Kurran Kelly – Lead Designer Silas Van Natter – Team Lead Josh Van Patten – Team Budget Manager Brandt Pedrow – Team Liaison and Recorder Branden Bakken.

Slides:



Advertisements
Similar presentations
Android Enabled Camera Positioning system Design Team 3 Chris Sigler Yan Sidronio Ryan Popa Jeremy Iamurri Austin Fletcher Facilitator: Dr. Oweiss Sponsor:
Advertisements

Autonomous Underwater Vehicle Sponsor: NAVSEA Keyport Mentor: Mike Kapus Ben Brand, Kendra Brower, Joe Langevin, Jeffrey Le To power our vehicle, we have.
Robot Construction For Competition Sustainability Tommy Earley Palmetto Regional FIRST Kickoff Event January 5, 2013.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
GPS Vehicle Tracking/Payload Release System For Small UAV Project Team
Chapter 33 Charging System Fundamentals.
P09011 Object Recognition Detailed Design Review February 12, 2009.
EE 396/496 Scout ROV by Chris McLeod & Autonomous Systems Lab.
The Team Lincoln Cummings (IE) – Project Manager Joe Calkins (ME) – Chief Engineer Mark Fazzio (ME) – Technical Writer Allison Studley (ME) – Minutes.
R I T Team Members: Dan Lester → Team Lead Chris Feuerstein → Lead Engineer/Electrical Lead Mike Schwec → Electrical Support Jacob Hillmon → Electrical.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
P08456-LED Lighting for an Underwater ROV Jeremy Schiele-Project Manager Jonathan Lent-Mechanical Engineer Ryan Seeber-Computer Engineer Justin VanSlyke-Mechanical.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Critical Design Review Colorado State University - Pueblo April 15, 2005.
Printed Circuit Board Design
Redesign of a Submersible Autonomous Data Collection and Transmission System (S.A.D.C.A.T.S.) Group Members: Matthew Rhoads BS ME (Lead) - Ballast, Hull.
DECEMBER 12 TH, 2013 P14311: Gate Review. Agenda Overview of PCB Isolation Routing System Design  20 minutes Review of Bill of Materials and Sourcing.
Local Motion Marco Maffeo-Robinson Sean Horning Justin White Ross Ziskind Tom Kidd Advisor: Professor Coleman Company Contact: Brian Costello.
David Talaiver Vince Adams Robb Morris. Misson 2010 AUVSI ASV Competition Develop interest in marine robotic systems Provide opportunities for student/industry.
Infosession UNIVERSITY OF TORONTO MECHATRONICS DESIGN ASSOCIATION.
Full Mission Simulation Report New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Ethan Hayon, Mark Siembab, Mike.
Mechanical Engineers: Brian Church Tyler Breitung Michael Oplinger Electrical Engineers: Anthony Salmin Ross Bluth Stephen Mroz Sponsor: Dr. Roman Press.
The Water Benders Final Presentations. Outline Introduction Project Description Motivation Problem Statement Objectives Customer Requirements Design Concepts.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Given a diagram students will write the name of the external components of the computer in the blank next to the corresponding with a criterion of 100%
Robotic Backhoe with Haptic Display Design Overview
Milestone #4 Test Plan & Conceptual Design Review Group 4 Victoria Jefferson Reece Spencer Andy Jeanthenor Yanira Torres Kevin Miles Tadamitsu Byrne 1.
Construction of an Avionics Box for a Non-Prehensile Robot Chris Swanson - Vermont Space Grant, Vytas SunSpiral - Intelligent Robotics Group.
Milestone #2 Project Proposal Group 4 Victoria Jefferson Reece Spencer Andy Jeanthanor Yanira Torres Kevin Miles Tadamitsu Byrne 1.
MDA Info Session General Meeting: Information & Recruitment Sept 19, 2012: 7-8pm Mechatronics Design Association General Info Session Sept 2012.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
TEAM 6: JAWSS TEAM 6: JAWSS A Design Project Presentation Team 6 members: Louise McGowan Ken Millard Daniel Rice Kevin Pearce Joint-service Active Watch.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr.
Flight Readiness Review Student Launch Initiative SCS Rocket Team Statesville Christian School April 2, 2008.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Automated Bridge Scour Inspection FSU/FAMU College of Engineering Team 7 Proposal 10/27/2010.
CS-EE 481 Spring Swift-Fox Founder’s Day, 2005 University of Portland School of Engineering Imagine the ability to view and record Up to five different.
PRINCIPLES OF OPERATION
Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.
© 2012 EnMasse Industrial Design LLC Case Study: 3G/4G Wireless UpLink Solution for Broadcasting.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
Scrumm meeting. Mechanical Done. Tire vs belt? Tire chosen. What to do? Do a prototype of a car. Continue with design.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Electricity and Magnetism
RequirementMethodStatus The payload must not exceed a weight of 1.45 Kgm.Design, Test The payload must conform to the WFF “no volt requirement”
Randy Draeger Grant Stockton David Upp
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Project: P08371 Portable Command Post Rick Chadwick ME Harith Wijetungage IE Scott Pudlewski EE Sponsors: Technet Global Services DiLorenzo Electronics.
P11008 ArcWorks Straw Cutting Device May 13, 2011 Ian Balbresky-ME/Pneumatics Lead Tyler Banta-ME/Design Lead Matthew Estock-ISE/Project Manager Mark Vaughn-ME/Fabrication.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
S A Griffiths CM42 June 2015 Electrical & Control.
Figure 1: Potential sensor behavior; As the CO 2 levels drop in the chamber, the output voltage drops Figure 2: Response of circuit to CO 2 sensor input.
Modular R.O.V for Sub-Sea Operations
Printed Circuit Board Design
Topics covered in this presentation:
SQUIGGLE NANOMANIPULATOR
Electromagnetism Lenz’s Law.
Tablesat iid Kavin Kang, Matthew Coronis,
Electromagnetism Lenz’s Law.
Manufacturing Processes
Presentation transcript:

Kurran Kelly – Lead Designer Silas Van Natter – Team Lead Josh Van Patten – Team Budget Manager Brandt Pedrow – Team Liaison and Recorder Branden Bakken – Team Website Manager 1

Mechanical Targets Size Fits in a 72x36x36 in Box Currently about 35x15x15 Weight Must be under 120 pounds Aiming for 40 pounds Actions Drop a Marker Shoot a projectile 5 feet Grasp object from below 3 planes of Thrust Knock a pipe off pegboard Positioning Cameras down and forward In-line with torpedoes and droppers Separate battery pod Compass away from magnetic interference Features Easy access to electronics Watertight enclosure Even and minimal drag Dynamically and statically stable Very configurable Slightly positive buoyancy Convenient carrying by two people Crane hooks Heat mitigation Condensation and leak mitigation External switches 2

What We Need To Know Now Mini Computer Are we going to use one or not? Hydrophone What are your ideas for Circuit Boards? Size and appearance of the hydrophone droppers? Is there a location that you would want to see us place them? 3

Current Design 4

5

Frame Sub- Assembly 6

Current Design Circuits and Circuit Rack Sub- Assembly 7

Current Design Torpedoes, Cameras, & Marker Droppers Sub- Assembly 8

Components The slides under “Components” are showing what we know we must mount to the circuit rack inside the circuit tube. Power Supply Board Motherboard and Hard Drive 9

Components Cont’d Sabertooth Motor Controllers (x3) Depth Sensor, Compass, Gyroscope, Accelerometer WSU/Digilent Board 10

Components Cont’d CO2 Canister and Regulator Pneumatic Solenoids and Manifold 11

Connectors 12

Battery Box Box cartridge design with internal sealing Hot swappable No need to open for battery changing or charging Stackable 13

Battery Box 14

Senior Lab Experiment Old vs. New Thrusters Voltage Supplied vs. Force Created Forward and Reverse Operation Analyzing for Statistically Significant Differences between Forward and Reverse Thrust and Old vs. New Thrusters 15

Senior Lab Results Plot With Outliers 16

Senior Lab Results Plot Without Outliers 17

Milestones Project Learning / Research / Background End of September Designing / Prototyping End of November Order & Delivery of Parts Middle of January Construction of Mark 1 Sub Middle of February Mark 1 Design Evaluation End of February Mark 1 Testing End of March Time for Re-Design Middle of April Deliver Re-Design Middle of April Portfolio and Logbooks End of April 18

Expected Expenditures Acrylic Tubing and Sheet Already have 3/8” and ½” sheet purchased Several Electrical Underwater Connectors More Bosch Extruded Stock and Connectors For assembling the frame Plate Aluminum For machining the bulkheads and circuit rack O-Rings For external housings and bulkhead seals New Marker Droppers Also the ball bearings will be re-done Pneumatics System will get upgrades or full re-design Ready Rod (All-Thread) and Assorted Fasteners 19

What We Need To Know Now Mini Computer Are we going to use one or not? Hydrophone What are your ideas for Circuit Boards? Size and appearance of the hydrophone droppers? Is there a location that you would want to see us place them? 20

Questions For You Is there a certain location that you see specific circuits needing to be placed? On the circuit rack for your ease of use Out of our Mechanical Targets: Are there any more that you see us needing to account for? Do you have an accurate file for the Marker Droppers 21

Any Questions For Us? 22