Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,

Slides:



Advertisements
Similar presentations
Energy spectrometer cavity BPM Royal Holloway, University of London S. Boogert, G. Boorman University of Cambridge M. Slater, M. Thomson & D. Ward University.
Advertisements

ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Philip Burrows CLIC MDI Meeting 6/11/091 Design issues for IP intra-train feedback Philip Burrows John Adams Institute Oxford University.
Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 December 2003 run results Philip Burrows.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD ATF / ATF2 ESA Miscellaneous FONT.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
BPM for FF test (ATF2) Vladimir Vogel KEK 2nd Nano Workshop, KEK, December 12, 2004.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
CLIC-UK Programme Status Philip Burrows John Adams Institute Oxford University 1.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
Development of a High Resolution Cavity BPM for the CLIC Main Beam
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Talitha Bromwich, Glenn Christian, Colin Perry, Rebecca Ramjiawan John Adams Institute,
Philip Burrows X-band 2010 Daresbury 2/12/101 Advanced beam feedback systems Philip Burrows John Adams Institute Oxford University.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Summary WG8: Beam Diagnostics, Instrumentation and Technical Systems
CLIC Workshop 2016: Main Beam Cavity BPM
BPM development at ATF/CLIC
CLIC-UK Oxford Activities
CLIC Drive Beam Stabilisation
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
Fabrication of KEK-ATF2 Q-BPM
FONT stripline BPM resolution
Presentation transcript:

Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba, Alexander Gerbershagen, Young Im Kim, Colin Perry, Jack Roberts John Adams Institute Oxford University Drive Beam BPMs

Opportunity Need for cost-effective design for tens of thousands of drive beam BPMs Strong UK expertise on cavity (RHUL) and stripline (Oxford) BPMs Working systems (at ATF2) with excellent performance

Opportunity Need for cost-effective design for tens of thousands of drive beam BPMs Strong UK expertise on cavity (RHUL) and stripline (Oxford) BPMs Working systems (at ATF2) with excellent performance ATF2 stripline BPMs single-pass beam bunch Q ~ 1 nC 330 nm rms

Opportunity Need for cost-effective design for tens of thousands of drive beam BPMs Strong UK expertise on cavity (RHUL) and stripline (Oxford) BPMs Working systems (at ATF2) with excellent performance Thibaut + Manfred strongly supportive: new student working on: design of cost-effective BPM based on existing experience, exploring reasonable possibilities (striplines, buttons, coaxial … )

Future work proposal –Study of low cost BPM pickup alternatives. –Study of the PETS RF power EMI at the pickup location  Theoretical (EM simulations) and practical (CLEX beam) –Compare different BPM types, including costs and performance  Stripline, button, coaxial and other “exotic” designs –Evaluate read-out electronics for a cost/performance optimized DB BPM pickup. –Design, prototype, and install a prototype DB BPM system in CLEX  Perform beam studies and demonstrate to meet the required performance, e.g. 2 μm resolution.

Old example (NLCTA)

7 FONT2 beamline installation at SLAC NLCTA (65 MeV 170ns-long 87ns spacing) Dipole and kickers New BPMs

Future proposed resources Full-time PhD student (Oxford) Supported by Oxford and RHUL: Perry, Lyapin (electronic engineers) Burrows, Christian, Boogert (faculty)

Deliverables and milestones –2014  Revisit the goals of the Drive Beam BPM R&D  Investigation of various BPM pickup types, based on simulations. –2015  Present an optimized DB BPM pickup design, including critical parts of the signal processing, i.e. rejection of unwanted 12 GHz RF power. –2016  DB BPM prototyping for CLEX  Stretched wire and RF bench tests of the BPM pickup  Read-out electronics prototyping  First beam studies at CLEX –2017  Finalizing beam studies at CLEX  Summary report on the Drive Beam BPM R&D