Cosylab/EBG Organization of common work Joze Dedic … on behalf of CSL MA team the best people make cosylab.

Slides:



Advertisements
Similar presentations
The e-Framework Bill Olivier Director Development, Systems and Technology JISC.
Advertisements

Electrical and Computer Engineering UAH System Level Optical Interconnect Optical Fiber Computer Interconnect: The Simultaneous Multiprocessor Exchange.
Digitally-Bypassed Transducers: Interfacing Digital Mockups to Real-Time Medical Equipment Scott Sirowy*, Tony Givargis and Frank Vahid* This work was.
Enterprise Resource Planning
ITIL v3 Foundation Certification
1 Dr. Djamal Ziani SAP Project Management. 2 ASAP Accelerated SAP (ASAP) is SAP's standard implementation methodology. It contains the Roadmap, a step-by-step.
WP CO Status and Progress December 8th, 2010 Johannes Gutleber PR a-JGU, December 8th, 2010 J. Gutleber 1 R. Gutleber.
1 © Cable Television Laboratories, Inc Do not share this material with anyone other than CableLabs Members, and vendors under CableLabs NDA if applicable.©
Dynamic Systems Development Method (DSDM)
 M.A - BIS Workshop – 4th of February 2015 BIS software layers at CERN Maxime Audrain BIS workshop for CERN and ESS, 3-4 of February 2015 On behalf of.
High Speed Digital Systems Lab Spring/Winter 2010 Part A final presentation Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of.
Work Package Controls MACS Week June 2010 June 24th, 2010 Johannes Gutleber PR a-JGU, June 24th, 2010 J. Gutleber 1 R. Gutleber.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
Omniran IEEE 802 Scope of OmniRAN Date: Authors: NameAffiliationPhone Max RiegelNSN
For more notes and topics visit: eITnotes.com.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Romaric GUILLERM Hamid DEMMOU LAAS-CNRS Nabil SADOU SUPELEC/IETR.
Topics Covered: Software requirement specification(SRS) Software requirement specification(SRS) Authors of SRS Authors of SRS Need of SRS Need of SRS.
Common Devices Used In Computer Networks
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
WP CO Column Status and Progress October 7th, 2010 Johannes Gutleber PR a-JGU, October 7th, 2010 J. Gutleber 1 R. Gutleber.
REDNET Prototype overview Rok Stefanic the best people make cosylab.
ProShell Procedure Framework Status MedAustron Control System Week 3 December 8 th, 2010 Roland Moser PR a-RMO, December 8 th, 2010 Roland Moser.
ProShell Procedure Framework Status MedAustron Control System Week 1 March 28 th, 2011 Roland Moser PR a-RMO, March 28th, 2011 Roland Moser 1 R.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
How to Organize the Systems Selection Process Using the SCOR Framework Pittiglio Rabin Todd & McGrath April 12, 2000 David Kennedy, Principal.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
PR a-JGU, October 9th, 2011 J. Gutleber 1 MedAustron PXI Systems at CERN Johannes Gutleber Roland Moser.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
Framework for G.709 Optical Transport Network (OTN) draft-ietf-ccamp-gmpls-g709-framework-05 CCAMP WG, IETF 82 nd Taipei.
MACS week 2/2011 status report nearly end of CWO-3) Joze Dedic … on behalf of CSL MA team the best people.
Omniran IEEE 802 Scope of OmniRAN Date: Authors: NameAffiliationPhone Max RiegelNSN
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
Senior DesignSoftware-1Seattle Pacific University High-level Software Design Context Diagram Connections between major components Synchronization with.
Converter Regulation Board Status WP PO 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 1.
ProShell Procedure Framework Status MedAustron Control System Week 2 October 7 th, 2010 Roland Moser PR a-RMO, October 7 th, 2010 Roland Moser 1.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Vertical column Joze Dedic … on behalf of CSL MA team the best people make cosylab.
Transcoding Design Team draft-camarillo-sipping-transc-framework-00.txt draft-camarillo-sipping-transc-3pcc-00.txt draft-camarillo-sipping-transc-b2bua-00.txt.
Industrial Control Engineering ADE Rapid Application Development Environment.
Omniran IEEE 802 Scope of OmniRAN Date: Authors: NameAffiliationPhone Max RiegelNSN
How the CDC Enterprise Architecture Development Methodology Can Help You Albert Decker, Northrop Grumman John Fitzpatrick, CDC.
Tobias Stadlbauer, Tony Fowler Special Magnets MedAustron 28 June 2011 Special Magnets Controls Status StatusIntroductionDetailsStatusAOBComponents.
Eurostat Services Joint UNECE/Eurostat CSPA workshop Geneva June 2016.
FESA Overview Leandro Fernandez On behalf of the FESA Team 6/22/2010FESA Overview1.
ETH 557 Week 5 Learning Team Internal Policies To purchase this material link Week-5-Learning-Team-Internal-Policies.
ACC 557 Week 5 Learning Team Assignment Internal Policies Your firm must establish internal policies regarding the creation of business contracts as well.
ACC 561 Week 1 Learning Team Charter Please prepare and submit your Team Charter. Please note that the team charter should be a collaborative and cohesive.
Ground Movement Control System Effective Organisational Safety Collaboration Bruce Evans Heathrow Airport Ltd. John Holmes NATS Ltd.
Methodologies/Life Cycle Models
Process 4 Hours.
Baseband Platforms - Architecture
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
Account Management Overview
Main Timing System Overview
Integrating MBSE into a Multi-Disciplinary Engineering Environment A Software Engineering Perspective Mark Hoffman 20 June 2011 Copyright © 2011 by Lockheed.
InGenius Connector Enterprise Microsoft Dynamics CRM
EGEE Middleware Activities Overview
Status of deliverables 2008
CSPA Workshop Hackathon
IEEE 802 Scope of OmniRAN Abstract
ДАРБИ КАРИЕРНа ориентация
5.b3 Monitoring & Reporting 2019
Presentation transcript:

Cosylab/EBG Organization of common work Joze Dedic … on behalf of CSL MA team the best people make cosylab

Basis for collaboration Cosylab and EBG signed a framework agreement Work is split in Contract Work Orders, per CWO: 1. input from MACS: identify areas of work 2. agree on deliverables 3. work, meet & realign, work ~once/month, 2-3 ppl / 1 wk  weekly Skype conference  mail, SharePoint 4. deliver, check 5. …define next CWO Cosylab team has (now) access to CERN services  accounts, SVN, Trac Cosylab

CWO-1 80 person-weeks (April, May, June) core of the work  studying the overall system,  identifying requirements,  refining existing requirements;  improving overall consistency  simplifying complexity  prototyping Cosylab

CWO-1 topics main timing system, MTS  orchestrating all accelerator devices for perfectly synchronous operation integration of power converters (PCos) into CS  a bridge between CS and PCos, providing PCos  real-time set-point values  control interface front end control system, FECOS  SW layer for all acc. equipment providing  standardized connectivity  imposing required functionality requirement/documentation management (traceability) alignment of MA CMP and CSL internal CM environment Cosylab

CSL team + Alignment Cosylab Requirements.doc CWO-1 MACS SVN CSL SVN loosely coupled tightly coupled Cosylab standard SVN structure Requirements.EAP MACS team other groups deliverables MACS CMP refinement understanding improves: dynamically adapt CSL BM

Conclusion collaboration procedures (CSL / MACS) aligned CSL team set-up (w. CERN accounts) and up to speed documentation management env. set-up & aligned / EA MTS & PCC requirements refined, consistent, and agreed MTS & PCC high-level architecture done PCo interface clarified FECOS prototype working CWO-2; it’s perfectly clear, what must be done CSL team made a step forward on time critical paths  fiber link, timing system we are enjoying the work with MACS team and looking forward to CWO-2 Cosylab