1........... ATN 2001 18-19 September 2001 American Airlines Data Link... Frank Cheshire / Andy Fry.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
FANS (Future Air Navigation System) Flight Crew Procedures
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
GLOBALink/VHF Digital Link Mode 2
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
COCKPIT WEATHER UPLINK CARL R. KNABLE MGR. METEOROLOGY UNITED AIRLINES.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
ATN 2001, London - 18 Sep 01 1 PETAL II Extension Architecture, Integration and Testing Prepared by Martin Adnams/Isabelle Herail.
CPDLC Build 1A and CPDLC Benefits Timothy R. Hancock CPDLC Operations Lead FAA Free Flight Program Office ATN 2002 London, England September 24, 2002.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Next Generation Air/Ground Communications (NEXCOM) Program Presented to Airborne Internet Collaboration Group Reston VA April 17, 2003 Dieter Thigpen Integrated.
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Data Link Communications
Use Case Diagram. # 1 Provide Pre-flight Services Actors: Pilot, External Data Providers, FBO, FAA Goal Level: User Level Main Success Scenario 1.Client.
Aircraft Communications Addressing and Reporting System
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
Rob Mead PETAL-II Trials & Project Manager Eurocontrol, DIS/ATD
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
DCIT / Media Management Session FAA DataComm – OTA FANS Validation Airbus FANS comm media management 17 Nov 2011Airbus FANS comm media management Presented.
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
10 Dec 15 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone)
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
Air Traffic Control Communication
Presented By: Peter Muraca FAA Technical Center Atlantic City, NJ USA
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications
International Civil Aviation Organization
Presented by Thales Avionics ATN 2003 London, UK September 2003
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ATN/VDL Mode 2 Implementation Status
NEXCOM Next Generation Air/Ground Communications Appendix G
Data Communications Program
NEXCOM by Bruce Eckstein FAA.
NEXCOM by Bruce Eckstein FAA.
Southwest airlines Phone Number
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
Presentation transcript:

ATN September 2001 American Airlines Data Link... Frank Cheshire / Andy Fry

2 The Path to PETAL Certification & Operations Approval CDG Operations –Not your basic routine flights –Good support a key Non-revenue test profiles –Data collection –Response to problems Operational sector operations Results

3 Certification & Ops Approval Supplemental Type Certificate (STC) –AAL was the applicant, issued 6/06/01 –Applies to the B with Pegasus FMC and Rockwell Collins avionics package: CMU VHF VHF Digital Radio (VDR) APM Operations Approval –Issued mid-August –Triggered start of revenue flying

4 Charles de Gaulle Operations Airframe Scheduling Routing & Coordination –Non-standard routing and short flights –Lots of coordination Kudos to lots of people/organizations –Internal to AA –Eurocontrol –CFMU and CDG ATC personnel

5 Non-Revenue Test Profiles Objectives outlined by Eurocontrol –Specific profiles to establish system performance Avionics performance with “operational” ground network Ground network The Controller’s end –Troubleshooting Profiles modified or repeated to check “fixes” Aircraft variables Lots of data collected

6 Flight Log 07:25:59 (AVLC) INFO (P=0) N(s)=4 N(r)=6 A/G=1 Source Addr: 0x5102b1a, Dest Addr: 0x1a4a445 Frame Data: b a a 59 c8 1b ff e '.H....jY...f....' ee ee '......G.'.XAA...' ee 00 2b ac 14 2b c2 00 ' ' 07:25:59 (VDL) SQP.indication=0, Source Addr: 0x5102b1a ROUTER MOBILE_ISH_IN 11/07/01 07:25:59 ARINC "584141EE002B" 1800 " EEEEEE002B0200AC142BC200"RIF ISH_IN 11/07/01 07:25:59 ARINC " EEEEEE002B0200AC142BC200" "584141EE002B"07:25:59 (AVLC) RR (F=0) N(r)=5 A/G=0 Source Addr: 0x1a4a445, Dest Addr: 0x5102b1a Frame Data: a 58 b a3 a1 '..jX.H ' 07:26:44 (AVLC) INFO (P=0) N(s)=5 N(r)=6 A/G=1 Source Addr: 0x5102b1a, Dest Addr: 0x1a4a445 Frame Data: b a a 59 ca 1b ff e '.H....jY...h....' ee ee '......G.'.XAA...' ee 00 2b ac 14 2b c2 00 ' ' ROUTER MOBILE_ISH_IN 11/07/01 07:26:44 ARINC "584141EE002B" 1800 " EEEEEE002B0200AC142BC200"07:26:44 (VDL) SQP.indication=0, Source Addr: 0x5102b1a

7 Operational Sector Ops The Pay-off ! – Controller-Pilot data link communications

8 Results The “good” news - VDLM2 works ! The “other” news - there is room forimprovement –Technical and operational suitability issues 21 Non-revenue test profiles flown Started data link with operational sectors on 17 August, it is continuing PETAL an excellent proving ground Next step - FAA Build I in Miami next year

9 Upper E I C A S

10 Logon Status Page

11 M C D U Display

12 Uplink Message

13 A T C Log

14 Brain Trust ?

15 Questions ?

16

17