AGS RSVP Weekly Meeting P. Pile 5 May 2005 AGS RSVP Weekly Meeting 5 May 2005 Useful Links: RSVP Project : C-AD.

Slides:



Advertisements
Similar presentations
Management’s preliminary comments to the ERC Report.
Advertisements

MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
ARIES-General Page 1 Summary of Findings of Lehman Committee to Assess ITER Costing L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
RF Cavity / Coupling Coil Module
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
1 Framework Programme 7 Guide for Applicants
From Research Prototype to Production
4.0 Accelerator Physics & Pre-operations (1.10) Phil Martin, Stan Ecklund, Rick Baartman & Peter Limon 4.1Accelerator Physics Findings The hot spare.
Developing a result-oriented Operational Plan Training
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
AGS RSVP Weekly Meeting P. Pile 18 November 2004 AGS RSVP Weekly Meeting, 18 Nov 2004 Useful Links: RSVP Project : C-AD AGS Project:
Management subcommittee closeout Jay Marx (chair, LBNL), Joel Butler (Fermilab), Stan Wojcicki (Stanford) Thanks to all for cooperation and openness!!
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
BESAC Dec Outline of the Report I. A Confluence of Scientific Opportunities: Why Invest Now in Theory and Computation in the Basic Energy Sciences?
AGS RSVP Weekly Meeting P. Pile 14 Apr 2005 AGS RSVP Weekly Meeting 14 Apr 2005 Useful Links: RSVP Project : C-AD.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
AGS RSVP Weekly Meeting P. Pile 17 Mar 2005 AGS RSVP Weekly Meeting 17 Mar 2005 Useful Links: RSVP Project : C-AD.
Introducing Project Management Update December 2011.
1 ILC Internal Cost Review Major Points from External Reviewers T. Elioff, J. Marx, V. Soergel, M. Yoshioka, and A. Yamamoto, (C. Wyss, absent) To be presented.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
BNL/AGS RSVP Upgrades Project WBS 1.4 – Breakout Session Rare Symmetry Violating Processes Preliminary Baseline Review Brookhaven National Laboratory 6-8.
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Summary of Proposal RFQ Injection for High Intensity Neutrino Sources Janet Conrad Primary Reviewer Rick Baartman FY16 Intermediate Neutrino Research Progam.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
AGS RSVP Weekly Meeting P. Pile 10 Feb 2005 AGS RSVP Weekly Meeting 10 Feb 2005 Useful Links: RSVP Project : C-AD.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
AGS RSVP Weekly Meeting P. Pile 10 Mar 2005 AGS RSVP Weekly Meeting 10 Mar 2005 Useful Links: RSVP Project : C-AD.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Large Synoptic Survey Telescope
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Managing Project Risks and Opportunities
Preliminary Project Execution Plan
Presentation transcript:

AGS RSVP Weekly Meeting P. Pile 5 May 2005 AGS RSVP Weekly Meeting 5 May 2005 Useful Links: RSVP Project : C-AD AGS Project: Office Agenda –Costs and Baseline review close-out (pile) –RSVP Extinction Issues (brown) –Other

AGS RSVP Weekly Meeting P. Pile 5 May 2005 ~$48,200,000

AGS RSVP Weekly Meeting P. Pile 5 May 2005 RSVP Baseline Review Stan Wojcicki Introductory Remarks – a couple of excerpts “….These are formidable challenges but they would be undoubtedly manageable in normal fiscal times. Unfortunately, the times we are in are not ordinary. The projected declining budgets, the uncertainties associated with the future support of our accelerator facilities, the steadily declining support level of the university groups, the eroded technical infrastructure at the universities, all require extraordinary measures in planning our future.”

AGS RSVP Weekly Meeting P. Pile 5 May 2005 RSVP Baseline Review Stan Wojcicki Introductory Remarks – a couple of excerpts (cont’) ….”We already stated our conviction as to the physics importance of this project; we are also aware of the high stakes associated with the success or the failure of this project. We hope that our work will contribute towards choosing the right path in planning for the future. “

AGS RSVP Weekly Meeting P. Pile 5 May 2005 RSVP Baseline Review – RSVP Management Marx, Butler, Wojcicki a few general remarks 1.“RSVP is embedded in an unusual management situation” 2.“The management structure is an “experiment” and should be given adequate time to see if it works. If not, changes should be made.” 3.“Scientific success is the overriding consideration, not just a successful project.”

AGS RSVP Weekly Meeting P. Pile 5 May Management costs:  About $20M including 11% contingency support right size staff at Columbia and BNL project offices  Contingency too low, should be about 20% 5.Overall Contingency  Management subcommittee fully supports 45% overall contingency.  Less is incommensurate with success. a few general remarks (cont’) RSVP Baseline Review – RSVP Management

AGS RSVP Weekly Meeting P. Pile 5 May 2005 Brookhaven Management BNL management seems engaged and committed to success of RSVP Director and AD for HENP working to find ways to enhance likelihood of success AGS management is actively engaged in providing for needs of RSVP BNL management must continue to be engaged and committed to success over life of RSVP a few general remarks (cont’)

AGS RSVP Weekly Meeting P. Pile 5 May 2005 RSVP Management Recommendations there were 9 recommendations – those relevant to C-AD follow: NSF & DOE- put in place interagency agreement to facilitate funding flow to BNL NSF & RSVP- define performance goals for completion of AGS part of project as part of project plan NSF, BNL RSVP agree on AGS beam delivery goals vs. time during operations phase

AGS RSVP Weekly Meeting P. Pile 5 May 2005 Summary Conclusion, AGS/Booster Sub-group R. Gerig, C. Moore, M. Tigner Cost, Schedule and Management  Methodology: we examined four examples in detail; Beam switchyard rebuild, F6 septum rebuild, Cable suite upgrade, Extinction system. Each of these estimates were done in detail with substantial back-up from previous experience and could be based on purchase invoices, bids and engineering estimates and recorded labor hours for the same or similar work. Even for items such as the septum, which are essentially rebuilds of existing equipment, significant engineering time was included. With the addition of the “Lockheed Formula” contingency one can characterize this as a very conservative estimate. RSVP Baseline Review – WBS 1.4 (AGS)

AGS RSVP Weekly Meeting P. Pile 5 May 2005  The schedule presented is based on an assumed maintenance schedule for RHIC which makes the engineering, procurement and construction somewhat arbitrary and heavily front loaded, imposing some cost and schedule risk. Needed expert labor hours are accounted for but the need for backfilling with new hires will add to the schedule stress and risk RSVP Baseline Review – WBS 1.4 (AGS)

AGS RSVP Weekly Meeting P. Pile 5 May 2005  Need for further integration of the project is shown by such examples as the ambiguity about the responsibility for beamlines and diagnostic instrumentation up to and including the targets for MECO. RSVP Baseline Review – WBS 1.4 (AGS)

AGS RSVP Weekly Meeting P. Pile 5 May 2005  The need to carry out design and procurement before the full consequences of high intensity operation with new equipment having significant beam impedances (see below) imposes its own cost and schedule risk. For some of the additions the risk may be substantially greater than for others. (see below) RSVP Baseline Review – WBS 1.4 (AGS)

AGS RSVP Weekly Meeting P. Pile 5 May 2005  While a significant, top down, project contingency has been assumed for the construction phase (MREFC), no explicit contingency has been identified for the operation phase. This imposes both a schedule and cost risk RSVP Baseline Review – WBS 1.4 (AGS)

AGS RSVP Weekly Meeting P. Pile 5 May 2005  Spares that are needed to ensure reliable running for RHIC in concert with RSVP operation have been identified and provided for in the cost estimate. Spares needed to assure reliable operation of RSVP have not been provided for in the MREFC budget but are expected to be taken from RSVP operations if needed. RSVP Baseline Review – WBS 1.4 (AGS)

AGS RSVP Weekly Meeting P. Pile 5 May 2005  In addition to the usual cost and schedule risk associated with performance of suppliers, there is an additional risk associated with the rather large contribution in kind for KOPIO RSVP Baseline Review – WBS 1.4 (AGS)

AGS RSVP Weekly Meeting P. Pile 5 May 2005 Technical Aspects  The consequences † of sustained operation at proton fluences comparable to or somewhat greater than previous highs, together with the higher peak beam currents to be encountered, have not yet been assessed as well as current tools would allow. This is understood by the proponents and a plan for addressing them is being formulated RSVP Baseline Review – WBS 1.4 (AGS)

AGS RSVP Weekly Meeting P. Pile 5 May 2005  † Consequences of the new impedances may be the engendering of various instabilities which could impact extraction efficiency and the stability of extracted beam on target as well as backgrounds. Consequences of optics distortion could impact extraction efficiency and the distribution of loss radiation around the rings.  If a consequence were that the intensity would need to be lowered to control radiation, the result could be easily assessed in a linear fashion. If however, the consequence were a failure of the extinction system, its impact could be much more severe, making it urgent to investigate. RSVP Baseline Review – WBS 1.4 (AGS) Technical Aspects(cont’)

AGS RSVP Weekly Meeting P. Pile 5 May the impedances of the new active and passive components that will be added to the Booster and AGS need to be calculated and measured across the full relevant frequency spectrum of the beam under all operation conditions, including both resonant and broad band impedances, e.g. - - the existing rf system (with stabilizing feedback), - - the new 25 and 100 MHz systems, the extraction septa, both electrostatic and magnetic - - the extinction system stripline kickers - - beam instrumentation and other components that present changes of cross-section to the beam RSVP Baseline Review – WBS 1.4 (AGS) Technical Aspects(cont’)

AGS RSVP Weekly Meeting P. Pile 5 May Beam orbits and envelopes may be distorted in different ways for different bunches in MECO operation owing to the action of the AC dipole and the stripline kickers - The beam line designs need finalizing. (known by the proponents) RSVP Baseline Review – WBS 1.4 (AGS) Technical Aspects(cont’)

AGS RSVP Weekly Meeting P. Pile 5 May 2005 Summary Response to Relevant Charge Items  Meeting the criteria posed by KOPIO & MECO appears feasible. As indicated above, more support for this can and should be provided  Meeting the construction schedule for the AGS/Booster modifications appears feasible. Bring the complex up to full capability will likely be slower than anticipated.  No major missing items were found in the WBS for the AGS/Booster upgrade construction Current Construction Cost [$M ‘05] Current total: contingency (we believe this to be adequate) RSVP Baseline Review – WBS 1.4 (AGS)

AGS RSVP Weekly Meeting P. Pile 5 May 2005  Our interactions with the committee since the close- out were confined to RSVP operations. We were asked to develop operations costs and schedules not only for “normal” RHIC operations but also for three additional scenarios – 1.“unhealthy RHIC” - RHIC runs every other year 2.No RHIC, RSVP runs stand-alone for 25 weeks per year 3.No RHIC, RSVP runs stand-alone for 42 weeks per year RSVP Baseline Review – postscript

AGS RSVP Weekly Meeting P. Pile 5 May 2005 The results, part 1

AGS RSVP Weekly Meeting P. Pile 5 May 2005 The results, part 2

AGS RSVP Weekly Meeting P. Pile 5 May 2005 WBS 1.2 K0PI0 – AGS related issues –No recommendations relating directly to AGS –28% contingency too low RSVP Baseline Review – General

AGS RSVP Weekly Meeting P. Pile 5 May 2005 WBS 1.3 MECO Detectors – AGS Related issues –Extinction magnet (RFMM) “The extinction factor is crucial to the success of the experiment. The RF modulated magnet is important to guarantee achievement of the goal. The subcommittee did not feel technically qualified to judge the extinction magnet and refers it to the AGS subcommittee.” –The WBS needs to be reworked to put some of the tasks into the accelerator project. Examples include the extinction magnet and the proton target, where the AGS staff will apply their expertise to their proper operation. The experimenters can still contribute their ideas on the design. –….contingency is just too small for a project with the identified uncertainties. RSVP Baseline Review – General

AGS RSVP Weekly Meeting P. Pile 5 May 2005 WBS 1.5 MECO Magnets – AGS Related issues –We applaud the features of the plan to promote buy-in and ownership by BNL. Using the cryogenic capability to supply the refrigerator system, using the power supply group to supply that feature and the quench protection is a good start of that effort. We recommend that the vacuum system, magnet measurement and cryostat assembly around the cold mass may be other candidates for buy-in. –There are several areas where there are closely coupled interfaces. For this reason, it is recommended that EM loads, field analysis, and structural analyses of closely interfaced items such as the production target, radiation shield, anti proton absorber windows be performed by the magnet group. RSVP Baseline Review – General

AGS RSVP Weekly Meeting P. Pile 5 May 2005 WBS 1.5 MECO Magnets – AGS Related issues (cont’) –No safety issues were identified; however, it is recognized that this project will require a number of safety reviews. Therefore, we recommend that ES&H reviews should be explicitly included in schedules and manpower plans. –The reviewers commend the plan to adopt as much of the RHIC power supply and control system designs and control software as possible. This will be advantageous for spares, operation, and maintenance. –The reviewers concur with the manpower and management plans. MIT, BNL-C-AD, and SMG all have extremely well qualified and experienced managers and key personnel assigned to the magnet project. MIT will require a peak of 15 people; currently ~7.5 are available. This shortfall is planned to be covered by new hires. –Contingencies ranged from 14-38% and appear to be reasonable. RSVP Baseline Review – General

AGS RSVP Weekly Meeting P. Pile 5 May 2005 –RSVP Baseline Review written report – with this I assume some of the “findings” will be converted to “recommendations” and we’ll need to formally respond –With this and the HEPAP RSVP Sub-committee report (due 18 May), Mike Turner (Assistant Director for the NSF Mathematical and Physical Sciences Directorate) will decide the if he is going to support the project. If he decides to support RSVP, he will then ask the NSF Science Board to concur with his decision (somewhere around mid-August). –The Science board will probably not give the go-ahead to release the FY05 $'s until the Sept meeting.. RSVP project office must get the right paperwork to the board a month before the relevant meeting. RSVP – Next Steps

AGS RSVP Weekly Meeting P. Pile 5 May 2005 –RSVP Level 2 managers are meeting with Kotcher tomorrow so project office guidance may follow –Note from Stephanie: “April expense for baselining of RSVP was $94K. The balance available on the bridge loan provided by BSA is only $68K of which only $22K is available for continued labor expense. At your current level of effort, work must stop on or before Tuesday, May 10.” i.e. we’re done until we get additional funds. I expect we’ll get K0PI0(?$) and MECO (~$140K) funds soon for experiment specific work RSVP – Next Steps

AGS RSVP Weekly Meeting P. Pile 5 May 2005 Archive

AGS RSVP Weekly Meeting P. Pile 5 May 2005 Management Contingency Reminder – still alive