15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.

Slides:



Advertisements
Similar presentations
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Advertisements

Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Machine - Experiments January 12, 2005 Machine status.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Luminosity Monitoring Issues  ZDC  what’s the advantage?  problems  BBC  can they do it? A. Drees QCD critical point workshop, Mar
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole (Dzhordzhadze) –Machine Issues - (Drees) –RHIC Beam Experiments - (Pilat) –RCF Issues - (Throwe) Planning Meeting Web Site:

15 May 072 RHIC Run 7 as run/planned 12 Feb – cool-down begins 17 Feb – blue cold 20 Feb – 1 st beam in blue ring 23 Feb – Initial cold wave through yellow ring, not ready for beam 24 Feb – cryo problems, cool-down interrupted 26 Feb – cryo problems persist, begin warming up cryo plant 4 Mar – cryo back on 8 Mar – Blue cold again, ready for power supply setup/beam 12 Mar – Yellow cold, ready for power supply setup (lost 2.0 weeks) 13 Mar – Beam in Yellow, begin 10 day setup with beams 20 Mar – Begin ramp-up mode, overnight stores for experiments 26 Mar – 100 x 100 GeV/n AuAu Physics declared (Machine) 27 Mar – PHENIX Physics declared 28 Mar – 1 st Maintenance day 3 Apr - STAR Physics declared 15 May - 42 days to go! 26 Jun –end physics (13.1 weeks), begin warm-up to LN2 30 Jun – RHIC Cryo switch to LN2 complete, end 19.7 weeks of cryo operation

15 May 073 Experiments luminosity goals for the Au-Au run –PHENIX goals for 100 x 100 GeV/n Au-Au Delivered Luminosity = 4000  b -1 (was 2700) Sampled Luminosity = 1100  b -1 Overall sampling efficiency = 28.9% (based on 4/29-5/5 stores) –STAR goals for 100 x 100 GeV/n Au-Au Delivered Luminosity = 2800  b -1 (was 1800) Rare Trigger Sampled Luminosity = 600  b -1 (was 300) Minimum Bias Triggers = 60M Overall sampling efficiency for rare triggers = 24% (based on 5/3-5/8 stores) Revised 10 May

15 May 074 as of 5/13/07

15 May 075 as of 5/13/07

15 May 076 as of 5/14/07

15 May 077 as of 5/14/07

15 May min x 45 bunches 1 m  *

15 May min x 103 bunches.8 m  *

15 May /45 = 1.0 x 10 9 Au/bunch 45 x 45 bunches 43.2/45 = 0.96 x 10 9 Au/bunch 25 min into store

15 May /103 = 1.03 x 10 9 Au/bunch 103 x 103 bunches 97.5/103 = 0.96 x 10 9 Au/bunch 25 min into store

15 May 0712 For discussion (revisited – parameters taken ~ 25 minutes into the store) Run4 (21 Mar 04) Run7 (15 May 07) ZDC (initial Hz) 9,100 23,800 N Au (10 9 ) 45/43 106/97.5 N Au Bunches Au/Bunch (10 9 ) 1.0/ /0.95  * (m) If the beam emittance is the same for the two runs then:  * for Run 7 = 1.0 (  * for Run4) * 9,100/23,800(ZDC’s) * 103/45 (Nbunches) * (1.03/1)*(0.95/0.96)(bunch intensity) = 0.89 meters Run 7  * is supposed to be 0.8 meters 5/15/07

15 May 0713 As of 14 May New cold turbine 0.7 MW

15 May 0714 As of 14 May

15 May 0715 as of 14 May

15 May 0716 RHIC Machine/Detector Planning Meeting Next Meeting Tuesday, May 1, after Time Meeting Yousef Makdisi will moderate

15 May 0717 RHIC Machine/Detector Planning Meeting Archive

15 May 0718 For discussion (revisited – parameters taken ~ 25 minutes into the store) Run4 (21 Mar 04) Run7 (15 May 07) ZDC (initial Hz) N Au (10 9 ) /98 N Au Bunches Au/Bunch (10 9 ) /0.95  * (m) So….If the beam emittance is the same for the two runs we’d get: ZDC (2007) = 9600 (typ ZDC Run4)*103/45 (number of bunches) *(1.03/1.0)*(0.95/1) (intensity per bunch)*1/0.9 (beta*) = 23,900 Actual = 24,000 Hz  emittance ~10% more than Run4 5/15/07

15 May 0719 End of Store – the present plan, 3/27/07 Begin first week with 4 hour stores with option for experiments to end store early or extend store – both experiments must agree or store will be terminated after 4 hours. After first week, each experiment calculates optimum store time for their experiment. We average the two times and take this as the nominal time at store. This calculation should be revisited at least weekly and details of the calculation defended at our Machine/Experiments Meeting. Experiments have the option to end the store early or extend the store – in either case, requires both experiments to agree, otherwise the store will end as scheduled. Consideration will be given to the NASA experiments. If the NASA experiments need a few more minutes (up to ~ 15 minutes) to complete an exposure the setup for the next RHIC store should be delayed to accommodate this. Minimum luminosity for Machine to keep store - TBD

15 May 0720 PHENIX Goal STAR Goal PHENIX Goal (with Run 5 efficiency) 15 Delivered Integrated Luminosity [nb -1 ] Run-7 Au-Au luminosity projections 100 GeV/n 12.6 weeks with 26 June end of physics

15 May 0721

15 May 0722 RHIC Machine/Detector Planning Meeting Answer to Questions from the 6 Feb meeting (1) Experiments – What are your luminosity goals for the Au-Au run, Delivered and Sampled? –PHENIX goals for 100 x 100 GeV/n Au-Au Delivered Luminosity = 2700  b -1 Sampled Luminosity = 1100  b -1 Assumes 68% live time, 60% vertex cut = 40.5% efficient However, Run5 efficiency factor was 25% (if so, the Run7 requirement is 4400  b -1 delivered) –STAR goals for 100 x 100 GeV/n Au-Au Delivered Luminosity = 1800  b -1 Sampled Luminosity = 300  b -1 with 60M usable min-bias events ~50% live time

15 May 0723 RHIC Machine/Detector Planning Meeting Answer to Questions from the 6 Feb meeting (to be revisited) (2) Experiments and Machine - If the Au-Au run goes well and luminosity goals are met with a week or two left to go, what should we do? –PHENIX Probably need 15 weeks to achieve Au-Au goals – highest priority pp development if well motivated/justified –Studies to maximize Run8 figure of merit –500 GeV development –STAR Low energy Au-Au development, collider issues, triggering… –Machine 1-2 days low energy Au-Au development at 0.5 injection energy pp development – –1 st priority new RHIC working point (needs ~2 weeks) –2 nd priority 500 GeV development

15 May 0724 As of 12 Mar