NSTX-U Transition to Operations Al vonHalle Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 October 2 nd & 3.

Slides:



Advertisements
Similar presentations
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Advertisements

Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U Engineering Operations January 28, 2015 NSTX-U Engineering Operations Al vonHalle January 28, 2015 NSTX-U Supported by Culham Sci Ctr York U Chubu.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX Team Meeting June 25, 2010 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Particle control task force early run discussion R. Maingi, J. Canik Particle Control Task Force Meeting PPPL LSB B318 January 20, 2015 NSTX-U Supported.
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Activity Certification Committee Charles Gentile On behalf of the NSTX-U ACC Princeton Plasma Physics Laboratory NSTX Upgrade Project Readiness for Operations.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
XP1518: RWM PID control optimization based on theory and experiment S. A. Sabbagh, J.W. Berkery, J.M Bialek Y.S. Park, (et al…) Department of Applied Physics,
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
February NSTX-U Team Meeting. Engineering Operations Feb. 11, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in late March (3/28/2014)
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U Old Dominion U ORNL.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC SPG NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
1 R Raman, B.A. Nelson, D. Mueller 1, T.R. Jarboe, M.G. Bell 1, J. Menard 1, R. Maqueda 2 et al. University of Washington, Seattle 1 Princeton Plasma Physics.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
Macroscopic Stability TSG Pre-forum Meeting #1 J.W. Berkery Department of Applied Physics, Columbia University, New York, NY NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Supported by Office of Science NSTX S.M. Kaye, PPPL ITPA PPPL 5-7 Oct Confinement and Transport in NSTX: Lithiumized vs non-Lithiumized Plasmas Culham.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

NSTX-U Transition to Operations Al vonHalle Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 October 2 nd & 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics Old Dominion ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Operations Engineering on NSTX Administrative systems utilized for NSTX start-up and operations were originally developed for the TFTR D-T campaign. The procedures and controls described in this presentation were used in the initial commissioning of NSTX in February, 1999, and have been exercised for every restart after an extended outage or maintenance/upgrade period.

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Activity Certification Committee Concerns regarding personnel, environmental, and machine safety are being addressed early in the planning to start experimental operations. NSTX-U maintains an Activity Certification Committee (ACC) comprised of representatives from PPPL Engineering, Research, Safety, and the DOE Princeton Area Office to review newly installed subsystems before commissioning. System reviews are performed at completion of construction activities. The ACC review will include: Review of the revised Safety Assessment Doc. (SAD) – Nov A review of design review documentation and chit resolution Interviews with cognizant engineer(s) Plans for pre-operational & integrated system testing Review of safety/interlock systems Physical walk-downs of equipment Review resolution of remedial steps recommended by ACC.

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Operational Readiness Assessment (ORA) A PPPL QA Audit of NSTX-U Startup Documentation will begin in April The DOE Princeton Site Office (PSO) is arranging for a Operational Readiness Assessment (ORA) before the project moves to start-up. The ACC and QA Audit reports are delivered to the members of the ORA, and the ACC team is made available to interface with the ORA as required. A Two Step ORA is being considered. The NBI Upgrade may be reviewed in late summer 2014, the Vessel, Coils, Centerstack and Balance of Project in the Fall of Safety Certificates allowing Power and then Plasma Operation will be issued upon the recommendations of the ORA.

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Test Cell Access Control Approvals and training required for unescorted access into the NSTX test cell (per OP-NSTX-12): General Employee training (GET) Radiation Safety Training Lockout/Tagout (Control of Energy Sources) Basic Electric Safety Knowledge of Administrative Procedures: Conduct of Operations (OP-AD-39) Chain of Command (OP-AD-56) Work Permit System (OP-AD-09) Control of Temporary Modifications (ENG-036) Control of Workplace Cleanliness (OP-AD-24) NSTX Access Controls (OP-AD-117)

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Managing Work in the Test Cell Work Permits, approved by the PPPL Shift Supervisor, ensure that Test Cell configuration control and proper work practices are maintained. Defines location of work, tools req’d and responsible workers Verifies proper procedures are used (Job specific, Lift, etc.) Checks permit requirements (confined space, radiological, etc.) Provides record for work for checks before resuming ops A Job Hazard Analysis (JHA) is performed for each task to help identify existing and potential workplace hazards, and to find ways to control these hazards. The safety controls/equipment needs are defined on the JHA, and reviewed with staff as part of the pre-job brief.

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Subsystem Prep for Operations Proper system operation is ensured by an approved set of operations procedures: Preoperational Test Procedures describe the equipment, methods and steps to bring sub- systems to an operational state. This includes all vendor supplied and project-designed safety/interlock checks. Integrated System Test Procedures describe the steps to test and document operation or interactions of multiple systems. System Operations Procedures specify the prerequisites, requirements and actions for operating individual systems. General Operating Procedures coordinate the operation of multiple systems.

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Overall Start-Up Procedure An Administrative procedure (OP-NSTX-02) is used to list the sub-system and integrated system procedures used to start-up and operate NSTX-U. The procedure is managed by the NSTX Chief Operating Engineer (COE), who will get sign-offs from the appropriate cognizant engineers upon the completion of each procedure. Prerequisites and the order of completion are specified, and “Hold Points” are included when management approvals are needed. This procedure was used for the initial commissioning of NSTX, and has been revised/used annually for each restart after an NSTX outage with configuration changes (currently working on Rev. #14) The procedure concludes with full power combined field test shots per the electromagnetic ISTP, and the subsequent initiation of the 1 st plasma of the run period.

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, OP-NSTX-02 Excerpts 2.SCOPE This procedure defines the criteria for confirming the completion of the preoperational testing of those work elements associated with plasma operations on NSTX: Torus Vacuum Pumping System (TVPS) Torus pumpdown and testing Coil systems and associated hardware AC Power Systems Motor Generator Sets Water Systems Bakeout System Control Systems NTC Safety Interlock Systems Energy Conversion Systems (ECS) Diagnostic Systems Glow Discharge Cleaning (GDC) System Lithium Systems RF Systems (HHFW & ECH) Neutral Beam Injection Systems Preparation of the Machine Areas Integrated System Testing

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, OP-NSTX-02 Excerpts 3.REFERENCES (SOME EXAMPLES) PTP-ECS-39FCPC Dummy load tests PTP-ECS-45ECS HiPot Tests PTP-NB-11NB Long Pulse Ion Source Startup Procedure PTP-RF-44NSTX ECH-PI Pre-Operations testing PTP-WS-08NSTX De-Ionized Water/ System Testing OP-ECS-245FCPC Daily Startup/Shutdown Procedure OP-VV-732Leak Checking of NSTX OP-NB-229Startup/operations of the 1070W helium refrigerator OP-RF-140HHFW System 1&2 Operating Procedure OP-KK-26ECS Kirk key Test OP-KK-27MG CO2 Kirk Key Test OP-KK-28NSTX SLD Kirk Key Test OP-KK-90ICRF System 3&4 Kirk Key and Local E-Stop Test OP-G-151Daily Hi-Pot Test of the NSTX Inner/Outer Vacuum Vessel OP-MG-07D-Site MG Operation in support of NSTX AP-ECS-01FCPC System Access AP-RF-01ICRH Sources 1 & 2 Access Procedure

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, OP-NSTX-02 Excerpts A.5. COIL ENERGIZATION TESTING 5.1 Vacuum Vessel Hi-Pot successfully completed (NSTX-OP-G-151) ATI:___________________________ 5.2 NSTX prepared for operations per the daily start-up procedure (OP- NSTX-14) ATI:___________________________ 5.3 NSTX prepared for HPP operations (OP-NSTX-15) ATI:___________________________ 5.4 ECS start up and Hi-Pot of the NSTX Coil Systems completed (OP- ECS-245)ATI:___________________________ HOLD POINT (Steps A.1 through A.5.4 must be completed before proceeding with coil energization tests) The following committee has reviewed the completion of preparations for Individual Coil Energization and concur that systems and procedures are in place and ready. NSTX Project Eng. __________________________ Head, NSTX Ops___________________________ Head, Engineering & Infrastructure ______________________ Individual Coil Energization may proceed per (ISTP-NSTX-01)

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Allowable Operating Parameters The electromagnetic ISTP (ISTP-001) defines protection system settings and necessary test shots for any changes to the NSTX electromagnetic configuration and/or operating envelope. Intended to be repeated multiple times as the operating envelope is adjusted to support the experimental program. Verifies that planned polarities, power levels and pulse lengths are consistent with design allowables. Documents, exercises and tests protection circuits, and prescribes test shot levels. Each iteration approved by Engineering and Research groups. (see example on next slide)

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,,

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Operator Training Matrix Operator Training Matrixes (OP-NSTX-12) developed for: Chief Operating Engineers (COEs) Machine Technicians Vacuum Technicians Water Technicians Field Coil Power Conversion Technicians Radio Frequency System Operators High Harmonic Fast-Wave Systems Electron Cyclotron Heating systems Neutral Beam Operators Ion Source Systems Cryogenic Systems Beam-line Vacuum ops NB Operations Shift Supervisor

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Maintenance/Repair Planning Detailed procedures to safely access vessels, power equipment, diagnostics, etc. are developed before starting up equipment. A lab-wide Lockout/Tagout procedure defines how sources of hazardous energy are controlled. Periodic Preventive Maintenance is performed on: Safety Interlock Systems (OP-KK-**, OP-NSTX-**) Control Systems (MP-CCD-**) Energy Conv. Systems (MP-MG-**, MP-ECS-**) AC Power Systems (MP-AC-***) Heating Systems (MP-NB-**, MP-RF-**) Water and Bake-Out Sys. (MP-WS-**) Vacuum and Gas Inj Sys. (MP-VAC-**) Machine Weld/Bolt Insp.(MP-TOR-**)

NSTX-U NSTX Upgrade Project – Office of Science Review – October 2-3,, Summary The ACC has not only proved effective in identifying potential system problems, but has done so in a timely fashion that allows these problems to be addressed more efficiently than if found just before start-up. PPPL’s Administrative Procedures and Routines are well suited to help guide NSTX-U through a successful start-up and into experimental operations. The NSTX technical procedures for pre-operational testing, start-up and control of operating parameters have been updated and exercised annually for each NSTX run campaign, and are now being updated for the NSTX-U configuration.