Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Management Brent Fultz California Institute of Technology Report from the Baseline Review Project Execution Plan Purpose of IDT.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
HFT face-2-face F.Videbaek Brookhaven National Lab.
TOF Project Construction Project Plan
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Silicon Front End Electronics and Data Acquisition System for PHOBOS experiment at RHIC Pradeep Sarin for PHOBOS Collaboration October Fall 2000.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
Phobos Magnet Status Leslie Rosenberg & Patrick Decowski, MIT Technical Advisory Committee November 1998.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
T2K IFOP 11/7 Imperial College/RAL Dave Wark Status of the 280m Detectors and Current Issues Dave Wark Imperial/RAL J-PARC IFOP Videocon Nov. 16, 2007.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
Jim Fast Pacific Northwest National Laboratory
MICE CM31 Schedule summary
Preparations for a Lehman Review
Presentation transcript:

Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November 6, 1998

Slide 2 6-Nov-98PHOBOS Review: Cost & Schedule Outline l Financial status and WBS variance »Project cost estimates and schedule »Milestone performance »Institutional funding l Schedule for major procurements l Critical path items l Contingency l Completion of 2nd arm l Summary

Slide 3 6-Nov-98PHOBOS Review: Cost & Schedule Cost Status: Overview l Management plan completed 4/96, approved 8/96 l Last Cost & Schedule review 6/97 l Estimated Project Cost now $7.84M (1% increase from 6/97) l Cost to date: $5.01M (64% of EPC) l RHIC funded PO commitments of $982K (13% of EPC) l Contingency of $276K for remaining cost of $1.31M (21%) l Funding source: Polish$1.43M18% Taiwan.21M RHIC 6.15M 76%NSF.33 $8.13M

Slide 4 6-Nov-98PHOBOS Review: Cost & Schedule Cost Status: RHIC Funding l RHIC funds allocated through FY98: $4.71M (77% of available RHIC funding). l RHIC funds spent: $3.58M (58%) l PO commitments: $0.98M (16%) l Balance available: $1.59M (26%)

Slide 5 6-Nov-98PHOBOS Review: Cost & Schedule Funding Profile RHIC Funding (K$) FY94300 FY95250 FY96650 FY971,184 FY982,323 FY991,443 Total6,150

Slide 6 6-Nov-98PHOBOS Review: Cost & Schedule Schedule Status: Overview l Magnet delivered to BNL l Si spectrometer modules in full production l Si multiplicity/vertex detectors complete by 3/99 l Time of flight on schedule; ready 6/99 l Trigger counters in production; ready 4/99 l Electronic readout has had some delays in FEC development, but prototype now under test. All other parts requiring major design are also in prototype stage. l Zero-suppression/DAQ will be ready on time l Mechanical structures almost complete

Slide 7 6-Nov-98PHOBOS Review: Cost & Schedule Milestone Performance MilestoneWBS 6/97as of 10/98 Ordering magnet7/9711/97 Full chain software on simulated data10/97 10/97 Prototype DAQ system11/979/98 Testing of pipeline chips begins5/98 Change to: Begin testing front end controller10/98 Complete fab. of spectrometer sensors3/9811/98 Pre-amp chips fab. and tested5/989/98 Begin shipping detectors to BNL1/991/99 Ready for beam8/999/99

Slide 8 6-Nov-98PHOBOS Review: Cost & Schedule Project Progress

Slide 9 6-Nov-98PHOBOS Review: Cost & Schedule Project progress by subsystem Values in K$ However, note descoping to 1 arm!

Slide 10 6-Nov-98PHOBOS Review: Cost & Schedule Institutional funding l Contracts with all institutions in place: Maryland last contract to be signed l Yale terminated with Steve Manly moving to Rochester

Slide 11 6-Nov-98PHOBOS Review: Cost & Schedule Major Procurements (>$100K) l VA readout chips ($169K; IDE AS) delivered 9/98 l TOF phototubes/bases/shields ($153K; Hamamatsu) delivered 9/98 l Magnet ($228K;Danfysik): delivered to BNL this week l Si sensor production ($498K;NCU) for arm 1 complete 11/98 l Beam pipe: ($307K; Electrofusion) 3/98-4/99 l Trigger and TOF electronics ($189K; LeCroy) 9/98-1/99 l Front-end controllers ($145K) 1/99-3/99

Slide 12 6-Nov-98PHOBOS Review: Cost & Schedule Critical path items l Utilities must be ready for magnet hookup and mapping or serious delay in detector installation will result l Must begin production of FEC’s by 1/99 in order to have them all tested by 5/99 and ready for installation

Slide 13 6-Nov-98PHOBOS Review: Cost & Schedule Contingency l Value of $276K now at 21% of balance of cost for uncommitted expenses. l Estimates for outside vendors are firm, based on quotations. l Uncertainty in electronics cost essentially in estimate for time to assemble modules and to debug front-end controllers. l Some uncertainty in installation costs.

Slide 14 6-Nov-98PHOBOS Review: Cost & Schedule Completion of 2nd arm l Total cost for parts and assembly of arm 2 is $414K, of which $100K is for custom parts which is in WBS. l Mechanical parts completed with Polish funds and Si sensors produced with Taiwan funds. l Completion of spectrometer arm 2 will depend on use of any remaining contingency and new funding. This includes commercially available parts and assembly: VA readout chips (IDE AS) $99K Vendor interaction and oversight 15K Assembly and test of detector modules (1.5 FTE-year)165K Additional zero-suppression (Mercury) modules 35K Total $314K

Slide 15 6-Nov-98PHOBOS Review: Cost & Schedule Summary l All systems in prototype or production phase. l Total estimated project cost is within budget and completion by RHIC turnon is within schedule. l Completion of spectrometer arm 2 will depend on use of contingency and new funding. l Most major procurements complete. l Magnet must be installed and mapped on time or detector installation will be seriously delayed. l PHOBOS looking forward to physics running on day 1.