. Manea, S. Cabaret, P. Dupré, S. Dephine (CSNSM) and Robert Wolf (U. Greifswald)

From ELENA: 100 keV p pulse 300 ns (1.3 m) 4  mm mrad deceleration and pulsed drift tube: concept - 99 kV 1 keV 0.2 m 40  mm mrad drift tube - 99 kV 1-keV p pulse

SIMION simulations by Vladimir Manea deceleration and pulsed drift tube: simulation

Transport from decelerator to reaction chamber (GIOS)

Full simulations of antiproton deceleration and focusing One single simulation of the 3 m path of the ions from the entrance to the deceleration setup to the injection into the positronium chamber. Optimization of the deceleration and focusing voltages, as well as of the setup geometry, for a maximum transport efficiency through the positronium chamber (preliminary value 15%). Deceleration Focusing SIMION simulations by Vladimir Manea

prototype instrument at the CSNSM, Orsay (March 2012)

8 5-10ms ms ms ms ms ms ms 1-30ms ISOLTRAP spectrometer at ISOLDE (2 Penning, 1 Paul, 1 MR-tof trap) 60-kV, 1-kHz pulsed drift-tube switch

Exotic nuclides and anti-matter major difference: buffer gas!

16/02/2012ISOLTRAP Collaboration meeting 2011 HV-switch circuit M500nF 5k 75→175 t U τ=1.1us t=11us τ=40ns t=400ns Heinzinger PNChp ±60kV, 10mA dU<10 -5 U nom /8h; dU rf,pp <10 -5 U nom ; dU temp <10 -5 U nom /K communication: GPIB, RS232, analog Heinzinger PNChp ±60kV, 10mA dU<10 -5 U nom /8h; dU rf,pp <10 -5 U nom ; dU temp <10 -5 U nom /K communication: GPIB, RS232, analog 220pF Behlke HTS GSM, 65kV, 100Apk dV drop < 60kV

16/02/2012ISOLTRAP Collaboration meeting 2011 New HV-switch parts 11 Behlke HTS GSM + direct liquid cooling (DLC)* Behlke HTS GSM + direct liquid cooling (DLC)* Switch Radiator Pump Buffer capacitor and RF-sealed copper housing Buffer capacitor and RF-sealed copper housing 500nF 60kV 900J 500nF 60kV 900J *GALDEN HT135 Heinzinger PNChp 60kV, 10mA 200MOhm resistor

16/02/2012ISOLTRAP Collaboration meeting 2011 HV-switch present status and performance 12 Power dissipation and load capacitance extrapolated to 200Hz Maximum power dissipation at around 1200Hz switching frequency

16/02/2012ISOLTRAP Collaboration meeting 2011 HV-switch present status and performance 13 peak shape with old setup peak shape with new setup taken from Zn run large tail close to gaussian shape 80 Rb 80 Zn no tail

16/02/2012ISOLTRAP Collaboration meeting 2011 HV-switch present status and performance 14 under-critical damping: increasing resistance necessary 75 Ohm → 175 Ohm

16/02/2012ISOLTRAP Collaboration meeting 2011 HV cage reassembly 15 Alkali ion source HV switch setup RFQ Buncher HVpd 60kV FUG HVcage

16/02/2012ISOLTRAP Collaboration meeting 2011 HV cage reassembly 16 Alkali ion source HV switch setup RFQ Buncher 60kV FUG HVcage 60kV Heinzinger HVpd dU via CS class* * by Christopher

HV-switch Safety Dividing the HV cages demands a separate safety installation for the HV-switch cage: If VETO is set, LOW status is active -> HVpd=0V switch and cooling controller Trigger & Veto terminal Control SystemTPG 300 pressure Center 3 pressure p Buncherp drift tubetrigger Behlke switch Cooling system Tacho Pump and Fan speeds Temp.: Fore, Back, Pump Pump and Fan statustrigger IN VETO 1-4 optional: trigger optical OUT and trigger TTL OUT (manual reset button) trigger optical IN trigger TTL IN direct trigger trigger IN status OUT: Temp, Freq., DC switch status optical 5V DC power supply 5V DC IN 9V DC power supply switch status monitor 24V DC power supply Line voltage attached to cooper box grounding 16/02/201217

GBAR layout issues

Extraction from ELENA in a short straight section 25 January 2012 CERNTransfer line WS / Pavel Belochitskii 20

beam transport energy: 60 keV

H + Production SiO 2 coatin g fast extraction from trap Ortho-positronium

 GBAR – reaction chamber trajectories p p H H+H+ e e ? ? ?

AD1-5?

16/02/2012ISOLTRAP Collaboration meeting 2011 Summary 32 Decelerator Pulsed drift scheme: start from working instrument (60 kV) First simulations show phase space conserved transmission not disastrous (35%) Layout issues Question: are H+, p-, e+ beams interesting for others? Extraction and transport part of ELENA (i.e. resp. CERN)? Positioning of equipment… different extraction segment? rotating ELENA? increasing ELENA kicker-bender angle? adding multipoles?

AD1-5?

ELENA layout in AD Hall 25 January 2012 CERNTransfer line WS / Pavel Belochitskii

16/02/2012ISOLTRAP Collaboration meeting 2011 HV-switch modification 40 old circuit:new circuit: Design objectives:  Repetition rate up to 60kV  Stable high-voltage potential  Safety, Reliability Challenges:  Power dissipation: up to 600W  RF-noise Drawbacks:  Repetition rate max. 3Hz  dropping HVcage potential  (Leakage current issue)