FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.

Slides:



Advertisements
Similar presentations
HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Radiopharmaceutical Production Target Foil Characteristics STOP.
MICE Radiation Shield Design review for the proposed ‘Direct Drive’ MICE Spectrometer Radiation Shield 17/11/2011Norbert Collomb.
UNIT 13 : HEAT 13.1 Thermal Conductivity 13.2 Thermal Expansion.
Pepperpot Emittance Measurements of the FETS Ion Source
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Position [ mm ] Wire Current [ uA ] Results For the 1 mm solid wires, tungsten with the highest melting.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Japan-US Workshop held at San Diego on April 6-7, 2002 How can we keep structural integrity of the first wall having micro cracks? R. Kurihara JAERI-Naka.
Jan. 6, 2006 Chamber & Bellows IDR 1 LCLS Undulator Bellows Module Soon-Hong Lee Internal Design Review.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
RF-Accelerating Structure: Cooling Circuit Modeling Riku Raatikainen
LINEAR MEASUREMENT.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007.
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
UKNFIC meeting, 20 Oct 2005 – From Physics model to Engineering model Peter Savage From Physics model to Engineering model.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
27-28 March, CERNFP420m Brainstorming on Mechanics1 FP420m DETECTOR MECHANICS Jaak Lippmaa HIP, Helsinki University Mikk Lippmaa ISSP, Tokyo University.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
FETS Pepperpot Simon Jolly 10 th February The Pepperpot Beam segmented by intercepting screen with regular array of holes. Beamlets drift short.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
56 MHz SRF Cavity and Helium vessel Design
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Pepperpot Emittance Measurement System: Current Status Simon Jolly Imperial College FETS Meeting, 10/05/06.
Shock Tests on Tantalum and Tungsten J. R. J. Bennett, S. Brooks, R. Brownsword, C. Densham, R. Edgecock, S. Gray, A. McFarland, G. Skoro and D. Wilkins.
Bubble Chamber Radiator Thermal Analysis 5.0 MeV, 9.5 MeV Beam Energy Fredrik Fors Mechanical Engineering 8/20/2015.
RFQ Cold model manufacture, June 2006 Peter Savage The Front End Test Stand Collaboration 1 OFC RFQ Cold Model Manufacture The first step is to convert.
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
Leslie Jones Target Design Engineer Goran Skoro, Steve Lilley, (Stuart Ansell)– Neutronic Dan Wilcox – Engineering Simulation Dan Coates – CAD - TRaM ISIS.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
LCWS11 WG4 Fully featured accelerating structure engineering design
From Physics model to Engineering model
F.E.T.S. Mechanical Engineering Update
Four OTR Tasks.
Preliminary Y-chamber specifications – First draft
Pepperpot Emittance Measurements of the FETS Ion Source
EBTF Design Review Technical Meeting Group
Status of the Front End Test Stand April 2007.
FP420 Detector Cooling Thermal Considerations
Design of Distribution Feedbox at LHC P7
Pepperpot MkII assembly
What is Fin? Fin is an extended surface, added onto a surface of a structure to enhance the rate of heat transfer from the structure. Example: The fins.
LARP Phase II Secondary Collimator RC-1
Mechanical Engineering progress for the Front End Test Stand
Cu67 Isotope Radiator & Target
Presentation transcript:

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement device.

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 2 Mk I Emittance Scanner _____________________________________________________________________ Isometric view of the Mk I emittance scanner that was designed to fit on the ion source test bench at the Rutherford Appleton Laboratory. Support rods The ion source test facility vacuum tank Camera Moving rod Window Head Mounting flange

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 3 _____________________________________________________ The complete assembly mounted on the stainless steel flange. Mk I Emittance Scanner

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 4 Mk I Emittance Scanner – Head Design Exploded view of the head assembly Sliced view of the assembled head 10mm thick copper grid with a 25 x 25 array of 2mm diameter holes on a 3mm pitch. 0.3mm thick tungsten grid with 100 micron diameter holes Scintillator

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 5 Vacuum leak due to damage on sealing faces ___________________________________ Damage to the inner rod sealing ring, approx. 0.5mm wide and 0.5mm deep. ___________________________________ The rod has a scratch, approx. 05mm wide, 0.1mm deep, 30mm long.

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 6 Mk I was built and used successfully but also has experienced a few problems. It has been decided that we would benefit from a brand new emittance scanner with improvements made from what we have learned from the MkI. These improvements can be broadly split into three categories: 1) Stiffer support structure – apart from the obvious problems related to movement of the camera when mounted to a weak structure, I believe that the damage shown on the previous slide was due to the moving rod coming into contact with the main flange due to bending of the support structure. 2) Cooled head with a larger grid area – the MkI grid had 625 holes (25 x 25 array) on a 3mm pitch and hence covering 72mm square. This is less than the beam size. Also, damage appeared on the grid due to localised heating by the beam. While beam power is low there is no convection mechanism to cool the grids and so the MkII will have an active cooling system. 3) Improved vacuum seal – before the MkI became damaged the sealing onto the moving rod was working well but an improved vacuum design will be employed for the MkII that will also assist the cooling design. Mk I Emittance Scanner – Conclusion

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 7 The Mechanical Engineering Design of the Mk II emittance measurement device.

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 8 Mk II Emittance Scanner Light port Handle to be replaced with stepper motor Bellows mount + window clamp

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 9 _____________________________________________________________________ Mk II Emittance Scanner – Head design Tungsten Grid Glidcop Grid (aluminium dispersion strengthened copper) Copper grid cooling channel closing plate Scintillator Grid Moving Rod with keyway Cooling Rods End plates KF50 Flange

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 10 _____________________________________________________________________ With this design there are no removable water joints exposed to vacuum and no moving parts sliding through vacuum seals as in the MkI design. Mk II Emittance Scanner – vacuum seal KF50 flange to be welded directly onto stainless steel flange KF50 flanges joined via bellows similar to those shown here from UHV Design

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 11 DO WE NEED COOLING AND IF SO, IN WHAT FORM?

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 12 First Simple Model Model parameters: Beam Power = 36 W Material: Copper Block dimensions: L 100mm x W 100mm x H 100mm Cooling channel radius 10mm Ambient Temperature = 25C Cooling water temperature = 20C, forced convection Radiation ignored To investigate whether we need active cooling for the MkII emittance measurement device we can use FEA. First we will consider a copper block, being impacted by beam and being cooled by water. Beam power Copper block Cooling water

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 13 First Simple Model Model parameters: Beam Power = 36 W Material: Copper Block dimensions: L 100mm x W 100mm x H 100mm Cooling channel radius 10mm Ambient Temperature = 25C Cooling water temperature = 20C, forced convection Radiation ignored n1 n2 n3 n4 e1 e2 e3 The model as shown in figure 1 can be shown in it’s simplest form as in figure 2. This can be modelled using simple link elements and can also be solved using matrices and hence acts as a verification model. The simple 1D model from figure 2 was then expanded to the 2D form as shown in figure 3 to better illustrate the effect of the beam power and the cooling. Figure 1. A simple model with symmetry Figure 2. A 1D model with link elements. Figure 2. A 2D model using PLANE55 elements

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 14 Calculating convection coefficient for cooling

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 15 Calculating convection coefficient for cooling

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 16 Nodal temperatures After 1 minute: Tmax = 24.8°C Tmin = 23.6°C Nodal temperatures After 10 minutes: Tmax = 22.7°C Tmin = 21.8°C Nodal temperatures After 30 hours: Tmax = Tmin = 1198°C First Simple Model – cooled, radiation ignored For a beam power of 36W, cooling water temperature of 20°C, initial temperatures of 25°C throughout (and convection coefficient of 3000W/m 2.K). After about 6 minutes the block cooling reaches a thermal equilibrium with the beam power. With cooling switched off, after about 30 hours the OFC block will exceed the melting temperature of 1082°C. Water 20°C No cooling Temperature change with time for nodes along the right hand edge (representing the centre of the 2D model).

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 17 Emittance Measurement Device – 36W for one hour Conclusion: A cooled rod or grid allows a thermal equilibrium to be reached. It is recommended that for either cooled solution a time of approx 2000 seconds / 30 minutes is allowed to elapse before taking data to let the grid stabilise. No coolingRod water cooling aloneGrid water cooling alone T max = 60.0°C T min = 43.7°C T max = 37.0°C T min = 25.0°C T max = 22.2°C T min = 20.2°C

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 18 Displacement due to heating - cooled grid Maximum displacement in X direction = 0.018mm Maximum displacement in Y direction = 0.041mm

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 19 THE RESULTS FROM THE THERMAL CALCULATIONS HAVE PROMPTED THE DEVELOPMENT OF A NEW DESIGN

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 20 Simplified cooling scheme Mk II Emittance Scanner – revised Improved camera mount Rod mounts optimised for strength versus size to allow for motor to be mounted close to the main flange Tip / tilt stage Translation stage The combination of the tip / tilt stage with translation stages for X and Z and a custom translation adjustment for Y creates a system that is adjustable for all six degrees of freedom. Z Y X

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 21 UHV Design _____________________________________________________________________ The search for a long travel edge welded vacuum bellows led me to this company called UHV design.

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 22 LSML64/35 700SD Linear Shift Mechanism _____________________________________________________________________ Side and end elevations of the LSML64 from UHV Design

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 23 Quote From UHV Design _____________________________________________________________________ UHV design will also be quoting for cooling using their support tube and for electrical feed-throughs for strain gauges. Ite m Qt y Part NumberDescriptionPrice Each £ A1LSML64/ SD Long travel linear shift mechanism mounted on a CF64 (4-1/2" OD CF) flange with a CF35 (2-3/4” OD CF) travelling flange. Both flange have metric tapped boltholes. 700mm stroke. 38mm bore bellows (this is reduced with the support tube fitted). Price includes a bellows support tube, demountable bellows assembly, a side- mounted DC motor and timing belt cover. Price also includes pre-wired bakeable limit switches. £7, B1SADCBench-mounted DC motor controller for Item A. £ C1EWB L bellows assembly with CF35 (2- 3/4” OD CF) flanges. 700mm stroke. 39mm ID x 59mm OD. Bellows length = mm plus flanges and tubes. 10,000 cycle lifetime. £1,628.00

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 24 New design with LSML _____________________________________________________________________ The new design showing just the bellows from the LSML.

FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 25 Conclusions: Purchasing the LSML from UHV Design will reduce the manufacturing effort and will provide a proven working system that will reduce ‘fine tuning’ time dramatically. The cost of the LSML purchase may not prove to be significantly less than the cost to manufacture my design. The remaining design work and manufacture for the main flange, the camera mount and grid + grid mount can proceed in parallel with the manufacture of the LSML.