1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM 2011 2 ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011.

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Jordan Renewable Energy Law & Energy Efficiency Fund
KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
PRESENTER – HASMUKH PATEL, CEO OF FIJI ELECTRICITY AUTHORITY
Renewable Energy Program in Jordan
1. Investment in Energy Today Our Key to a Prosperous Khyber Pakhtunkhwa Tomorrow Government of Khyber Pakhtunkhwa Energy & Power Deptt Amendments in.
1 By: Mr. Zafar Mahmood Chairman, Water and Power Development Authority OCTOBER 2014.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Renewable Energy Program Arab Union for Electricity
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
GEO STRATEGIC LOCATION 2 3 Deutsche Bank 3 Power Sector has attracted around $14 billion of FDI and 65 power projects were completed in the past two.
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
Effective Frameworks for Renewable Energy Deployment: A Regional Overview Oman Energy & Water Conference May 19, 2015.
Renewable Energy in Oman Public Authority for Electricity and Water Khalil Alzidi Senior Renewable Energy Engineer.
Financing renewable energies in Myanmar COMMITTEE 2 ON RENEWABLE ENERGIES AND CLIMATE CHANGE ADAPTATION.
Finding Our Place in the Sun : Ways to Achieving the Solar Installation Target in the Philippines Tetchi cruz-capellan CEO, SunAsia Energy President,
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Load shedding in Pakistan Reasons & Remedies February 9, 2009 By Muhammad Ziauddin.
Renewable Energy Sector
State Policies and Energy Markets VINCENT S. PÉREZ Secretary Department of Energy REPUBLIC OF THE PHILIPPINES.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Electricity Reforms in Bangladesh
Imran Ahmad Additional Director Infrastructure, Housing & SME Finance Department State Bank of Pakistan.
South African Wind Energy Programme A Otto 2 nd Annual Wind Energy Seminar 28 September 2010, Gallagher.
Energy situation & Energy policies in South Africa Presented by: Thembani Bukula.
MANITOBA CEEN 590 Energy Policy. YES TO OIL PIPELINES REASONS They will bring economic benefits and create new jobs. e.g. the Energy East Pipeline Project.
FINANCING WIND POWER PROJECTS. Project Financing is the financing of long term projects based upon a complex financial structure where project debt and.
ENERGY MIX IN SENEGAL WHICH ONE TO CHOOSE? General Directorate APUA CONGRESS. LUANDA 2014 Safiétou DIALLO Technical Adviser.
Wind ENERGY IN PAKISTAN Potential, Current Status & Prospects
UNECE-e8-EBRD-WEC Clean Electricity Production Forum: Fostering Investment in Electricity Generation in Central and Eastern Europe and Central Asia Geneva,
1 Renewable Energy at Closed Landfills June 17, 2009 Jim Christo Massachusetts Renewable Energy Trust.
CDM Status in Pakistan Dr. Syed Sajidin Hussain Clean Development Mechanism Cell Ministry of Environment, Government of Pakistan
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
HYDRO POWER POTENTIAL AND INVESTMENT PROSPECTS IN GILGIT-BALTISTAN
Sanjay Garg General Manager PGCIL/ Ministry of Power
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Nitasha Mubashar Fatima Khan Kausar Wahab. Introduction of Windmill Use to generate electric energyInstalled on a tower in windy locationAverage life.
Renewable Energy Policies of Germany and China Masood Ahmed CRER, SZABIST December 24’ 2009.
BI Marketing Analyst input into report marketing Report TitleElectricity in California Report Subtitle State profile of power sector, market trends and.
3 RD ALTERNATIVE ENERGY & POWER ASIA CONFERENCE – 28 th March 09 WIND ENERGY OPPORTUNITIES & CHALLENGES IRFAN AFZAL MIRZA DG (TECH) AEDB
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
1 Radhika Bharat, Senior Investment Officer, Private Sector Infrastructure Development Africa Carbon Forum, Nairobi, March 2010 Clean Development Mechanism.
OREDA OREDA started in 1984 by Government of Odisha to promote renewable energy resources and its applications in the state. OREDA is the state nodal agency.
Role of NEPRA - Looking Ahead Khalid Saeed September,
Page 1 Implemented by Up-Scaling of Wind Power in Vietnam AHK Business Trip “Wind Power in Vietnam” Ho Chi Minh City, 23 November 2015 Peter Cattelaens.
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Eng Salma Hussien Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy Plan.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
16th World Wind Energy Conference 12 June, 2017 Malmö, Sweden
Renewable Energy Development in India
Financing of Solar power plants
SDPI’s 20th Sustainable Development Conference (05-07 Dec, 2017)
Zahrani & Selaata IPP Projects
Emerging Wind Energy Market Pakistan
Presentation transcript:

1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011

2 ENERGY SCENARIO: PAKISTAN Electrical Energy Sector Overview:  Total Installed Electricity Generation 19,420 MW Capacity  Thermal (fossil-fuels): 12,487 MW (64% share)  Hydel: 6,480 MW (33% share)  Nuclear: 462 MW (2% share)

3 ENERGY SCENARIO: PAKISTAN

4 Energy Sector Overview  Population: million  Electrification Rate: 62.4%  Population Connected to Gird: million

5 Energy Sector Overview  Energy Stakeholders:  Ministry of Water and Power  Ministry of Petroleum and Natural Resources  Water and Power Development Authority (WAPDA)  National Electric Power Regulatory Authority (NEPRA)  National Transmission and Despatch Company (NTDC)  Private Power and Infrastructure Board (PPIB)  Alternate Energy Development Board (AEDB)  Pakistan Atomic Energy Commission (PAEC)  Oil and Gas Regulatory Authority (OGRA)  Oil and Gas Development Company Limited (OGDCL)  Oil Marketing Companies (OMCs)  Provincial organizations

6 Renewable Energy  Yearly increase in Energy Demand 7-10%  Current Total Installed Capacity19,420 MW  Projected Demand by ,590 MW  Share of Renewables by MW * (i.e. at least 5% share) * Source: Mid Term Development Framework, Planning Commission, Govt. of Pakistan

7 * RE POLICY: Unique Features  Wind Risk - responsibility of GoP  Guaranteed Electricity Purchase  Grid provision is the responsibility of the purchaser  Attractive Tariff (17%-18% ROE)  Counter Guarantee by multilaterals for first few projects  Special Incentives by the State bank for up to 10 MW plants  No Import Duties on Equipment  Zero Sales Tax  Net Metering  Banking of Electricity  Wheeling Provisions  Grid Spill Over Concept introduced  Carbon Credits * Revised Policy expected to be submitted to CCI for approval.

8 Electricity Tariff For Wind as Determined by NEPRA

9 Total Installed Capacity  Currently first phase of 06 MW has been installed by an IPP.  Projects in Pipeline:  IPPs expected to achieve Financial Close for 50 MW each this year; i.FFC Energy Ltd. ii.Zorlu Enerji iii.CWE iv.Tenaga Genarasi v.Fauji Foundation (100 MW) vi.Lucky Energy vii.Gul Ahmed Power viii.Metro Power YearFinancial CloseCOD MW6 MW MW100 MW MW400MW

10 Wind Resource Potential  70,000 – 80,000MW harnessable potential  50,000 MW in Gharo-Keti Bandar and Jhampir corridors.  Average Wind Speed 7 + meters / sec  At 60 m height  Sites in Baluchistan, Punjab and Northern Areas being identified Gharo Wind Corridor

11 Pakistan Wind Map Developed by National Renewable Energy Laboratory, USA 30,000MW 50,000MW 40,000MW 30,000MW 180,000MW 3,000MW

12 First Wind TurbineIinstalled by M/s Zorlu Enerji at Jhampir, Thatta

13 06 MW Wind Power Project (Phase-1) by M/s Zorlu Enerji at Jhampir, Thatta

14 Next Steps  Detailed Resource Mapping  In order to develop potential areas, detailed wind resource assessment is required. Wind measuring masts being installed in potential areas. More wind measuring masts need to be installed all over Pakistan in order to establish detailed wind resource of Pakistan.  LAND (Availability & Security)  Several project proposals can be encouraged by availability of land.

15  Tariff by NEPRA  Cumbersome cost-plus tariff determination process – Requires firm turbine and EPC contracts as well as Lenders’ term sheet prior to submissions.  Sometimes extends beyond validity of the Equipment, EPC and lender contract validities. Feed-in-Tariffs /Upfront tariffs being recommended in the draft RE policy to reduce project development time by up to 10 months, and attract more foreign investors. Next Steps

16 THANK YOU