Diagnostics – Periferals Analytical 920 LCSemi-Prep 940 LC.

Slides:



Advertisements
Similar presentations
Steering Systems Chapter 44.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
“Enerpak” Units » Propeller Type Fan » Size 100 – 400 MBH » 80% Thermal Efficiency » Natural or LP Gas » 10 Year Warranty on Heat Exchanger, Burners,
Daikin Altherma™ Troubling Shooting
January 7, 2013 Changing or replacing G460 sensors Slide 1 November 9, 2012 Changing or replacing G460 sensors.
Compact & Perfect for Your Satisfaction
Engineer Training Drum and Grippers TJ8300 / TJ8500 Drum and Grippers.
SOLAR TRACKER PROJECT. INTRODUCTION: Solar tracker is a system that is used to track sun light to increase the efficiency of electricity gained from solar.
The EX100 & EX1000 Oil in Water Monitors. The EX100/1000 Oil In Water Monitor Features 1.Continuous Flow and Accurate Measurement. 2.Measurement range.
Stepper Motors A stepper motor is a “pulse-driven” motor that changes the angular position of the rotor in “steps” Define –β = the step angle (per input.
Variable-Reluctance Stepper Motor Half-Step Operation Modify the sequence of the applied pulses A A&B B B&C C C&D D.
Stepper Motors A stepper motor is a “pulse-driven” motor that changes the angular position of the rotor in “steps” Define –β = the step angle (per input.
DataLogger Operation - 1 DataLogger ® Operation Procedures.
AUTOMATION & PRODUCTION TECHNOLOGY. PROJECTS Students learned about group dynamics and the Engineering Design Process How can we build the tallest structure.
Brakes.
Pressure Switches. New modulating and multi-stage furnaces are more complex and require that installation instructions and procedures be followed so that.
The new Super Multi from TCUK
COMPANY CONFIDENTIAL1 ECUreader – 5.40 Release Multibrand Diagnostics Product Management 29 August 2015.
Engineer Training Bridge System TJ8300 / TJ8500 Bridge System.
Equipment Sizing Preliminary Equipment Sizing for Capital Cost Estimation.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
Rev Simulator Theory and Operation. Rev n EACH BREATH TEST MUST BE PRECEEDED BY A REFERENCE ANALYSIS n REQUIRED BY THE CDPHE RULES AND.
Electronic Ratio Valve ERV
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Calibration Savvy. Calibration and Conformance  Calibration: Check a measurement against a known universally recognized standard to determine any deviation.
Diagnostics – Quaternary Pump & Fraction Collector Analytical 920 LCSemi-Prep 940 LC.
Status of COBRA Magnet Wataru OOTANI MEG review meeting July 11 th, 2003 PSI Switzerland.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
900-LC P. van Poppel – Field Support Specialist October 2009.
VARIAN, INC. HPLC Products
MICE Target - Risk Lara Howlett University of Sheffield.
HPLC Installation Petro van Poppel – Field Support SpecialistMarch 2010.
STEPPER MOTORS Name: Mr.R.Anandaraj Designation: Associate. Professor Department: Electrical and Electronics Engineering Subject code :EC 6252 Year: II.
ProStar 500 CVM P. van Poppel – Field Support Specialist October 2009.
The 900 series LC Analytical 920 LCSemi-Prep 940 LC.
HPLC Introduction & Safety P. van Poppel – Field Support SpecialistMarch 2010.
Varian Integrated HPLC Systems (iHPLC) Frankie Button HPLC Instrument Manager, Europe Region 1 November 2007.
Diagnostics – Detectors Analytical 920 LCSemi-Prep 940 LC.
WHIRLPOOL STEAM WASHER Presented by: Rick Kuemin, MSA Training Director Brought to you by:
Introduction to training
Shutter pushpull schematic2.ppt Present Manual Control System for Alcator C-Mod MSE Shutter (Schematic) We want to rotate the shutter into one of three.
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB Mk7 Expansion PCB.
msa samsung front load washer wf9100
New Product Developments World Leaders in Combustion Management Solutions New Products New Products.
440-LC Fraction Collector
Waters HPLC Competitive Review
Initialization 1Turn the power switches to both the heater controller and the viscometer on (up). 2On heater controller turn C/F toggle switch to F (degrees.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
Instrumentation I - Session 5 Session 5 - Agenda ActivityEst. Time 1. Agenda 2. Introduction to Primary Sensors, Transmitters and Transducers (Chapter.
Under the Guidance :- Mr.B. Suresh Babu (M.Tech) ELECTRONICS AND COMMUNICATION ENGINEERING Project Batch:- 18 D. Siva Sumanth (060429) K. N. V. Subrahmanyam.
The Troubleshooting Process. Hardware Maintenance Make sure that the hardware is operating properly.  Check the condition of parts.  Repair or replace.
Brooks Expert Support Tool (BEST) Software
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
3 phase MFDC SPOT WELDING MACHINE
Stepper Motors BJ Furman 23MAR2011.
30E & 30G STATOR TUBE REPLACEMENT
TECHNICAL TRAINING 2007.
August 23, 2000 R.N. Dubois Dow Chemical
Emergency Electrical Power Supply for Buildings
DC Motors The stator is the stationary outside part of a motor. The rotor is the inner part which rotates. Just as the rotor reaches alignment, the brushes.
AQT90 FLEX Service Training
Stepper Motors A stepper motor is a “pulse-driven” motor that changes the angular position of the rotor in “steps” Define β = the step angle (per input.
Diagnostics Analytical 920 LC Semi-Prep 940 LC
Varian 900-LC Series Galaxie Software
AQT90 FLEX Service Training
Presentation transcript:

Diagnostics – Periferals Analytical 920 LCSemi-Prep 940 LC

Modules

Fraction Collector Problems Movement Problems X, Theta and Z Movement Problems Communication Problems Self Test Sequence LED’s on Fraction Collector Electronics Problems Error Codes in Software

Column Heater/ Manual Injector Problems General Issues Heating Problems Communications Leaks Pressure

Scale Up Module Problems General Issues Leaks Pressure

MIB Problems General Issues Communications Power

IMS Fraction Collector Actions & Tests Divert valve replaced Tube Access Accuracy and Timing Test

IMS Column Heater/ Manual Injector Actions & Tests Injector valve stator replaced Injector valve rotor replaced Column valve stator replaced Column valve rotor replaced Column heater temperature accuracy and stability

IMS Scale Up Module Actions & Tests Injector valve stator replaced (SUM) Injector valve rotor replaced (SUM) Column valve stator replaced (SUM) Column valve rotor replaced (SUM)

IMS MIB Actions & Tests Backup the system configuration to a local folder Restore the system configuration from a previous backup Instrument Error Log Full System Test

Fraction Collector Practical Person 1: Replacement of X Encoder PCB, X Stepper Motor, X Timing Belt, Removal and Installation of Covers Person 2: Replacement of Theta Encoder PCB, Theta Stepper Motor, Power Supply Person 3: Replacement of Z Encoder PCB, Z Stepper Motor, Z Timing Belt, Z Shafts Replacement of Main PCB and Encoder Wheel Alignment

Heater/ Manual Injector & MIB Practical Person 1: Replacement of the Injector Valve Rotor and Stator Replacement of the Column Valve Rotor and Stator Person 2: Column heater temperature accuracy and stability Test Person 3: Perform a Backup and Restore on the MIB All: Perform a full system test

SUM & MIB Practical Person 1: Replacement of the Injector Valve Rotor and Stator Replacement of the Column Valve Rotor and Stator Person 2: Replacement of the Manual Injector Valve Rotor and Stator Person 3: Perform a Backup and Restore on the MIB All: Perform a full system test